METHOD AND SYSTEM FOR DETERMINING SHORT-CIRCUIT CURRENT OF GRID-FORMING POWER ELECTRONIC DEVICE, AND STORAGE MEDIUM, ELECTRONIC DEVICE, CHIP, PROGRAM PRODUCT AND PROGRAM
Disclosed in the present invention are a method and system for determining a short-circuit current of a grid-forming power electronic device. The method comprises: establishing a short-circuit equivalent model for a grid-forming power electronic device, and initializing a dynamic compensation current value to 0; acquiring a node voltage prediction value and a fixed branch short-circuit current prediction value on the basis of the present dynamic compensation current value and the short-circuit equivalent model for the grid-forming power electronic device; determining a power electronic device short-circuit current prediction value on the basis of the present fixed branch short-circuit current prediction value and the present dynamic compensation current value; determining the maximum current limit value, an active current limit value and a reactive current limit value of the power electronic device under an actual short-circuit fault; performing three-level amplitude limiting, and determining an active current value and a reactive current value after amplitude limiting; calculating a compensation current dynamic correction amount; and if the present compensation current dynamic correction amount is less than or equal to a preset threshold, determining that the present power electronic device short-circuit current prediction value is the short-circuit current actual value of the grid-forming power electronic device.
ELECTRIC POWER SCIENCE & RESEARCH INSTITUTE OF STATE GRID TIANJIN ELECTRIC POWER COMPANY (China)
STATE GRID TIANJIN ELECTRIC POWER COMPANY (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Huo, Xianxu
Yu, Jiancheng
Pang, Chao
Liu, Tao
Ding, Yi
Ma, Shiqian
Zhang, Jian
Zhao, Chenyang
Wang, Zhishuang
Abstract
The present application provides a system energy efficiency optimization method and apparatus based on a comprehensive energy demand, an electronic device, and a storage medium. The method comprises: in response to a received target comprehensive energy demand, on the basis of comprehensive energy demand parameters, operation parameters of a target system, and environmental loss parameters of the target system, constructing an energy efficiency optimization function of the target system (S210); on the basis of a balance relationship between the energy supply and the energy consumption and a device operation demand of transmitting energy, constructing constraint conditions for optimizing the energy efficiency of the target system (S220); and on the basis of the energy efficiency optimization function and the constraint conditions, using a target algorithm to process operation parameters of a plurality of devices by taking the operation parameters of the plurality of devices in the target system as population individuals to obtain device parameters of the target system meeting the target comprehensive energy demand (S230).
WUHAN NARI LIMITED LIABILITY COMPANY OF STATE GRID ELECTRIC POWER RESEARCH INSTITUTE (China)
STATE GRID HUBEI ELECTRIC POWER CO., LTD. (China)
STATE GRID ELECTRIC POWER RESEARCH INSTITUTE (China)
Inventor
Xu, Hui
Cheng, Lin
Zhang, Jing
Jiang, Yi
Zhou, Wen
Cheng, Lifeng
Wan, Chengde
Liu, Mengna
Cai, Yuru
Luo, Ziqiu
Yang, Xu
Zhang, Chuan
Xiao, Li
Abstract
The present invention relates to the technical field of power transmission and distribution monitoring. Disclosed are a method for performing condition monitoring and active protection of an oil-filled transformer. Combustible gas content data of measuring points in a tested oil-filled transformer is acquired by means of a plurality of channels, it is determined whether an internal fault has occurred, and tripping protection is performed, increasing the reliability of operation of the oil-filled transformer. Further provided are a non-transient readable recording medium storing a program for performing condition monitoring and active protection of an oil-filled transformer, and a data processing system comprising the medium. The program can be called by means of a processing circuit to execute the method above, thus the present invention is suitable for being popularized and used in device state detection in the power industry.
H02H 7/04 - Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions for transformers
H02H 1/00 - Details of emergency protective circuit arrangements
4.
METHOD AND APPARATUS FOR DETERMINING CURRENT AMPLITUDE OF CABLE, AND PROCESSOR
Disclosed in the present invention are a method and apparatus for determining the current amplitude of a cable, and a processor. The method comprises: acquiring a target current waveform of a cable within a certain duration (S101); correcting an initial current frequency of the cable on the basis of a phase difference between current waveforms of the cable within two adjacent periods in the target current waveform, so as to obtain a target current frequency of the cable (S102); determining a first number for complete-period sampling points on the basis of the target current frequency and a sampling frequency (S103), wherein the sampling frequency is used for indicating a time interval for collecting a current value on the target current waveform; selecting a second number of sampling points from the target current waveform on the basis of a first number of complete-period sampling points and the sampling frequency (S104), wherein there is a multiple relationship between the first number and the second number, and the second number is greater than the first number; and determining the current amplitude of the cable on the basis of current values corresponding to the second number of sampling points (S105).
ELECTRIC POWER SCIENCE & RESEARCH INSTITUTE OF STATE GRID TIANJIN ELECTRIC POWER COMPANY (China)
STATE GRID TIANJIN ELECTRIC POWER COMPANY (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Huo, Xianxu
Yu, Jiancheng
Pang, Chao
Liu, Tao
Ding, Yi
Ma, Shiqian
Zhang, Jian
Zhao, Chenyang
Wang, Zhishuang
Abstract
Provided are a method for optimizing system energy efficiency and apparatus based on an integrated energy requirement, an electronic device, and a storage medium. The method includes, in response to a received target integrated energy requirement, constructing the energy efficiency optimization function of a target system according to an integrated energy requirement parameter, the operating parameter of the target system, and the environment loss parameter of the target system; constructing a constraint condition for optimizing the energy efficiency of the target system based on the balance relationship between energy supply and energy consumption and a device operating requirement for transmitting energy; and based on the energy efficiency optimization function and the constraint condition, using a target algorithm, using operating parameters of multiple devices in the target system as population individuals.
ELECTRIC POWER SCIENCE & RESEARCH INSTITUTE OF STATE GRID TIANJIN ELECTRIC POWER COMPANY (China)
STATE GRID TIANJIN ELECTRIC POWER COMPANY (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Liu, Liqing
He, Chun
Zhang, Chi
Li, Songyuan
Wei, Jufang
Feng, Junji
Yao, Chuang
Duan, Minghui
Zhang, He
Abstract
The present application provides an internal inspection robot. The internal inspection robot comprises: a housing (1), wherein the housing (1) is configured as a closed structure formed by sequentially connecting a first housing (11) and a second housing (12) arranged opposite to each other, a third housing (13) and a fourth housing (14) arranged opposite to each other, and a fifth housing (15) and a sixth housing (16) arranged opposite each other, the first housing (11) and the second housing (12) are both configured as rectangular housings, the third housing (13) and the fourth housing (14) are both configured as circular arc-shaped housings, and the fifth housing (15) and the sixth housing (16) are both configured as ellipsoid-like housings; a gravity balancing device (2) arranged inside the housing (1), wherein the gravity balancing device (2) is configured to control the pose of the internal inspection robot; and a power device (3) and a plurality of sensor devices arranged on the surface of the housing (1), wherein the power device (3) is configured to receive a motion control signal from a control end and drive the internal inspection robot to move, and the plurality of sensor devices are respectively configured to provide sensing signals to the control end.
G01D 21/02 - Measuring two or more variables by means not covered by a single other subclass
7.
METHOD FOR CONSTRUCTING TRANSVERSE AUDIBLE NOISE MODEL FOR AN ELECTRIC TRANSMISSION CORRIDOR, MICROPHONE SUPPORT APPARATUS, AND AUDIBLE NOISE MEASUREMENT DEVICE
STATE GRID HENAN ELECTRIC POWER RESEARCH INSTITUTE (China)
GLOBAL ENERGY INTERCONNECTION RESEARCH INSTITUTE CO., LTD. (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Wang, Donghui
Zhang, Songyang
Zhang, Zhuangzhuang
Yang, Yi
Wan, Diming
Wang, Leilei
Yao, Degui
Lv, Zhongbin
Wang, Guangzhou
Nie, Jingkai
He, Qiang
Fan, Chao
Abstract
Provided are a method for constructing a transverse audible noise model for an electric transmission corridor, a microphone support apparatus, and an audible noise measurement device. The method for constructing the transverse audible noise model for the electric transmission corridor includes measuring noise at the background noise measurement point of the electric transmission corridor, the N noise measurement points of the electric transmission corridor, and the M noise verification points of the electric transmission corridor simultaneously; fitting an objective function
Provided are a method for constructing a transverse audible noise model for an electric transmission corridor, a microphone support apparatus, and an audible noise measurement device. The method for constructing the transverse audible noise model for the electric transmission corridor includes measuring noise at the background noise measurement point of the electric transmission corridor, the N noise measurement points of the electric transmission corridor, and the M noise verification points of the electric transmission corridor simultaneously; fitting an objective function
z
=
k
1
sin
(
k
2
x
)
+
k
3
e
?
+
k
5
x
3
+
k
6
x
2
+
k
7
x
+
k
8
?
indicates text missing or illegible when filed
Provided are a method for constructing a transverse audible noise model for an electric transmission corridor, a microphone support apparatus, and an audible noise measurement device. The method for constructing the transverse audible noise model for the electric transmission corridor includes measuring noise at the background noise measurement point of the electric transmission corridor, the N noise measurement points of the electric transmission corridor, and the M noise verification points of the electric transmission corridor simultaneously; fitting an objective function
z
=
k
1
sin
(
k
2
x
)
+
k
3
e
?
+
k
5
x
3
+
k
6
x
2
+
k
7
x
+
k
8
?
indicates text missing or illegible when filed
to a point sequence constructed based on a noise correction value DBnA and coordinates (xn, 0); and in response to determining that a mean error between DBnB and the objective function satisfies accuracy requirements, obtaining the transverse audible noise model for the electric transmission corridor.
Electric Power Science & Research Institute of State Grid Tianjin Electric Power Company (China)
State Grid Tianjin Electric Power Company (China)
State Grid Corporation of China (China)
Inventor
Liu, Liqing
He, Chun
Zhang, Chi
Li, Songyuan
Wei, Jufang
Feng, Junji
Yao, Chuang
Duan, Minghui
Zhang, He
Abstract
An internal inspection robot includes a housing, a gravity balancing apparatus, a power apparatus, and multiple sensor apparatuses. The housing is configured to be a sealed structure including a first housing, a second housing, a third housing, a fourth housing, a fifth housing, and a sixth housing. The gravity balancing apparatus is disposed inside the housing and configured to control the pose of the internal inspection robot. The power apparatus and the multiple sensor apparatuses are disposed on the surface of the housing. The power apparatus is configured to receive a motion control signal from a control terminal to drive the internal inspection robot to move. The multiple sensor apparatuses are configured to provide a sensing signal to the control terminal.
B25J 19/00 - Accessories fitted to manipulators, e.g. for monitoring, for viewingSafety devices combined with or specially adapted for use in connection with manipulators
POWER GRID VOLTAGE STABILITY ANALYSIS METHOD AND SYSTEM TAKING INTO ACCOUNT NEW ENERGY CONTROL SWITCHING, ELECTRONIC DEVICE, STORAGE MEDIUM AND COMPUTER PROGRAM PRODUCT
The present disclosure provides a power grid voltage stability analysis method and system taking into account new energy control switching, an electronic device, a storage medium and a computer program product. The method comprises: step 2: performing time domain simulation for a preset time on a mathematical model and a state transition model, if the new energy enters a ride-through state during the time domain simulation process, directly entering step 3, and otherwise outputting attention information and then entering step 3; step 3: on the basis of an electrical model, in a rated operation mode of a power system, calculating a power flow of the power system, and obtaining a terminal voltage of the new energy; step 4: on the basis of the electrical model and the mathematical model, in the rated operation mode of the power system, calculating the power flow of the power system, and obtaining a bus voltage of a POC bus; and, on the basis of the terminal voltage of the new energy, a threshold voltage for the new energy entering the ride-through state, and the bus voltage, outputting corresponding prompt information.
