E02D 1/00
|
Investigation of foundation soil in situ |
E02D 1/02
|
Investigation of foundation soil in situ before construction work |
E02D 1/04
|
Sampling of soil |
E02D 1/06
|
Sampling of ground water |
E02D 1/08
|
Investigation of foundation soil in situ after finishing the foundation structure |
E02D 3/00
|
Improving or preserving soil or rock, e.g. preserving permafrost soil |
E02D 3/02
|
Improving by compacting |
E02D 3/08
|
Improving by compacting by inserting stones or lost bodies, e.g. compaction piles |
E02D 3/10
|
Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains |
E02D 3/11
|
Improving or preserving soil or rock, e.g. preserving permafrost soil by thermal, electrical or electrochemical means |
E02D 3/12
|
Consolidating by placing solidifying or pore-filling substances in the soil |
E02D 3/026
|
Improving by compacting by rolling with rollers usable only for or specially adapted for soil compaction, e.g. sheepsfoot rollers |
E02D 3/032
|
Trench rollers |
E02D 3/039
|
Slope rollers |
E02D 3/046
|
Improving by compacting by tamping or vibrating, e.g. with auxiliary watering of the soil |
E02D 3/054
|
Improving by compacting by tamping or vibrating, e.g. with auxiliary watering of the soil involving penetration of the soil, e.g. vibroflotation |
E02D 3/061
|
Tampers with directly acting explosion chambers |
E02D 3/068
|
Vibrating apparatus operating with systems involving reciprocating masses |
E02D 3/074
|
Vibrating apparatus operating with systems involving rotary unbalanced masses |
E02D 3/115
|
Improving or preserving soil or rock, e.g. preserving permafrost soil by thermal, electrical or electrochemical means by freezing |
E02D 5/00
|
Bulkheads, piles, or other structural elements specially adapted to foundation engineering |
E02D 5/02
|
Sheet piles or sheet pile bulkheads |
E02D 5/03
|
Prefabricated parts |
E02D 5/04
|
Prefabricated parts made of steel |
E02D 5/06
|
Fitted piles or other elements specially adapted for closing gaps between two sheet piles or between two walls of sheet piles |
E02D 5/08
|
Locking forms; Edge joints; Pile crossings; Branch pieces |
E02D 5/10
|
Prefabricated parts made of concrete or reinforced concrete |
E02D 5/12
|
Locking forms; Edge joints; Pile crossings; Branch pieces |
E02D 5/14
|
Sealing joints between adjacent piles |
E02D 5/16
|
Auxiliary devices rigidly or detachably arranged on sheet piles for facilitating assembly |
E02D 5/18
|
Bulkheads or similar walls made solely of concrete in situ |
E02D 5/20
|
Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ |
E02D 5/22
|
Piles |
E02D 5/24
|
Prefabricated piles |
E02D 5/26
|
Prefabricated piles made of timber with or without reinforcement; Means affording protection against spoiling of the wood; Self-cleaning of piles placed in water |
E02D 5/28
|
Prefabricated piles made of steel |
E02D 5/30
|
Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete |
E02D 5/32
|
Prefabricated piles with arrangements for setting in position by fluid jets |
E02D 5/34
|
Concrete or concrete-like piles cast in position |
E02D 5/36
|
Concrete or concrete-like piles cast in position making without use of mould-pipes or other moulds |
E02D 5/38
|
Concrete or concrete-like piles cast in position making by use of mould-pipes or other moulds |
E02D 5/40
|
Concrete or concrete-like piles cast in position making by use of mould-pipes or other moulds in open water |
E02D 5/42
|
Concrete or concrete-like piles cast in position making by use of mould-pipes or other moulds by making use of pressure liquid or pressure gas for compacting the concrete |
E02D 5/44
|
Concrete or concrete-like piles cast in position making by use of mould-pipes or other moulds with enlarged footing or enlargements at the bottom of the pile |
E02D 5/46
|
Concrete or concrete-like piles cast in position making in situ by forcing bonding agents into gravel fillings or the soil |
E02D 5/48
|
Piles varying in construction along their length |
E02D 5/50
|
Piles comprising both precast concrete portions and concrete portions cast in situ |
E02D 5/52
|
Piles composed of separable parts, e.g. telescopic tubes |
E02D 5/54
|
Piles with prefabricated supports or anchoring parts; Anchoring piles |
E02D 5/56
|
Screw piles |
E02D 5/58
|
Prestressed concrete piles |
E02D 5/60
|
Piles with protecting cases |
E02D 5/62
|
Compacting the soil at the footing or in a casing by forcing cement or like material through tubes |
E02D 5/64
|
Repairing piles |
E02D 5/66
|
Mould-pipes or other moulds |