H02J 3/12 - Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
10.
OPERATION METHOD AND APPARATUS FOR DIGITAL TWIN SYSTEM OF POWER SYSTEM, AND DEVICE, MEDIUM AND PROGRAM PRODUCT
Disclosed in the embodiments of the present application are an operation method and apparatus for a digital twin system of a power system, and a device, a medium and a program product. The method comprises: on the basis of data collected in real time, determining Riemannian curvature approximations of a plurality of Riemannian manifolds in a high-dimensional feature space of a final convolutional layer of a data-driven model, so as to obtain an optimal Riemannian metric; using the optimal Riemannian metric to construct a geodesic tangent bundle based on the Riemannian manifolds; when the Riemannian manifolds are geodesically completed, determining that a digital twin system is a stable system; when the Riemannian manifolds are not geodesically completed, determining that the digital twin system is an unstable system; for the digital twin system which is a stable system, performing a deduction operation on the digital twin system; for the digital twin system which is an unstable system, performing a deduction operation on the digital twin system on the basis of a principle of least action, so as to obtain a deduction operation result; and converting the deduction operation result into a feature cluster of a low-dimensional feature space, thereby completing the operation of the digital twin system.
G06F 30/27 - Design optimisation, verification or simulation using machine learning, e.g. artificial intelligence, neural networks, support vector machines [SVM] or training a model
11.
PRE-STRESSED ANTI-VIBRATION HAMMER AND PRE-STRESS DETERMINATION METHOD AND SYSTEM
The present application provides a pre-stressed anti-vibration hammer and a pre-stress determination method and system, the pre-stressed anti-vibration hammer comprising a gapped steel strand, an assembly integrated hammer head and an anchoring clamp, wherein the gapped steel strand comprises a central layer round wire, a middle layer molded wire and an outer layer round wire from inside to outside; a gap is provided between the central layer round wire and the middle layer molded wire, and the gap is filled with a lubricating grease, such that the friction resistance between the central layer round wire and the middle layer molded wire is reduced, and pre-applying a stress to the central layer round wire is facilitated; the middle layer molded wire is of an arch structure, and the arch body structure increases the moment of inertia for a circle center, such that the bending rigidity of the steel strand is enhanced; and two ends of the central layer round wire are connected with the assembly integrated hammer head, the anchoring clamp is assembled in a hollow portion of one end of the assembly integrated hammer head away from the central layer round wire, and is configured to clamp the central layer round wire to which a target stress is pre-applied, a tensile stress generated by an impact load firstly counteracts the tensile stress generated between the outer layer round wire and a middle layer strand after the stress is pre-applied, and the bending rigidity of the steel strand can be increased.
STATE GRID HUNAN ELECTRIC POWER COMPANY LIMITED. (China)
ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID HUNAN ELECTRIC POWER COMPANY (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Tang, Haiguo
Zhou, Kehui
Zhu, Jiran
Kang, Tong
Wang, Yong
Kong, Lingchao
Zhou, Hengyi
Qi, Fei
Xiao, Hui
Su, Mei
Chen, Yandong
Lian, Zhijie
Zhang, Di
Zhang, Zhidan
Ren, Lei
Abstract
The present invention relates to the technical field of power electronic conversion. Disclosed are an off-grid and grid-connected state switching control method and control system for a grid-forming energy storage converter. The method comprises: S1, when a grid-connected relay for target energy storage is turned off and is in an off-grid state, a converter using a power single-loop control strategy; S2, measuring the voltage of a power grid under the power single-loop control strategy, and when the value of the voltage of the power grid is within a preset normal range, the converter performing a pre-synchronization algorithm; S3, in the pre-synchronization algorithm, realizing the voltage amplitude consistency and phase consistency between a target converter and the power grid; S4, when the grid-connected relay for target energy storage is turned on and is in a grid-connected transient state, the converter using a control strategy of cascading a power loop with a virtual impedance loop; and S5, after a grid-connected steady state, the converter using a control strategy of cascading the power loop with voltage and current double loops. The present invention solves the problems in respect of large current surges and unstable states during switching occuring in existing off-grid and grid-connected state switching operation strategies.
Disclosed in the present invention are a shared energy storage power station energy management method and system considering cluster division, which belongs to the technical field of energy storage. The method comprises: according to requirements, dividing a shared energy storage power station into a plurality of clusters, each cluster comprising a plurality of battery energy storage units; on the basis of parameters of the shared energy storage power station in a time period t and electricity prices in cluster-involved markets, generating a battery energy storage unit parameter table; acquiring a power demanded by a power grid for shared energy storage in a time period T; and allocating the power of each battery energy storage unit in the power station in the time period T. The present invention uses a battery energy storage unit cluster division method considering a sharing mechanism, and can increase the total income of the shared energy storage power station while considering SOC conditions of the battery energy storage units. The present method considers both economic efficiency and SOC consistency, thereby satisfying dispatchability requirements while ensuring the system economic efficiency.
STATE GRID ELECTRIC POWER RESEARCH INSTITUTE (China)
Inventor
Xue, Yusheng
Xie, Dongliang
Wang, Chuhao
Xue, Feng
Cai, Linjun
Zhang, Huilin
Abstract
Disclosed in the present invention are a collaborative optimization method and system for multi-region energy storage and thermal power participation adequacy preventive control. The method comprises: setting an energy-storage total target outflow electricity quantity of each region; generating a feasible path library of an energy-storage charging and discharging policy of each region; selecting a reference path of each region, and constructing an energy-storage path set; under a given energy-storage path set, optimizing a global thermal power startup and shutdown policy; optimizing the energy-storage charging and discharging policy of each region without changing policies of other regions; using an optimal path of each region to update the energy-storage path set; determining whether the energy-storage path set or the number of iterations meets a preset convergence condition; if the energy-storage path set or the number of iterations meets the preset convergence condition, proceeding to the next step, otherwise, continuing to optimize the global thermal power startup and shutdown policy; and optimizing and outputting an energy-storage charging and discharging and thermal power startup and shutdown policy. The present invention can take power-electricity quantity coupling characteristics and startup and shutdown characteristics into comprehensive consideration to realize collaborative optimization of an energy-storage scheduling plan and a thermal power startup and shutdown plan within a given time scale, thereby effectively preventing and controlling operation risks of a power grid, and reducing scheduling control costs.
State Grid Hunan electric Power Company Limited (China)
Electric Power Research Institute of State Grid Hunan Electric Power Company (China)
State Grid Corporation of China (China)
Hunan Xiangdian TEST & RESEARCH Institute Co., Ltd. (China)
Inventor
Tang, Haiguo
Zhou, Kehui
Zhu, Jiran
Kang, Tong
Wang, Yong
Kong, Lingchao
Zhou, Hengyi
Qi, Fei
Xiao, Hui
Su, Mei
Chen, Yandong
Lian, Zhijie
Zhang, Di
Zhang, Zhidan
Ren, Lei
Abstract
The present invention relates to the technical field of power electronics converters and discloses a grid-forming energy storage converter on/off-grid switching control method and system, where the method includes the following steps: S1: using a single-loop power control strategy in an off-grid state when an on-grid relay of target energy storage drops out; S2: using a parallel virtual impedance loop-based power control strategy in a transient on-grid state when the on-grid relay of target energy storage pulls in; and S3: using a cascaded dual-loop power control strategy with a virtual admittance voltage loop and an inner current loop when a stable on-grid state is established. The present invention solves the problems of large current impact and unstable switching process state in the existing working strategy for on/off-grid switching in the prior art.
H02J 3/24 - Arrangements for preventing or reducing oscillations of power in networks
G05B 11/42 - Automatic controllers electric with provision for obtaining particular characteristics, e.g. proportional, integral, differential for obtaining a characteristic which is both proportional and time-dependent, e.g. P. I., P. I. D.
H02J 3/18 - Arrangements for adjusting, eliminating or compensating reactive power in networks
16.
SPHERICAL SENSOR INTEGRATING ULTRASOUND AND ULTRA HIGH FREQUENCY FOR USE IN CONVERTER TRANSFORMER, AND SENSING SYSTEM
The present application relates to a spherical sensor integrating ultrasound and ultra high frequency for use in a converter transformer, and a sensing system. An optical fiber sensing and processing system is connected to a spherical optical fiber ultrasound sensing unit, and an ultra high frequency sensing unit is connected to a data acquisition card; the optical fiber sensing and processing system is connected to a wave filter via the data acquisition card, and the wave filter is connected to a computer; the spherical optical fiber ultrasound sensing unit is in sealed connection with the ultra high frequency sensing unit via a connection rod, and the side of the ultra high frequency sensing unit furthest from the connection rod is in sealed connection with a sensing assembly. The spherical optical fiber ultrasound sensing unit detects ultrasonic signals from all directions inside an oil tank of a converter transformer to be tested.
ELECTRIC POWER SCIENCE &RESEARCH INSTITUTE OF STATE GRID TIANJIN ELECTRIC POWER COMPANY (China)
STATE GRID TIANJIN ELECTRIC POWER COMPANY (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
He, Jin
He, Chun
Li, Songyuan
Tang, Qinghua
Zhang, Chi
Chen, Rong
Zhao, Qi
Li, Jin
Song, Xiaobo
Han, Yue
Cao, Meng
Li, Lin
Li, Suya
Dong, Yanwei
Meng, Zhengzheng
Abstract
Provided are an imaging method and system for residual stress of a basin insulator and a method for preparing a test block. The imaging method includes cutting and preparing a standard industrial sample of a basin insulator and testing the acoustoelastic coefficient of the standard industrial sample; then obtaining the residual stress data of the basin insulator and obtaining the spatial point sound velocity distribution of the basin insulator; finally, obtaining a stress distribution cloud map of the basin insulator by calculation of the attribute value and the coordinate data of a to-be-measured location, and performing reliability verification based on the residual stress data.
G01N 1/44 - Sample treatment involving radiation, e.g. heat
G01N 29/06 - Visualisation of the interior, e.g. acoustic microscopy
G01N 29/07 - Analysing solids by measuring propagation velocity or propagation time of acoustic waves
G01N 29/22 - Investigating or analysing materials by the use of ultrasonic, sonic or infrasonic wavesVisualisation of the interior of objects by transmitting ultrasonic or sonic waves through the object Details
EAST INNER MONGOLIA ELECTRIC POWER COMPANY LIMITED OF STATE GRID (China)
Inventor
Ji, Kunpeng
Liu, Bin
Han, Jingshan
Yang, Jialun
Zhao, Bin
Li, Danyu
Li, Peng
Liu, Chang
Zhang, Guoqiang
Wang, Jian
Zhan, Xueping
Zhang, Lichun
Gao, Shuyong
Feng, Zhenhua
Abstract
Provided in the present application are a passive-impact-type mechanical deicing device and method for an overhead line. The mechanical deicing device comprises an outer cover, an inner cover, an elastic energy storage mechanism, a bumping control mechanism and a bumping mechanism, wherein the bumping control mechanism comprises a traction block, a jaw and a jaw limiting cylinder; and the elastic energy storage mechanism comprises a first elastic member and a second elastic member, the first elastic member being pressed when the inner cover slides downwards, and the second elastic member being pressed when the jaw slides downwards, such that the load generated by icing of a conductor can be accumulated. In the device and method, the elastic energy storage mechanism is used to accumulate the load generated by icing of a conductor, and when the load exceeds a set threshold, the bumping control mechanism automatically triggers the bumping mechanism to move to generate an instantaneous impact load to remove the ice coated on the conductor. In this way, there is no need for a power source, and bumping and reset can be automatically triggered according to the change in icing without manual intervention, thereby ensuring the deicing effect, preventing large-amplitude vibration of the conductor during ice breaking, and greatly improving the deicing reliability and safety. The device is suitable for long-term operation in harsh field environment.
The present invention relates to an optical fiber laying device, an underground pipeline positioning method and system, a computer device, and a storage medium. The optical fiber laying device comprises: an optical fiber storage box, an optical fiber positioning box, and an optical fiber sensor, wherein the optical fiber sensor has one end fixed in the optical fiber storage box, and the other end fixed on the optical fiber positioning box. The optical fiber laying device has two working states: when the optical fiber laying device is used for detection, the optical fiber storage box and the optical fiber positioning box are respectively located at a starting point and an end point of an underground pipeline to be detected, and the optical fiber sensor is used for receiving excitation signals emitted by excitation sources pre-arranged in said underground pipeline; and when the optical fiber laying device is not in use, the optical fiber sensor is arranged in the optical fiber storage box, and the optical fiber storage box is connected to the optical fiber positioning box. The optical fiber sensor in the optical fiber laying device of the present invention can detect excitation signals in underground pipelines having different sizes, different types and different detection requirements, and by incorporating the underground pipeline positioning method, positioning is carried out, such that the limitation of existing positioning methods is effectively solved, and the positioning accuracy is further improved.
State Grid Smart Internet of Vehicles Co., Ltd (China)
STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER COMPANY (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Liu, Dunnan
Liu, Mingguang
Quan, Shengming
Wang, Wen
Yang, Xingang
Su, Shu
Zhang, Yue
Yang, Ye
Cao, Boyuan
Guo, Weijia
Li, Peijun
Tang, Xiao
Abstract
A method for aggregation regulation optimization of an electric vehicle load by considering a comprehensive response coefficient is disclosed. The method includes the following steps: Step 1, collecting electric vehicle charging information; Step 2, based on the electric vehicle charging information collected in Step 1, calculating aggregation regulation response indexes for user participation, and determining a weight of each aggregation regulation response index; Step 3, based on the calculation result of each aggregation regulation response index for user participation obtained in Step 2, calculating a comprehensive response coefficient of an electric vehicle; and Step 4, performing the aggregation regulation optimization of the electric vehicle load by using minimum load power deviation determined by a dispatching scheme and an actually considered comprehensive response coefficient as a target and using a load rate, a peak-valley difference and a load fluctuation rate after dispatching as constraints.
BEIJING SMARTCHIP MICROELECTRONICS TECHNOLOGY COMPANY LIMITED (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Xu, Jing
Wang, Dongshan
Fan, Lin
Du, Jun
Wang, Xin
Abstract
Disclosed in the present invention are an application post-downloading method and apparatus, a system-on-chip, a terminal, and a storage medium. The method comprises: a terminal compiling a source program of an application to be downloaded, so as to obtain a loadable file, and performing post-compilation on the loadable file, so as to obtain file header information, wherein the file header information comprises first running resource information and first storage space information of the loadable file in the terminal; on the basis of the first storage space information, a system-on-chip dynamically allocating the storage space of the system-on-chip, so as to obtain second storage space information; on the basis of the second storage space information, downloading the loadable file to the system-on-chip, so as to form an executable file; on the basis of the first running resource information, dynamically allocating running resources of the system-on-chip, so as to obtain second running resource information; and on the basis of the second storage space information and the second running resource information, running the executable file in the system-on-chip. In this way, the storage space of a system-on-chip can be saved on, and flexible application management can also be realized, thereby improving the usage experience of a user.
A power transmission line photonics-electronics converged long-distance monitoring device (10) and method. The device (10) comprises: a fiber grating demodulation module (101), used for transmitting a laser signal to a fiber grating sensor, receiving a first optical signal returned by the fiber grating sensor, demodulating the first optical signal, and outputting the demodulated first optical signal to an edge computing and signal return module (104); a convergence module (102), used for receiving sensing data of monitoring devices other than the fiber grating sensor on a power transmission line and converging the sensing data, and outputting the converged sensing data to an electro-optical conversion module (103); the electro-optical conversion module (103), used for receiving the converged sensing data and converting the converged sensing data into a second optical signal, and outputting the second optical signal to the edge computing and signal backhaul module (104); and the edge computing and signal return module (104), used for computing and encoding the demodulated first optical signal and the second optical signal, and returning the obtained encoded signals to a monitoring master station.
G01R 31/58 - Testing of lines, cables or conductors
G01D 5/353 - Mechanical means for transferring the output of a sensing memberMeans for converting the output of a sensing member to another variable where the form or nature of the sensing member does not constrain the means for convertingTransducers not specially adapted for a specific variable using optical means, i.e. using infrared, visible or ultraviolet light with attenuation or whole or partial obturation of beams of light the beams of light being detected by photocells influencing the transmission properties of an optical fibre
23.
DETERMINATION METHOD AND APPARATUS FOR MINIMUM STARTUP CAPACITY OF THERMAL POWER UNIT BASED ON VOLTAGE STABILIZATION
A determination method and apparatus for the minimum startup capacity of a thermal power unit based on voltage stabilization, an electronic device, a storage medium, and a computer program product. The method comprises: acquiring the load level and the output level of a power system; if a difference value between the output level and the load level is greater than a preset capacity, determining that the power system is a sending-end power grid, and calculating the minimum startup capacity of a thermal power unit of the sending-end power grid considering the voltage stability constraint; and if the output level is less than the load level, determining that the power system is a receiving-end power grid, and calculating the minimum startup capacity of a thermal power unit of the receiving-end power grid considering the voltage stability constraint. By means of the present method and apparatus, the calculation result is more accurate and reliable. System output arrangement and system thermal power unit planning based on the present method can ensure the system voltage stability and avoid new energy disordered development.
STATE GRID SMART GRID RESEARCH INSTITUTE CO., LTD. (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Zhou, Wandi
He, Zhiyuan
Liu, Yuan
Zhang, Sheng
Gao, Chong
Li, Pengzhi
Abstract
Disclosed in the present application are a self-energy-taking hybrid direct-current circuit breaker and an application method therefor. In the self-energy-taking hybrid direct-current circuit breaker, a breaking branch is connected to a through-current branch in parallel, a first end of a grounding branch is connected to the breaking branch, and a second end of the grounding branch is grounded. When a direct-current system operates stably, the through-current branch conducts a steady-state running current of the direct-current system, and when the direct-current system breaks down, a self-energy-taking capacitor in the breaking branch assists a power electronic device in achieving the breaking of a fault current.
H02H 3/087 - Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition, with or without subsequent reconnection responsive to excess current for DC applications
H03K 17/56 - Electronic switching or gating, i.e. not by contact-making and -breaking characterised by the use of specified components by the use, as active elements, of semiconductor devices
25.
POWER GRID REGULATION AND CONTROL MODEL TRAINING METHOD AND SYSTEM, COMPUTER DEVICE, AND STORAGE MEDIUM
The present invention relates to the field of power automation. Disclosed are a power grid regulation and control model training method and system, a computer device, and a storage medium. The method comprises: acquiring training data of a power grid regulation and control model, and grouping the training data to obtain a plurality of training data groups; training a plurality of preset learning bodies in parallel by means of the plurality of training data groups on the basis of a one-to-one correspondence between the training data groups and the learning bodies to obtain a plurality of execution bodies, wherein when the learning bodies are trained by means of the training data groups, the training data groups are divided into a plurality of training data units, a training effect of each training data unit is acquired to obtain a shared training data unit, and the shared training data unit is shared with other training data groups than the training data group to which the shared training data unit belongs; and finally, combining the plurality of execution bodies to obtain a power grid regulation and control model. By means of parallel training and parallel prediction, quality is improved on the basis of quantity, and shared learning of high-quality sample data is achieved, thereby effectively improving a training effect, and being capable of effectively reducing the training time of the power grid regulation and control model under a big data condition.
G06F 18/214 - Generating training patternsBootstrap methods, e.g. bagging or boosting
26.
VOLTAGE STABILITY ANALYSIS METHOD AND SYSTEM BASED ON MULTI-SWING CHARACTERISTICS OF VOLTAGE DISTURBANCE CURVE, ELECTRONIC DEVICE, STORAGE MEDIUM, AND COMPUTER PROGRAM PRODUCT
The embodiments of the present disclosure provide a voltage stability analysis method based on multi-swing characteristics of a voltage disturbance curve, comprising: a main server obtaining a voltage disturbance curve of at least one node, and analyzing each voltage disturbance curve on the basis of multi-swing characteristics to determine analysis time and the number of curve wavelet package decomposition processing layers corresponding to each voltage disturbance curve; the main server establishing an analysis task corresponding to each node and issuing the analysis task to at least one sub-server; for any sub-server, on the basis of the analysis time and the number of curve wavelet package decomposition processing layers, performing wavelet package analysis on the voltage disturbance curve to obtain a wavelet decomposition coefficient of each layer corresponding to the voltage disturbance curve; for said sub-server, determining the characteristic value of each layer on the basis of the wavelet decomposition coefficient of each layer corresponding to the voltage disturbance curve; and for said sub-server, determining a voltage stability analysis result of the node on the basis of the feature value of each layer corresponding to the voltage disturbance curve and the feature threshold of each layer.
H02J 3/00 - Circuit arrangements for ac mains or ac distribution networks
G06F 17/11 - Complex mathematical operations for solving equations
G06F 30/20 - Design optimisation, verification or simulation
H02J 13/00 - Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the networkCircuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
27.
ALTERNATING CURRENT/DIRECT CURRENT MULTI-AIR-GAP MAGNETORESISTIVE CURRENT SENSOR AND CURRENT MEASUREMENT METHOD
CHINA ELECTRIC POWER RESEARCH INSTITUTE WUHAN BRANCH (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Zhou, Feng
Yu, Jicheng
Liang, Siyuan
Yue, Changxi
Lei, Min
Yin, Xiaodong
Li, Dengyun
Xu, Zili
Xiong, Kui
Zhu, Kai
Li, Jiaxin
Abstract
The present invention provides an alternating current/direct current multi-air-gap magnetoresistive current sensor and a current measurement method. The alternating current/direct current multi-air-gap magnetoresistive current sensor comprises: a magnetic-to-electric conversion unit used for acquiring a magnetic field signal of a target current-carrying wire to which a current to be measured is introduced, converting the magnetic field signal into an electric signal and then outputting the electric signal to a signal processing unit, wherein the magnetic-to-electric conversion unit uses a multi-air-gap band-based closed-loop iron core type structure; the signal processing unit used for amplifying the electric signal and then outputting the electric signal to a feedback compensation unit; and the feedback compensation unit used for adjusting a feedback current on the basis of the amplified voltage signal to enable a novel magnetoresistive element to always work at zero magnetic flux, measuring the value of the feedback current, on the basis of the value of the feedback current, obtaining the value of the current to be measured, and outputting the value of the current to be measured. According to the alternating current/direct current multi-air-gap magnetoresistive current sensor and the current measurement method provided by the embodiments of the present invention, the measurement performance of the current sensor is improved and the problem of the difficulty in achieving both high accuracy and a wide frequency domain of alternating current/direct current measurement is solved.