E02D 5/68
|
Mould-pipes or other moulds for making bulkheads |
E02D 5/70
|
Mould-pipes or other moulds for making sheet piles |
E02D 5/72
|
Pile shoes |
E02D 5/74
|
Means for anchoring structural elements or bulkheads |
E02D 5/76
|
Anchorings for bulkheads or sections thereof |
E02D 5/80
|
Ground anchors |
E02D 7/00
|
Methods or apparatus for placing sheet pile bulkheads, piles, mould-pipes, or other moulds |
E02D 7/02
|
Placing by driving |
E02D 7/04
|
Hand pile-drivers |
E02D 7/06
|
Power-driven drivers |
E02D 7/08
|
Drop drivers with free-falling hammer |
E02D 7/10
|
Power-driven drivers with pressure-operated hammer |
E02D 7/12
|
Drivers with explosion chambers |
E02D 7/14
|
Components for drivers |
E02D 7/16
|
Scaffolds for drivers |
E02D 7/18
|
Placing by vibrating |
E02D 7/20
|
Placing by pressure or pulling power |
E02D 7/22
|
Placing by screwing down |
E02D 7/24
|
Placing by using fluid jets |
E02D 7/26
|
Placing by using several means simultaneously |
E02D 7/28
|
Placing of hollow piles or mould-pipes by means arranged inside the piles or pipes |
E02D 7/30
|
Placing of hollow piles or mould-pipes by means arranged inside the piles or pipes by driving cores |
E02D 9/00
|
Removing sheet pile bulkheads, piles, mould-pipes, or other moulds |
E02D 9/02
|
Removing sheet pile bulkheads, piles, mould-pipes, or other moulds by withdrawing |
E02D 9/04
|
Removing sheet pile bulkheads, piles, mould-pipes, or other moulds by cutting-off under water |
E02D 11/00
|
Methods or apparatus for both placing and removing sheet pile bulkheads, piles, or mould-pipes |
E02D 13/00
|
Accessories for placing or removing piles or bulkheads |
E02D 13/02
|
Accessories for placing or removing piles or bulkheads specially adapted for placing or removing bulkheads |
E02D 13/04
|
Guide devices; Guide frames |
E02D 13/06
|
Accessories for placing or removing piles or bulkheads for observation while placing |
E02D 13/08
|
Removing obstacles |
E02D 13/10
|
Follow-blocks of pile-drivers or like devices |
E02D 15/00
|
Handling building or like materials for hydraulic engineering or foundations |
E02D 15/02
|
Handling of bulk concrete specially for foundation purposes |
E02D 15/04
|
Placing concrete in mould-pipes, pile tubes, boreholes, or narrow shafts |
E02D 15/06
|
Placing concrete under water |
E02D 15/08
|
Sinking workpieces into water or soil |
E02D 15/10
|
Placing gravel or like material under water |
E02D 17/00
|
Excavations; Bordering of excavations; Making embankments |
E02D 17/02
|
Foundation pits |
E02D 17/04
|
Bordering or stiffening the sides of foundation pits |
E02D 17/06
|
Foundation ditches or narrow shafts |
E02D 17/08
|
Bordering or stiffening the sides of ditches or narrow shafts for foundations |
E02D 17/10
|
Covering trenches for foundations |
E02D 17/12
|
Back-filling of foundation trenches or ditches |
E02D 17/13
|
Foundation slots; Implements for making these slots |
E02D 17/16
|
Loosening of soil or rock, under water |
E02D 17/18
|
Making embankments |
E02D 17/20
|
Securing of slopes or inclines |
E02D 19/00
|
Keeping dry foundation sites or other areas in the ground |
E02D 19/02
|
Restraining of open water |
E02D 19/04
|
Restraining of open water by coffer-dams |
E02D 19/06
|
Restraining of underground water |
E02D 19/08
|
Restraining of underground water by employing open ditches arranged below the level of the water |
E02D 19/10
|
Restraining of underground water by lowering level of ground water |
E02D 19/12
|
Restraining of underground water by damming or interrupting the passage of underground water |
E02D 19/14
|
Restraining of underground water by damming or interrupting the passage of underground water by freezing the soil |
E02D 19/16
|
Restraining of underground water by damming or interrupting the passage of underground water by placing or applying sealing substances |
E02D 19/18
|
Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons |
E02D 19/20
|
Restraining of underground water by damming or interrupting the passage of underground water by displacing the water, e.g. by compressed air |
E02D 19/22
|
Lining sumps in trenches |
E02D 23/00
|
Caissons; Construction or placing of caissons |
E02D 23/02
|
Caissons able to be floated on water and to be lowered into water in situ |
E02D 23/04
|
Pneumatic caissons |
E02D 23/06
|
Bringing persons or material into, or out of, compressed air caissons |
E02D 23/08
|
Lowering or sinking caissons |
E02D 23/10
|
Caissons filled with compressed air |
E02D 23/12
|
Inclined lowering |