G01R 19/00 - Arrangements for measuring currents or voltages or for indicating presence or sign thereof
G01R 15/20 - Adaptations providing voltage or current isolation, e.g. for high-voltage or high-current networks using galvano-magnetic devices, e.g. Hall-effect devices
28.
SUSPENSION FIELD MILL, AND METHOD FOR MEASURING SPACE ELECTRIC FIELD
A suspension field mill, and a method for measuring a space electric field. The suspension field mill comprises: a suspension electric field differential induction module (1), a signal processing module (2), a suspension electric field isolation module (3) and an upper computer, wherein the suspension electric field differential induction module (1) is provided with a first induction probe (12) and a second induction probe (13); the first induction probe (12) and the second induction probe (13) are both provided with several electrode pairs; the suspension electric field differential sensing module (1) is further provided with a first driving mechanism (11) and a second driving mechanism (14); the first driving mechanism (11) drives the first induction probe (12) to rotate in a space electric field to generate a first induced current; the second driving mechanism (14) drives the second induction probe (13) to rotate in the space electric field to generate a second induced current; and the signal processing module (2) converts two induction current signals into two direct-current voltage signals, and determines a measurement value of the space electric field according to a difference value between the two direct-current voltage signals. In the present suspension field mill, a first induction probe (12) and a second induction probe (13) having a plurality of pairs of electrodes are provided, thereby greatly improving the frequency of an output signal of the field mill.
A method and apparatus for determining the safety inertia of a power grid system, and a computer device. The method comprises: determining a first safety inertia for ensuring safe operation of a power grid system when a frequency change rate after disturbance occurs in the power grid system exceeds a first threshold (S302); determining a second safety inertia for ensuring the safe operation of the power grid system when the frequency after the disturbance occurs in the power grid system is less than a second threshold (S304); and determining a target safety inertia according to the first safety inertia and the second safety inertia, wherein the target safety inertia is a safety inertia lower limit value for ensuring the safe operation of the power grid system (S306).
GLOBAL ENERGY INTERCONNECTION RESEARCH INSTITUTE CO., LTD. (China)
STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER COMPANY (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Zhao, Guoliang
Li, Weiguo
Shi, Qiuyu
Guo, Xianshan
Qiao, Guangyao
Li, Fangyi
Xu, Yunfei
Liu, Haijun
Jin, Yanjiao
Cheng, Zhe
Abstract
A vertical thyristor switch for a controllable surge arrester includes an insulating sleeve and a vertical cylindrical switch core body encapsulated inside the insulating sleeve. The switch core body includes thyristor valve sections, a reactor, driving units, a voltage equalizing assembly section, a structural member and a connecting member; and after being connected to the driving units on one side of the thyristor valve sections, the thyristor valve sections are arranged, together with the voltage equalizing assembly section, in a space of a lower section of the structural member, an upper section of the structural member is provided with the reactor, and components inside the switch core body are electrically connected through the connecting member.
H02H 9/04 - Emergency protective circuit arrangements for limiting excess current or voltage without disconnection responsive to excess voltage
31.
METHOD AND APPARATUS FOR DETERMINING VOLTAGE SUPPORT STRENGTH OF NEW-ENERGY POWER SYSTEM IN REAL TIME, AND DEVICE, STORAGE MEDIUM AND COMPUTER PROGRAM PRODUCT
Provided in the present application are a method and apparatus for determining the voltage support strength of a new-energy power system in real time, and a device, a storage medium and a computer program product. The method comprises: collecting a real-time bus operating voltage and a collection line current of a monitoring point of a new-energy power system; calculating a system Thevenin equivalent potential of the monitoring point according to the real-time bus operating voltage and the collection line current; calculating a short-circuit ratio and a critical short-circuit ratio of the monitoring point according to a nominal voltage, the system Thevenin equivalent potential and the real-time bus operating voltage of the monitoring point; calculating a short-circuit ratio safety margin of the monitoring point according to the short-circuit ratio and the critical short-circuit ratio of the monitoring point; and determining a strength classification result of the voltage support strength of the new-energy power system according to the short-circuit ratio safety margin of the monitoring point and a set voltage support strength classification criterion. The method greatly decreases electrical parameters involved in the calculation of a short-circuit ratio, improves the efficiency of an algorithm, and provides technical support for strength classification of a voltage support strength.
H02J 3/38 - Arrangements for parallelly feeding a single network by two or more generators, converters or transformers
H02J 3/00 - Circuit arrangements for ac mains or ac distribution networks
H02J 3/12 - Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
32.
SYSTEM FREQUENCY STABILITY CONTROL METHOD AND SYSTEM TAKING INTO CONSIDERATION NEW-ENERGY FREQUENCY MODULATION ENERGY CONSTRAINT
Disclosed in the present invention are a system frequency stability control method and system taking into consideration a new-energy frequency modulation energy constraint. The method comprises: calculating a lowest-frequency-point arrival time of a system under active disturbance; determining whether the lowest-frequency-point arrival time meets a frequency stability energy balance criterion, and acquiring a determination result; when the lowest-frequency-point arrival time does not meet the frequency stability energy balance criterion, determining available frequency modulation energy of each new-energy station; and in the previous time period of the lowest-frequency-point arrival time, sequentially adding the available frequency modulation energy of the new-energy stations to a frequency modulation sequence in ascending order of the magnitude of the available frequency modulation energy until a frequency modulation stability requirement is met, so as to complete system frequency stability control. In the present invention, from the perspective of energy, frequency stability is equivalent to the problem of whether disturbance energy and frequency modulation energy can be balanced, and the contribution of new-energy frequency modulation to the frequency is then equivalent to energy square blocks, such that the frequency stability is guaranteed by means of superimposed discrimination of the energy square blocks, and the requirement for new-energy frequency modulation energy is minimized.
State Grid Chongqing Electric Power Company Marketing Service Center (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Zhang, Jiaming
Zheng, Ke
Xiao, Ji
Cheng, Tao
Xu, Hongyu
Zou, Bo
Wan, Shuwei
Lv, Xinke
Chen, Bingling
Tan, Shishun
Zhou, Feng
He, Min
Xie, Guangcheng
Liu, Ningtao
Abstract
Provided are a metering abnormality analysis method and apparatus, a storage medium, and a computer device. The metering abnormality analysis method includes acquiring preliminary analysis data analyzed by a source-end system and determining at least one data filtering rule based on the preliminary analysis data (101); filtering the monitoring data of the source-end system based on the data filtering rule to obtain target metering abnormality data (102); comparing and analyzing the target metering abnormality data with preconfigured abnormal case data and determining at least one target case data from the abnormal case data (103); and performing multidimensional cluster analysis on the target metering abnormality data to obtain the aggregation level of the target metering abnormality data in multiple data dimensions and analyzing the cause of metering abnormality based on the target case data and the aggregation level (104).
State Grid Zhejiang Electric Power Company Marketing Service Center (China)
China Electric Power Research Institute Wuhan Branch (China)
State Grid Corporation of China (China)
Inventor
Zhou, Feng
Yu, Jicheng
Lei, Min
Yin, Xiaodong
Yue, Changxi
Liang, Siyuan
Li, Xiong
Li, He
Yao, Li
Li, Dengyun
Lu, Chunguang
Xiao, Tao
Xu, Zili
Liu, Wei
Zhu, Kai
Xiong, Kui
Abstract
An iron core-annular array multi-ring magnetosensitive current sensor and a current measurement method, the method comprising: using a first loop structure (101) to acquire a feedback current signal generated according to a first magnetic field signal generated by a primary side current; using a second loop structure (102) to measure a second magnetic field signal generated by the current of a wire in a coil; and using a digital processing unit (103) to calculate, according to the feedback current signal and the second magnetic field signal, the feature quantity that characterizes the current of the wire, and determining the current on the wire according to the feature quantity that characterizes the current of the wire.
G01R 15/20 - Adaptations providing voltage or current isolation, e.g. for high-voltage or high-current networks using galvano-magnetic devices, e.g. Hall-effect devices
35.
MEASUREMENT ANOMALY ANALYSIS METHOD AND APPARATUS, STORAGE MEDIUM AND COMPUTER DEVICE
STATE GRID CHONGQING ELECTRIC POWER COMPANY MARKETING SERVICE CENTER (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Zhang, Jiaming
Zheng, Ke
Xiao, Ji
Cheng, Tao
Xu, Hongyu
Zou, Bo
Wan, Shuwei
Lv, Xinke
Chen, Bingling
Tan, Shishun
Zhou, Feng
He, Min
Xie, Guangcheng
Liu, Ningtao
Abstract
A measurement anomaly analysis method and apparatus, a storage medium, and a computer device. The measurement anomaly analysis method comprises: acquiring first-order analysis data analyzed by a source-end system and, on the basis of the first-order analysis data, determining at least one data filtering rule (101); on the basis of the data filtering rule, performing a filtering operation on monitoring data of the source-end system to obtain target measurement anomaly data (102); performing contrastive analysis on the target measurement anomaly data and pre-configured anomaly case data to determine at least one piece of target case data from among the anomaly case data (103); and performing multi-dimensional clustering analysis on the target measurement anomaly data so as to obtain the degrees of aggregation of the target measurement anomaly data in a plurality of data dimensions and, on the basis of the target case data and the degrees of aggregation, analyzing a measurement anomaly cause (104).
Provided are a frequency modulation method, device and system based on a new energy support machine and an energy storage device, and a new energy field station. The method includes: acquiring a system frequency offset value; determining a frequency modulation scheme for the new energy support machine and/or the energy storage device according to the system frequency offset value; generating a frequency modulation instruction for the new energy support machine and/or the energy storage device according to the frequency modulation scheme, so that the new energy support machine and/or the energy storage device execute a corresponding frequency modulation instruction and modulate the system frequency. The method has high regularity, flexibility in rule adjustment and good real-time performance. When the system frequency of a power grid fluctuates, a new energy support machine with higher durability is selected to support the power grid. The electrochemical energy storage device with poorer durability is selected to support the power grid only when the frequency fluctuation of the system is excessive, thereby reducing the number of times the energy storage device is used, realizing the safe operation of the energy storage device, and improving the use safety of the energy storage device.
HANDAN POWER SUPPLY BRANCH OF STATE GRID HEBEI ELECTRONIC POWER COMPANY (China)
HANDAN XINHE ELECTRIC POWER CONSTRUCTION CO., LTD (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Zhang, Xiaolong
Ma, Liqun
Han, Qiang
Liu, Yu
Zhao, Ran
Wei, Ming
Tian, Zhijie
Ma, Jinghan
Abstract
A power transmission tower climbing device (100) and a climbing working robot (500), the power transmission tower climbing device comprising: a movement assembly (1), comprising a rotation arm mechanism (11) having a plurality of rotational degrees of freedom, two ends of the rotation arm mechanism each being provided with a clamping jaw mechanism (12) adapted to clamp a power transmission tower, the rotation arm mechanism being adapted to drive the clamping jaw mechanisms to rotate in the horizontal direction and the vertical direction for climbing and walking, and the rotation arm mechanism being provided with an installation interface adapted to assembly of a working mechanism (501); and a control system (2) in communication connection with the movement assembly, the control system being adapted to control the movement assembly to perform a climbing action and cross an obstacle. The tower climbing device can adapt to complex structure environments on power transmission towers, is adapted to perform aerial climbing and corresponding working operations in place of human, and can improve working efficiency and reduce potential safety hazards.
B62D 57/024 - Vehicles characterised by having other propulsion or other ground-engaging means than wheels or endless track, alone or in addition to wheels or endless track with ground-engaging propulsion means, e.g. walking members specially adapted for moving on inclined or vertical surfaces
B25J 9/06 - Programme-controlled manipulators characterised by multi-articulated arms
B25J 9/08 - Programme-controlled manipulators characterised by modular constructions
H02G 1/02 - Methods or apparatus specially adapted for installing, maintaining, repairing, or dismantling electric cables or lines for overhead lines or cables
E04H 12/08 - Structures made of specified materials of metal
38.
Dynamic defense system and method of new energy centralized control station network based on dynamic IP
State Grid Jiangxi Electric Power Research Institute (China)
State Grid Jiangxi Electric Power Co., Ltd. (China)
State Grid Corporation of China (China)
Inventor
Yang, Hao
Xu, Jian
Xiao, Yongcai
Zhang, Lingling
Pan, Shuhui
Abstract
A method of a new energy centralized control station network based on dynamic IP can determine the occurrence frequency and the occurrence interval of the abnormal traffic, further analyze and determine the defense state of a new energy centralized control station based on this, and execute the corresponding dynamic optimization solution according to different defense states, so that the IP address and the firewall of the new energy centralized control station can be dynamically adjusted to ensure the security performance of the new energy centralized control station, reduce the risk of external intrusion, effectively resist malicious network reconnaissance such as scanning attacks and ensure the stable operation of a new energy power generation system.
STATE GRID JIBEI ELECTRIC POWER COMPANY LIMITED RESEARCH INSTITUTION (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Liu, Yanzhang
Chen, Ning
Zhu, Lingzhi
Zhang, Lei
Sun, Rongfu
Ding, Ran
Wu, Linlin
Yao, Yiming
Xu, Man
Jiang, Dajun
Qian, Minhui
Wang, Xiangyan
Tang, Bingjie
Peng, Peipei
Abstract
Provided in the embodiments of the present disclosure are a new energy power station grid-connection adaptability analysis method and system. The new energy power station grid-connection adaptability analysis method comprises: a master dispatch station distributing computation tasks by means of an edge gateway; new energy substations receiving the computation tasks, and then asynchronously executing the computation tasks according to operation conditions; after the computation tasks are completed, each new energy substation compressing and encrypting a computation result and section information by means of the edge gateway, and returning same to the master dispatch station; and the master dispatch station executing grid-connection adaptability analysis according to the returned result. In the embodiments of the present disclosure, an existing centralized computation mode is expanded, and full use is made of computation resources at a new energy power station by means of introducing techniques related to edge computing, thereby improving the degree of fusion of multi-source data; moreover, network computing, data storage and advanced application are combined, such that various types of losses which are brought about by data transmission can be effectively reduced, thereby achieving a certain level of engineering application value.
H02J 13/00 - Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the networkCircuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
H02J 3/38 - Arrangements for parallelly feeding a single network by two or more generators, converters or transformers
40.
NETWORK DELAY IN-BAND TELEMETRY METHOD AND APPARATUS, ELECTRONIC DEVICE, AND STORAGE MEDIUM
STATE GRID SMART GRID RESEARCH INSTITUTE CO., LTD. (China)
CHINA ELECTRIC POWER RESEARCH INSTITUTE (China)
Inventor
Wu, Junmin
Liu, Chuan
Tao, Jing
Liu, Shidong
Su, Jian
Wang, Wanqiao
Abstract
Embodiments of the present invention relate to a network delay in-band telemetry method and apparatus, an electronic device, and a storage medium. The method comprises: acquiring whole network topology information, establishing a whole network topology view, and establishing a mathematical model for a whole network delay measurement problem; simplifying the mathematical model, and estimating a minimum vertex cover set of the whole network topology view; constructing a detection path set that meets a preset condition, and deploying a probe device set; mounting a probe host on each device in the probe device set, and sending a probe packet along a detection path taking the probe device as a starting point in the detection path set; controlling all network forwarding devices to add a plurality of information fields into the probe packet in the process of sending and/or forwarding the probe packet; extracting the plurality of information fields in the probe packet, and calculating link delay information on a probe packet path; and updating whole network link delay information on the basis of the link delay information of each probe device. Therefore, the real-time performance and accuracy of network delay measurement can be enhanced.
A method and apparatus for optimally configuring a capacity of a high-proportion new energy system, a device, and a medium, which belong to the field of new energy system optimization and are used for solving the problems of insufficient flexibility of the high-proportion new energy system during the heating period and difficult consumption of renewable energy. The method includes: constructing a high-proportion new energy system structure; establishing a concentrating solar power (CSP) unit model and a combined heat and power (CHP) unit model based on the proposed structure; establishing a high-proportion new energy system collaborative optimization model based on the proposed unit models; acquiring relevant data of various units and renewable resource data; and obtaining a capacity configuration and operation optimization scheme of various units in the high-proportion new energy system according to the established model, thereby improving the renewable energy consumption of the system.
STATE GRID SMART GRID RESEARCH INSTITUTE CO., LTD. (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Yang, Weitao
Zhang, Di
Zheng, Lin
Yang, Bingjian
Wang, Huafeng
Han, Huachun
Li, Qun
Li, Qiang
Abstract
Disclosed in the present disclosure are a direct-current converter station protection system and a control method therefor. The system comprises: a first analog quantity acquisition module used for acquiring analog quantity data in a direct-current converter station; a second analog quantity acquisition module used for acquiring analog quantity data in the direct-current converter station; a first protection device used for outputting a first protection action signal; a second protection device used for outputting a second protection action signal; a first protection exit action module used for outputting a protection action according to the first protection action signal; and a second protection exit action module used for outputting a protection action according to the second protection action signal. According to embodiments of the present disclosure, because both the first analog quantity acquisition module and the second analog quantity acquisition device are provided, when the data acquired by one of the analog quantity acquisition modules is wrong, misoperation of the direct-current converter station protection system is avoided, thereby improving the reliability of the direct-current converter station protection system.
H02H 7/12 - Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions for convertersEmergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions for rectifiers for static converters or rectifiers
H02H 7/122 - Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions for convertersEmergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions for rectifiers for static converters or rectifiers for inverters, i.e. DC/AC converters
H02H 7/125 - Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions for convertersEmergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions for rectifiers for static converters or rectifiers for rectifiers
H02H 1/00 - Details of emergency protective circuit arrangements
43.
Operation control method suitable for fire extinguishing system of extra-high voltage converter station
STATE GRID ANHUI ELECTRIC POWER RESEARCH INSTITUTE (China)
STATE GRID CORPORATION OF CHINA (China)
STATE POWER ECONOMIC RESEARCH INSTITUTE (China)
Inventor
Zhang, Jiaqing
Huang, Yubiao
Huang, Yong
Li, Jinzhong
Yang, Pengcheng
Tan, Jing
Wang, Liufang
Cheng, Dengfeng
Tian, Yu
Ke, Yanguo
Luo, Sha
Xie, Jia
Fan, Minghao
Li, Wei
Guo, Yi
Shang, Fengju
Liu, Rui
Su, Wen
Abstract
An operation control method suitable for a fire extinguishing system of an extra-high voltage converter station is provided. The method includes: after an upper computer control system receives a sound-light alarm signal, an alarm position signal, and a switch position dividing signal, starting a spray range prediction analysis subsystem for a fixed fire monitor; determining, by the spray range prediction analysis subsystem for the fixed fire monitor based on an external wind direction and an external wind speed, whether a range of a fire monitor effectively covers an entire area of a converter transformer; and if yes, automatically presetting a first fire monitor to which a first compressed air foam generation subsystem belongs and a second fire monitor to which a second compressed air foam generation subsystem belongs; or if no, replacing a fire monitor with a mobile fire-fighting robot to extinguish a fire.
A62C 37/44 - Control of fire-fighting equipment an actuating signal being generated by a sensor separate from an outlet device only the sensor being in the danger zone
A62C 3/16 - Fire prevention, containment or extinguishing specially adapted for particular objects or places in electrical installations, e.g. cableways
A62C 5/02 - Making of fire-extinguishing materials immediately before use of foam
A62C 31/12 - Nozzles specially adapted for fire-extinguishing for delivering foam or atomized foam
44.
HIGH-VOLTAGE CABLE DEFECT DETECTION METHOD, DETECTION SYSTEM, ELECTRONIC DEVICE, AND STORAGE MEDIUM
WUHAN NARI LIMITED LIABILITY COMPANY OF STATE GRID ELECTRIC POWER RESEARCH INSTITUTE (China)
STATE GRID BEIJING ELECTRIC POWER COMPANY (China)
STATE GRID ELECTRIC POWER RESEARCH INSTITUTE (China)
Inventor
Zhang, Jing
Cai, Yuru
Luo, Chuanxian
Cheng, Lin
Zhan, Hao
Cheng, Lifeng
Chen, Nian
Wu, Junjie
Wan, Chengde
Chen, Qingmiao
Yang, Xu
Zhou, Zhengqin
Huang, Qinqing
Zhou, Wen
Xu, Hui
Liu, Mengna
Luo, Ziqiu
Liu, Jinghua
Chen, Ping
Ren, Zhigang
Guo, Wei
Abstract
The present invention relates to the technical field of electrical detection, and provides a high-voltage cable defect detection method, a detection system, an electronic device, and a storage medium. According to the defect detection method, properties of a wavelength change in a spectral signal and precipitation of a characteristic gas caused by a temperature rise of a water-blocking buffer layer in a high-voltage cable due to an ablation defect are utilized. The spectral signal is detected so as to determine the presence of a defect in a first target paragraph, then a gas of the first target paragraph is sampled and analyzed, and a degree of the ablation defect is determined on the basis of compositions and content amplitude of a gas signal. A position where the ablation defect appears is located and detected by using a non-electrical characteristic quantity, so that the influence of electromagnetic interference on a detection instrument and device can be avoided, an operator does not need to perform imaging detection on the high-voltage cable along an entire path, and the field adaptability and accuracy of the detection of an ablation defect of the water-blocking buffer layer in the high-voltage cable can be effectively improved.
A method and system for measuring broadband impedance of a renewable energy power generation device. A voltage disturbance is injected into the renewable energy power generation device by using a disturbance injection device, and three-phase voltage and three-phase current of each of preset measurement points are acquired. Relevant variables before the renewable energy power generation device is decoupled from a measurement device and impedance of a power grid, are calculated according to the three-phase voltage and the three-phase current of each of the preset measurement points. Impedance of the renewable energy power generation device after being decoupled from the measurement device and the impedance of the power grid, is calculated.
State Grid Hunan Electric Power Company Limited (China)
State Grid Hunan Electric Power company Limited Disaster Prevention And Reduction Center (China)
State Grid Corporation of China (China)
Inventor
Lu, Jiazheng
Chen, Baohui
Li, Bo
Wu, Chuanping
Zhou, Tiannian
Liu, Yu
Liang, Ping
Abstract
Disclosed are a passivation fire-extinguishing explosion-suppression system and method for a lithium battery energy storage system. The passivation fire-extinguishing explosion-suppression system includes: a fire-detection sensing device configured to locate a fire location and send a fire signal, a fire-extinguishing and anti-reignition explosion-suppression device, and a controller configured to control the turn-on or turn-off of the fire-extinguishing and anti-reignition explosion-suppression device, where the fire-extinguishing and anti-reignition explosion-suppression device is configured to quickly extinguish an open flame and prevent a battery from reignition and explosion and includes a storage apparatus configured to store a fire-extinguishing and anti-reignition explosion-suppression medium; and the fire-extinguishing and anti-reignition explosion-suppression medium is a combination of 90% to 99.8% of a lithium passivation gas and 0.2% to 10% of a halohydrocarbon gas, and the lithium passivation gas is one or a combination of two selected from nitrogen and carbon dioxide.