E02D 23/14
|
Decreasing the skin friction while lowering |
E02D 23/16
|
Jointing caissons to the foundation soil, specially to uneven foundation soil |
E02D 25/00
|
Joining caissons or like sunk units to each other under water |
E02D 27/00
|
Foundations as substructures |
E02D 27/01
|
Flat foundations |
E02D 27/02
|
Flat foundations without substantial excavation |
E02D 27/04
|
Flat foundations in water or on quicksand |
E02D 27/06
|
Floating caisson foundations |
E02D 27/08
|
Reinforcements for flat foundations |
E02D 27/10
|
Deep foundations |
E02D 27/12
|
Pile foundations |
E02D 27/14
|
Pile framings |
E02D 27/16
|
Foundations formed of separate piles |
E02D 27/18
|
Foundations formed by making use of caissons |
E02D 27/20
|
Caisson foundations combined with pile foundations |
E02D 27/22
|
Caisson foundations made by starting from fixed or floating artificial islands by using protective bulkheads |
E02D 27/24
|
Foundations constructed by making use of diving-bells |
E02D 27/26
|
Compacting soil locally before forming foundations; Construction of foundation structures by forcing binding substances into gravel fillings |
E02D 27/28
|
Stressing the soil or the foundation structure while forming foundations |
E02D 27/30
|
Foundations made with permanent use of sheet pile bulkheads, walls of planks, or sheet piling boxes |
E02D 27/32
|
Foundations for special purposes |
E02D 27/34
|
Foundations for sinking or earthquake territories |
E02D 27/35
|
Foundations formed in frozen ground, e.g. in permafrost soil |
E02D 27/36
|
Foundations formed in moors or bogs |
E02D 27/38
|
Foundations for large tanks, e.g. oil tanks |
E02D 27/40
|
Foundations for dams across valleys or for dam constructions |
E02D 27/42
|
Foundations for poles, masts, or chimneys |
E02D 27/44
|
Foundations for machines, engines, or ordnance |
E02D 27/46
|
Foundations for supply conduits or other canals |
E02D 27/48
|
Foundations inserted underneath existing buildings or constructions |
E02D 27/50
|
Anchored foundations |
E02D 27/52
|
Submerged foundations |
E02D 29/00
|
Underground or underwater structures; Retaining walls |
E02D 29/02
|
Retaining or protecting walls |
E02D 29/05
|
Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench |
E02D 29/07
|
Tunnels or shuttering therefor preconstructed as a whole or continuously made, and moved into place on the water-bed, e.g. into a preformed trench |
E02D 29/09
|
Constructions or methods of constructing, in water, not otherwise provided for |
E02D 29/12
|
Manhole shafts; Other inspection or access chambers; Accessories therefor |
E02D 29/14
|
Covers for manholes or the like; Frames for covers |
E02D 29/16
|
Arrangement or construction of joints in foundation structures |
E02D 29/045
|
Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them |
E02D 29/055
|
Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench further excavation of the cross-section proceeding underneath an already installed part of the structure, e.g. the roof of a tunnel |
E02D 29/063
|
Tunnels submerged into, or built in, open water |
E02D 29/067
|
Floating tunnels; Submerged bridge-like tunnels, i.e. tunnels supported by piers or the like above the water-bed |
E02D 29/073
|
Tunnels or shuttering therefor assembled from sections individually sunk onto, or laid on, the water-bed, e.g. in a preformed trench |
E02D 29/077
|
Tunnels at least partially built beneath the water-bed characterised by being made by methods involving disturbance thereof all along the location line, e.g. by cut-and-cover or caisson methods |
E02D 31/00
|
Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution |
E02D 31/02
|
Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water |
E02D 31/04
|
Watertight packings for use under hydraulic pressure |
E02D 31/06
|
Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against corrosion by soil or water |
E02D 31/08
|
Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against transmission of vibrations or movements in the foundation soil |
E02D 31/10
|
Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure |
E02D 31/12
|
Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure against upward hydraulic pressure |
E02D 31/14
|
Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure against frost heaves in soil |
E02D 33/00
|
Testing foundations or foundation structures |
E02D 35/00
|
Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations |
E02D 37/00
|
Repair of damaged foundations or foundation structures |