A62C 3/16 - Fire prevention, containment or extinguishing specially adapted for particular objects or places in electrical installations, e.g. cableways
A62C 3/00 - Fire prevention, containment or extinguishing specially adapted for particular objects or places
A62C 35/68 - Details, e.g. of pipes or valve systems
47.
Biomimetic tower climbing robot and tower climbing method thereof
STATE GRID HUNAN EXTRA HIGH VOLTAGE TRANSMISSION COMPANY (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Zhang, Jian
Zou, Dehua
Mao, Dun
Jiang, Zhipeng
He, Zhiqiang
Gong, Zhengxiong
Duan, Qiping
Luo, Bangwei
Xiao, Shuwen
Xiang, Yun
Li, Bocheng
He, Jie
Mo, Chonggen
Abstract
A biomimetic tower climbing robot and a tower climbing method thereof are provided. The robot mainly includes a main control body module and clamping and moving mechanism modules; two ends of the main control body module are connected to one clamping and moving mechanism module through an elastic universal joint respectively, two clamping and moving mechanism modules can alternately lock and unlock an anti-fall track of an iron tower, and the main control body module alternately pushes the clamping and moving mechanism module at its upper end upwards and pulls the clamping and moving mechanism module at its lower end upwards to achieve climbing of the robot along the anti-fall track.
B62D 57/024 - Vehicles characterised by having other propulsion or other ground-engaging means than wheels or endless track, alone or in addition to wheels or endless track with ground-engaging propulsion means, e.g. walking members specially adapted for moving on inclined or vertical surfaces
B62D 57/028 - Vehicles characterised by having other propulsion or other ground-engaging means than wheels or endless track, alone or in addition to wheels or endless track with ground-engaging propulsion means, e.g. walking members having wheels and mechanical legs
B62D 57/036 - Vehicles characterised by having other propulsion or other ground-engaging means than wheels or endless track, alone or in addition to wheels or endless track with ground-engaging propulsion means, e.g. walking members screw type, e.g. Archimedian screw
48.
METHOD AND SYSTEM FOR ESTIMATING VOLTAGE SUPPORT STRENGTH OF RENEWABLE ENERGY GRID-CONNECTED POWER SYSTEM, AND STORAGE MEDIUM AND ELECTRONIC DEVICE
A method for estimating a voltage support strength of a renewable energy grid-connected power system. A first short-circuit ratio index of a renewable energy grid-connected power system is determined based on a short-circuit capacity provided for a grid connection point by an alternating-current system, An equivalent grid connection capacity of renewable energy at the grid connection point is determined. A second short-circuit ratio index of the renewable energy grid-connected power system is determined based on a voltage variation at a position where the renewable energy is connected to the grid connection point. A critical short-circuit ratio of the renewable energy grid-connected power system determined based on a parameter of the alternating-current system and an equivalent maximum transmission power. A voltage support strength provided by the renewable energy grid-connected power system at the grid connection point is determined based on the first and second short-circuit ratio indexes and the critical short-circuit ratio.
G01R 31/08 - Locating faults in cables, transmission lines, or networks
G01R 31/52 - Testing for short-circuits, leakage current or ground faults
49.
SPACE-TIME CORRELATION-BASED MULTI-SOURCE HETEROGENEOUS ALARM INFORMATION FUSION METHOD AND SYSTEM, COMPUTER DEVICE, COMPUTER READABLE STORAGE MEDIUM AND COMPUTER PROGRAM PRODUCT
A space-time correlation-based multi-source heterogeneous alarm information fusion method and system, a computer device, a computer readable storage medium and a computer program product, belonging to the technical field of data fusion. The method comprises: reading multi-source heterogeneous network log data, and extracting alarm information in the network log data; preprocessing the extracted alarm information to obtain multi-source target alarm information; and determining credibility of the multi-source target alarm information on the basis of space-time correlation, and fusing the multi-source target alarm information on the basis of the credibility.
04 - Industrial oils and greases; lubricants; fuels
07 - Machines and machine tools
09 - Scientific and electric apparatus and instruments
11 - Environmental control apparatus
36 - Financial, insurance and real estate services
37 - Construction and mining; installation and repair services
39 - Transport, packaging, storage and travel services
41 - Education, entertainment, sporting and cultural services
Goods & Services
Petroleum jelly for industrial purposes; oil for precision
instruments; grease for arms [weapons]; gas for lighting;
oil-gas; coal; belting wax; industrial wax; christmas tree
candles; dust laying compositions. Agricultural machines; saw benches [parts of machines];
papermaking machines; type-setting machines [printing];
machines for the textile industry; dyeing machines; spin
dryers [not heated]; food preparation machines,
electromechanical; apparatus for drawing up beer under
pressure; cigarette machines for industrial purposes;
leather-working machines; pedal drives for sewing machines;
bicycle assembling machines; potters' wheels; engraving
machines; wrapping machines; crushers and grinders,
electric, for household purposes; washing machines
[laundry]; embossing machines; glass-working machines;
electromechanical machines for chemical industry; haulage
apparatus [mining]; converters for steelworks; drilling
rigs, floating or non-floating; mixing machines
(construction); lifts, other than ski-lifts;
turbocompressors; foundry machines; feeding apparatus for
engine boilers; fuel conversion apparatus for internal
combustion engines; hydraulic engines and motors; aprons
[parts of machines]; presses [machines for industrial
purposes]; filters for cleaning cooling air, for engines;
blowing machines or fans for the compression, sucking and
carrying of grain; aerating pumps for aquaria; road sweeping
machines, self-propelled. Computers; computer software, recorded; chronographs [time
recording apparatus]; mechanisms for coin-operated
apparatus; electronic tags for goods; punched card machines
for offices; balances [steelyards]; compasses (measuring
instruments); flashing lights [luminous signals];
electro-dynamic apparatus for the remote control of signals;
juke boxes for computers; stands for photographic apparatus;
automatic indicators of low pressure in vehicle tires;
furniture especially made for laboratories; air analysis
apparatus; apparatus and instruments for astronomy;
telescopes; materials for electricity mains [wires, cables];
distribution consoles [electricity]; electrical conductors;
transformers [electricity]; lighting ballasts; mechanisms
for counter-operated apparatus; electrolysis apparatus for
laboratory use; apparatus and installations for the
production of X-rays, not for medical purposes; life buoys;
alarms; spectacle frames; battery chargers; slides
[photography]; decorative magnets. Lighting apparatus and installations; kitchen ranges
[ovens]; cooling installations and machines; drying
apparatus and installations; fireplaces (including
industrial furnaces and boilers, excluding locomotive and
steam engine boilers); taps; hot air bath fittings
(excluding toilet utensils); disinfectant dispensers for
toilets; radiators, electric; gas lighters; installations
for processing nuclear fuel and nuclear moderating material. Providing insurance information; instalment loans;
securities and public debt brokerage; art appraisal; real
estate appraisal; brokerage; surety services; charitable
fund raising; fiduciary; pawnbrokerage. Building construction supervision; factory construction;
upholstery repair; heating equipment installation and
repair; rebuilding machines that have been worn or partially
destroyed; freezing equipment installation and repair; motor
vehicle maintenance and repair; airplane maintenance and
repair; film projector repair and maintenance; safe
maintenance and repair; retreading of tires; furniture
making [repair]; leather care, cleaning and repair; washing
of linen; dry cleaning; disinfecting; fire alarm
installation and repair; telephone installation and repair;
artificial snow-making services. Transport; salvaging; car transport; air transport; vehicle
rental; physical storage of electronically stored data or
documents; rental of diving suits; water supplying;
operating canal locks; parcel delivery; travel reservation;
launching of satellites for others. Educational services; religious education; organization of
exhibitions for cultural or educational purposes; lending
library services; online publication of electronic books and
journals; rental of movie projectors and accessories;
providing sports facilities; animal training; operating of
lotteries.
51.
GROUNDING GRID CONDUCTOR POSITIONING METHOD, APPARATUS, AND SYSTEM
ELECTRIC POWER INSTITUTE OF STATE GRID JIBEI ELECTRIC POWER COMPANY (China)
HANGZHOU ZHONGWEI ZHIXIN POWER TECHNOLOGY CO., LTD (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Wang, Xijun
Wu, Huacheng
Zhou, Weiqing
Zhang, Xiuli
Li, Chenlei
Ding, Liping
Di, Guanghui
Li, Zhicheng
Li, Chao
Wang, Rui
Li, Shiyuan
Hu, Yuanxiang
Li, Yongli
Wei, Ruiyao
Abstract
A grounding grid conductor positioning method, comprising: acquiring induced magnetic field signals collected by a sensor array vertically arranged above a grounding grid conductor, wherein the induced magnetic field signals are generated by injecting an excitation current into the grounding grid conductor by means of an excitation source; according to the induced magnetic field signals and the excitation current, determining the magnetic flux density component parallel to the ground of the grounding grid conductor; taking the derivative of the magnetic flux density component parallel to the ground of the grounding grid conductor, determining the main peak coordinates corresponding to the magnetic flux density component, and positioning the grounding grid conductor according to the main peak coordinates. Further provided are a grounding grid conductor positioning apparatus and system, an electronic device, a computer-readable storage medium, and a computer program product.
G01V 3/11 - Electric or magnetic prospecting or detectingMeasuring magnetic field characteristics of the earth, e.g. declination or deviation operating with magnetic or electric fields produced or modified by objects or geological structures or by detecting devices using induction coils for detecting conductive objects, e.g. firearms, cables or pipes
G01R 33/02 - Measuring direction or magnitude of magnetic fields or magnetic flux
52.
TRANSFORMER AREA ELECTRICITY THEFT PREVENTION ANALYSIS METHOD BASED ON ELECTRICITY CONSUMPTION INFORMATION COLLECTION
FUJIAN NETPOWER TECHNOLOGY DEVELOPMENT CO., LTD. (China)
STATE GRID CORPORATION OF CHINA (China)
STATE GRID INFORMATION & TELECOMMUNICATION GROUP CO., LTD. (China)
Inventor
Liu, Wei
Luo, Shunhui
Cheng, Shuying
Zhan, Chao
Tan, Afeng
Lin, Huabao
Ye, Han
Abstract
The present invention relates to a transformer area electricity theft prevention analysis method based on electricity consumption information collection. An association analysis algorithm is designed, and relationships between electricity theft phenomena and multi-dimensional electrical feature parameters are established, thereby solving classification and prediction of various electricity theft events; and electricity theft event models of the feature parameters are established on the basis of collected electricity consumption information data, so as to perform electricity theft prevention analysis, thereby reducing false negatives of electricity theft events.
G06Q 10/04 - Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
53.
CONTROL METHOD AND APPARATUS FOR DIRECT-CURRENT ENERGY CONSUMING APPARATUS, ELECTRONIC DEVICE, STORAGE MEDIUM, AND PROGRAM PRODUCT
STATE GRID SMART GRID RESEARCH INSTITUTE CO., LTD. (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Xu, Bin
Gao, Chong
Zhang, Sheng
Zhang, Jing
Wang, Chenghao
Zhou, Wei
Abstract
The present application provides a control method and apparatus for a direct-current energy consuming device, an electronic device, a storage medium, and a program product. The method comprises: obtaining a direct-current bus voltage value within a control period; calculating a direct-current bus voltage deviation according to the difference between the ratio of the direct-current bus voltage value to a direct-current bus voltage reference value and 1; and controlling the direct-current energy consuming apparatus to enter, exit, or maintain an original operating state according to a magnitude relationship between the direct-current bus voltage deviation and a preset fluctuation of the direct-current bus voltage.
H02J 3/36 - Arrangements for transfer of electric power between ac networks via a high-tension dc link
H02J 3/38 - Arrangements for parallelly feeding a single network by two or more generators, converters or transformers
H02J 3/14 - Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
54.
BLOCKCHAIN-BASED GREEN POWER CERTIFICATION METHOD, APPARATUS, AND SYSTEM
STATE GRID BLOCKCHAIN TECHNOLOGY (BEIJING) CO., LTD. (China)
BEIJING POWER EXCHANGE CENTER CO., LTD. (China)
STATE GRID DIGITAL TECHNOLOGY HOLDING CO., LTD. (China)
STATE GRID CORPORATION OF CHINA (China)
JIANGXI POWER EXCHANGE CENTER CO., LTD. (China)
LIAONING POWER EXCHANGE CENTER CO., LTD. (China)
EAST INNER MONGOLIA POWER EXCHANGE CENTER COMPANY LTD. (China)
Inventor
Xie, Kai
Wang, Dong
Zhang, Xian
Wang, Hejian
Li, Da
Xie, Wen
Ji, Shijie
Liu, Yonghui
Zhang, Nan
Xuan, Jiaxing
Sun, Tian
Bai, Desheng
Zhang, Shengnan
Li, Xin
Chen, Gang
Jia, Haiqing
Zhang, Zhe
Liang, Hexiao
Li, Qingchun
Fan, Kun
Lu, Shengzhi
Yang, Chao
Zhao, Liang
Feng, Jingli
Jia, Fan
Xing, Tong
Zhao, Lihua
Li, Guomin
Su, Zhan
Abstract
The present disclosure provides a blockchain-based green power certification method, apparatus, and system, to pre-process obtained basic data to obtain proof-of-existence data, certify the proof-of-existence data from a production side and a consumption side by using a certification chain and a token chain respectively, and obtain a green power attribute certificate and a green power consumption label if the certification is passed; generate a unique digital identifier for the green power attribute certificate and the green power consumption label separately based on a non-fungible token (NFT), which realizes non-interchangeability, indivisibility, and other characteristics of the certificate and the identifier; and supervise and verify a certification process by using a chain of custody, and generate a corresponding unique blockchain identifier for the certification chain, the token chain, and the chain of custody separately through multi-chain interaction, so as to realize data interaction between blockchains.
H04L 9/32 - Arrangements for secret or secure communicationsNetwork security protocols including means for verifying the identity or authority of a user of the system
55.
RISK ASSESSMENT METHOD AND SYSTEM FOR WINDAGE YAW FLASHOVER, DEVICE, AND READABLE STORAGE MEDIUM
State Grid Electric Power Research Institute In Shandong Province Power Company (China)
State Grid Corporation Of China (China)
Inventor
Zhou, Chao
Liu, Hui
Qin, Jiafeng
Sun, Xiaobin
Jia, Ran
Li, Dandan
Geng, Bo
Zhang, Yang
Liu, Rong
Shen, Hao
Liu, Chuanbin
Yu, Chuanwei
Yang, Jie
Cai, Yingming
Chen, Xingyan
Gao, Chengcheng
Wei, Likun
Abstract
Provided is a risk assessment method for power transmission line windage yaw flashover. The method includes determining the influence factors of power transmission line windage yaw flashover and setting risk assessment indexes according to the influence factors (S101); generating the standard cloud of the risk assessment indexes according to the incident occurrence probabilities and the consequence levels of the risk assessment indexes (S103); scoring the influence factors according to the risk assessment indexes and generating the risk cloud of the risk assessment indexes according to scoring results (S105); and performing a two-dimensional similarity calculation on the risk cloud and the standard cloud to obtain two-dimensional similarity between the risk cloud and the standard cloud and determining the risk level of the power transmission line windage yaw flashover according to the two-dimensional similarity (S107).
State Grid Chongqing Electric Power Co. Electric Power Research Institute (China)
State Grid Corporation of China (China)
Inventor
Fang, Hui
Zhou, Jingsen
Chen, Yongtao
Mu, Fan
Zhu, Shengyi
Wang, Cheng
Li, Lei
Xiang, Hongji
Yu, Yanan
Xiao, Qiang
Hu, Lining
Wen, Zhongyi
Abstract
A modulation method for a direct current (DC) coupling converter with less DC voltage sensors includes: obtaining a voltage modulated wave vr* and a current reference value ig* of the DC coupling converter; performing judgment on the voltage modulated wave vr* and the current reference value ig*, and determining a switch state of the DC coupling converter based on a result of the judgment; and when a DC voltage sensor of an electrolytic capacitor of an intermediate power module is removed, modulating a DC voltage sensor based on the voltage modulated wave vr* and a difference between DC voltages on electrolytic capacitors of the other two power modules. When the intermediate DC-side voltage sensor is removed, DC voltages of various modules of a converter system of a DC coupling power unit can still be balanced, and quality of a grid-connected current is not affected by a fault.
H02M 3/158 - Conversion of DC power input into DC power output without intermediate conversion into AC by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal using semiconductor devices only with automatic control of output voltage or current, e.g. switching regulators including plural semiconductor devices as final control devices for a single load
H02M 1/32 - Means for protecting converters other than by automatic disconnection
57.
SPECIFIC POWER TRANSFORMER COLLECTION TERMINAL CAPABLE OF CONFIGURING LOCAL COMMUNICATION MODULE
Provided in the present disclosure is a specific power transformer collection terminal capable of configuring a local communication module. The specific power transformer collection terminal comprises: a specific power transformer collection terminal body, a control portion, which is arranged inside the specific power transformer collection terminal body, and a carrier coupling interface, which is arranged at the position of a first configurable portion that is reserved by the specific power transformer collection terminal body, wherein the control portion is used for local load control; and the carrier coupling interface supports the access of an HPLC portion or an HPLC + HRF dual-mode portion, and is used for implementing local networking communication of the specific power transformer collection terminal.
Disclosed in the present disclosure is an intelligent outdoor combined electrical device for grid-connected and off-grid control protection of a medium-voltage microgrid, the device comprising a current transformer, a disconnector mechanism, an outdoor circuit breaker, an electric isolation drive mechanism and an outdoor jet fuse. The current transformer is installed on a leading-out end of the outdoor circuit breaker, the disconnector mechanism is connected to the current transformer, the disconnector mechanism is connected to the leading-out end of the outdoor circuit breaker by means of the current transformer, a top end on the side of the disconnector mechanism away from the current transformer is connected to a top end of the outdoor jet fuse, a bottom end on the side of the disconnector mechanism away from the current transformer is connected to a bottom end of the outdoor jet fuse, and the electric isolation drive mechanism is arranged on the bottom end of the disconnector mechanism.
H01H 89/00 - Combinations of two or more different basic types of electric switches, relays, selectors and emergency protective devices, not covered by any single one of the other main groups of this subclass
59.
AIR MIXER FOR COMPRESSED AIR FOAM FIRE-EXTINGUISHING SYSTEM AND FIRE-EXTINGUISHING SYSTEM
STATE GRID ANHUI ELECTRIC POWER RESEARCH INSTITUTE (China)
State Grid Corporation of China (China)
Inventor
Zhang, Jiaqing
Huang, Yong
Zhou, Yifu
Li, Jinzhong
Zhang, Xiaodong
Cheng, Dengfeng
Luo, Sha
Guo, Yi
Shang, Fengju
Huang, Yubiao
Liu, Rui
Abstract
The present disclosure provides an air mixer for a compressed air foam (CAF) fire-extinguishing system. A foam concentrate and compressed air are respectively transported by a liquid inlet pipe and an air inlet pipe. When the compressed air and the foam concentrate enter a straight pipe through a first tapered pipe, they reach an outlet end of the first tapered pipe through a path narrowing due to different cross-section diameters at two ends of the first tapered pipe, and there is a compression process. Under an action of a high-pressure airflow, the foam concentrate is fully mixed. The mixed foam concentrate reaches a porous plate of the straight pipe and can be mixed secondarily. When the foam concentrate is discharged by a second tapered pipe, a flow path widens and there is a release process.
A62C 31/12 - Nozzles specially adapted for fire-extinguishing for delivering foam or atomized foam
A62C 5/02 - Making of fire-extinguishing materials immediately before use of foam
A62C 31/28 - Accessories for delivery devices, e.g. supports
60.
METHOD AND SYSTEM FOR IDENTIFYING DOMINANT OVERVOLTAGE OF HIGH-PROPORTION NEW ENERGY POWER SYSTEM, ELECTRONIC DEVICE, STORAGE MEDIUM AND COMPUTER PROGRAM PRODUCT
A method for identifying a dominant overvoltage of a high-proportion new energy power system includes the following operations. A voltage amplitude of a new energy terminal and a voltage amplitude of an alternating-current (AC) bus at any moment after faults of the new energy terminal and the AC bus are cleared, are determined. An overvoltage limit ratio is determined according to a ratio of the voltage amplitude of the new energy terminal to the voltage amplitude of the AC bus. A critical overvoltage limit ratio is determined. A maximum new energy terminal voltage value and a maximum AC bus voltage value bearable for the new energy terminal and the AC bus are determined respectively. Identification of a dominant voltage safety constraint is performed and an identification result is determined.
H02H 7/22 - Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions for distribution gear, e.g. bus-bar systemsEmergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions for switching devices
61.
HIGH-SPEED QUANTUM REGULATION MAGNETIC MEASUREMENT METHOD AND SYSTEM
CHINA ELECTRIC POWER RESEARCH INSTITUTE WUHAN BRANCH (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Zhou, Feng
Li, Xiaofei
Nie, Qi
Lei, Min
Yin, Xiaodong
Hu, Haoliang
Huang, Junchang
Liu, Jing
Du, Xingang
Guo, Xianshan
Ge, Dehui
Zhang, Min
Peng, Chuning
Chen, Zhengguang
Abstract
Disclosed in the embodiments of the present application are a high-speed quantum regulation magnetic measurement method and system. The method comprises: a laser source emitting a laser to a diamond NV center, such that the diamond NV center transmits a fluorescence intensity signal; a regional frequency positioning component performing measurement to obtain the current magnetic field intensity to be measured, obtaining a preliminary positioning frequency on the basis of said current magnetic field intensity, and sending the preliminary positioning frequency to a microwave modulator; the microwave modulator expanding a frequency range by taking the preliminary positioning frequency as the center, and performing cyclic frequency sweeping by taking the expanded frequency range as a cycle; and a data collection and processing system collecting fluorescence intensity signals under different scanning frequencies, parsing the fluorescence intensity signals under different scanning frequencies to obtain frequency values at different wave troughs, and obtaining different magnetic field intensities according to the frequency values at different wave troughs and a central frequency value.
G01R 33/24 - Arrangements or instruments for measuring magnetic variables involving magnetic resonance for measuring direction or magnitude of magnetic fields or magnetic flux
G01R 33/032 - Measuring direction or magnitude of magnetic fields or magnetic flux using magneto-optic devices, e.g. Faraday
62.
SOUND BARRIER SYSTEM FOR REDUCING ELECTRIC FIELD DISTORTION
STATE GRID HENAN ELECTRIC POWER RESEARCH INSTITUTE (China)
STATE GRID SMART GRID RESEARCH INSTITUTE CO. LTD. (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Wang, Donghui
Zhang, Songyang
Zhang, Jiaqi
Yao, Degui
Wang, Leilei
Zhang, Zhuangzhuang
Wang, Guangzhou
Nie, Jingkai
He, Qiang
Tian, Yi
Li, Rui
Lu, Lin
Guo, Xing
Li, Yuan
Tian, Xu
Liu, Weipo
Feng, Haodong
Abstract
A sound barrier system for reducing electric field distortion includes a wall unit and a sound barrier unit. The sound barrier unit includes a sound barrier plate that, from top to bottom, includes an arc-shaped part, an inclined part, and a vertical part that are integrally formed, wherein a center of a circle of the arc-shaped part points towards an interior of a power facility, the inclined part is tilted away from the power facility from top to bottom and is tangent to the arc-shaped part, and a lower end of the vertical part is arranged on a top of the wall unit. The sound barrier system further includes an energy supply pipeline, a security device, and an online monitoring device. The sound barrier system can be easily manufactured, and not only can improve an acoustic environment around a substation, but also can reduce an amplitude of an electric field.
ELECTRIC POWER SCIENCE & RESEARCH INSTITUTE OF STATE GRID TIANJIN ELECTRIC POWER COMPANY (China)
STATE GRID TIANJIN ELECTRIC POWER COMPANY (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
He, Jin
He, Chun
Li, Songyuan
Tang, Qinghua
Zhang, Chi
Chen, Rong
Zhao, Qi
Li, Jin
Song, Xiaobo
Han, Yue
Cao, Meng
Li, Lin
Li, Suya
Dong, Yanwei
Meng, Zhengzheng
Abstract
An imaging method and system for a residual stress in a basin insulator, and a test block preparation method. The imaging method comprises: preparing a standard industrial test sample of a basin insulator by cutting, and testing an acoustoelastic coefficient; then acquiring residual stress data of the basin insulator, acquiring sound velocity distribution of spatial point positions of the basin insulator, and finally obtaining a stress distribution cloud map of the basin insulator by calculating attribute values and coordinate data of positions under test; and performing reliability verification on the basis of the residual stress data.
STATE GRID HENAN ELECTRIC POWER RESEARCH INSTITUTE (China)
GLOBAL ENERGY INTERCONNECTION RESEARCH INSTITUTE CO., LTD. (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Wang, Donghui
Zhang, Songyang
Zhang, Zhuangzhuang
Yang, Yi
Wan, Diming
Wang, Leilei
Yao, Degui
Lv, Zhongbin
Wang, Guangzhou
Nie, Jingkai
He, Qiang
Fan, Chao
Abstract
A method for constructing a transverse audible noise model of a transmission corridor, a microphone support device, and an audible noise measurement apparatus. The method comprises: synchronously measuring noise separately at transmission corridor background noise measurement points (23), N transmission corridor noise measurement points (21), and M transmission corridor noise inspection measurement points (22), so that an objective function formula (1) fits to a point array constructed by a noise correction value equation DBAnnn,0); if a mean error between a noise correction value equation DBBmmm,0) meets a precision requirement, obtaining a transverse audible noise model (1) of the transmission corridor, wherein z is audible noise at a point (x, 0).
NATIONAL CENTER FOR HIGH VOLTAGE MEASUREMENT (China)
Inventor
Zhou, Feng
Diao, Yinglong
Long, Zhaozhi
Li, Wenting
Yin, Xiaodong
Liu, Yi
Lei, Min
Fan, Jiawei
Hu, Kangmin
Liu, Shaobo
Yue, Changxi
Jiang, Chunyang
Yu, Yefeng
Wang, Zhehao
Hu, Haoliang
Wang, Haiyan
Abstract
A shielding resistive divider and a voltage division measurement apparatus. The shielding resistive divider comprises a high-voltage arm (1) and a low-voltage arm (2), the high-voltage arm (1) comprising a plurality of high-voltage modules (3) connected in series, the low-voltage arm (2) being a low-voltage module (4) which is connected in series to the bottommost high-voltage module (3) of the high-voltage arm (1). Each high-voltage module (3) comprises a measurement branch high-voltage resistor (5) and a shielding branch high-voltage resistor (6), which are electrically isolated but are connected in parallel. The low-voltage module (4) comprises a measurement branch low-voltage resistor (8) and a shielding branch low-voltage resistor (9), which are electrically isolated but are connected in parallel. In the shielding resistive divider and the voltage division measurement apparatus, the high-voltage arm (1) is modularized, namely, the high-voltage arm (1) is formed by a different number of high-voltage modules (3), such that the present application can measure voltages at different levels, and has simple mounting mode, is easy to disassemble and facilitates maintenance and repair. In addition, two electrically-isolated resistive branches are coaxially arranged in the high-voltage modules (3), thereby greatly reducing the earth stray capacitance of the high-voltage resistor (5) of the measurement branch, and shortening the response time of the voltage divider.
STATE GRID HEBEI ELECTRIC POWER COMPANY ELECTRIC POWER RESEARCH INSTITUTE (China)
STATE GRID HEBEI ENERGY TECHNOLOGY SERVICE CO., LTD (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Liu, Qingquan
Li, Tiecheng
Zang, Qian
Wang, Xianzhi
Zhang, Weiming
Guo, Shaofei
Li, Ze
He, Lei
Liu, Shiyan
Abstract
The present invention provides an FPGA-based communication network quality test method and apparatus. The method comprises: a primary test apparatus obtaining externally inputted test parameters, generating a first test data packet according to the test parameters, and wirelessly sending the first test data packet to a secondary test apparatus; the secondary test apparatus using the first test data packet to compute network quality data at a secondary device side, and according to the first test data packet and the network quality data at the secondary device side, generating a second test data packet, and returning the second test data packet to the primary test apparatus; and the primary test apparatus using the second test data packet to compute network quality data at a primary device side, and based on the network quality data at the primary device side and at the secondary device side, obtaining the quality of the communication network. The present invention achieves rapid, accurate, and real-time network quality testing, displays network performance parameters, and satisfies the requirements of network quality testing for power systems.
2) of the samples in an aging space; and step 4: classifying the samples in advance and solving an aging state centroid of each classified population, calculating a minimum aging distance based on the position coordinates in step 3, and evaluating the aging state of the silicone rubber composite insulator.
G01N 17/00 - Investigating resistance of materials to the weather, to corrosion or to light
G01N 3/20 - Investigating strength properties of solid materials by application of mechanical stress by applying steady bending forces
G01N 3/40 - Investigating hardness or rebound hardness
G01N 21/31 - Investigating relative effect of material at wavelengths characteristic of specific elements or molecules, e.g. atomic absorption spectrometry
State Grid Hebei Electric Power Co., Ltd. Research Institute (China)
State Grid Hebei Electric Power Co., Ltd. (China)
State Grid Corporation of China (China)
Inventor
Fan, Hui
Liang, Jifeng
Luo, Peng
Li, Tiecheng
Zeng, Siming
Zang, Qian
Wang, Leibao
Abstract
The method includes: determining required virtual inertia based on a frequency change rate monitored at a grid connection point of a photovoltaic grid-connected system; obtaining values of indexes that affect virtual inertia provided by each virtual synchronous generator (VSG) control unit in a photovoltaic cluster of the photovoltaic grid-connected system; determining, by using a predetermined function equation, a function value corresponding to each index; and determining an allocation proportion of the required virtual inertia in each VSG control unit based on the function value corresponding to each index. A problem of difficult conversion between a plurality of kinds of performance during operation of a power system is resolved, the frequency change rate is suppressed to a certain extent, and a stable state is recovered quickly.
STATE GRID BLOCKCHAIN TECHNOLOGY (BEIJING) CO., LTD. (China)
State Grid Digital Technology Holding CO., LTD. (China)
State Grid Corporation of China (China)
Inventor
Wang, Dong
Jiang, Wei
Li, Da
Xuan, Jiaxing
Li, Guomin
Wang, Hejian
Shi, Xin
Li, Jiangtao
Su, Zhan
Zhou, Lei
Zhao, Lihua
Jia, Fan
Abstract
A blockchain-based transaction system for a green certificate includes an audit node, a proxy node, and an off-chain node. The proxy node is used by a power producer and a purchaser; the audit node verifies qualification information of the power producer, and send a green certificate to the power producer; the off-chain node predicts a transaction price of a next transaction; when receiving sale information of the power producer and purchase information of the purchaser, the proxy node sends the sale information, a digital signature of the power producer, the purchase information, and a digital signature of the purchaser to the off-chain node; the off-chain node matches the sale information and the purchase information, and sends successfully matched transaction information to the proxy node; the proxy node sends the successfully matched transaction information to a transaction smart contract; and the transaction smart contract performs transaction processing.
G06F 16/27 - Replication, distribution or synchronisation of data between databases or within a distributed database systemDistributed database system architectures therefor
G06F 21/64 - Protecting data integrity, e.g. using checksums, certificates or signatures
G06Q 20/40 - Authorisation, e.g. identification of payer or payee, verification of customer or shop credentialsReview and approval of payers, e.g. check of credit lines or negative lists
G06Q 30/0201 - Market modellingMarket analysisCollecting market data
STATE GRID ELECTRIC POWER RESEARCH INSTITUTE IN SHANDONG PROVINCE POWER COMPANY (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Li, Lisheng
Liu, Yang
Yu, Haidong
Zhang, Shidong
Huang, Min
You, Xinhong
Liu, Wenbin
Zhang, Pengping
Sun, Yong
Li, Jinghua
Wang, Hao
Li, Yong
Li, Shuai
Wen, Xiangyu
Huang, Rui
Liu, Minglin
Li, Jianxiu
Fang, Mu
Qin, Jiafeng
Zhang, Linli
Liu, Hejin
Wang, Feng
Su, Guoqiang
Abstract
A power distribution network energy storage voltage regulation partition optimization method and apparatus, a medium and a device. The power distribution network energy storage voltage regulation partition optimization method comprises the following steps: performing cluster partitioning on a power distribution network according to power distribution network operation parameters (S110); and adjusting the voltage of each cluster partition by means of an energy storage device, constructing a partition optimization model for the energy storage device to adjust the voltage of the cluster partition, and obtaining a node range in which each energy storage device is responsible for voltage regulation (S120).
H02J 3/32 - Arrangements for balancing the load in a network by storage of energy using batteries with converting means
H02J 3/38 - Arrangements for parallelly feeding a single network by two or more generators, converters or transformers
H02J 3/06 - Controlling transfer of power between connected networksControlling sharing of load between connected networks
H02J 3/16 - Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by adjustment of reactive power
71.
HARDWARE PIPELINE GTP DATA SHUNTING METHOD AND APPARATUS FOR LOW-DELAY POWER SERVICE
STATE GRID SMART GRID RESEARCH INSTITUTE CO., LTD. (China)
INFORMATION AND COMMUNICATION BRANCH, STATE GRID ZHEJIANG ELECTRIC POWER CO., LTD. (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Yu, Yue
Yao, Jiming
Wu, Peng
Wang, Wei
Zhu, Liang
Qiu, Lanxin
Xu, Yangzhou
Abstract
The present application discloses a hardware pipeline GTP data shunting method and apparatus for a low-delay power service. The method comprises: receiving a first power service data packet from a base station; parsing the first power service data packet, to obtain a target tunnel endpoint identifier of the first power service data packet; on the basis of the target tunnel endpoint identifier, querying whether the first power service data packet satisfies a processing condition of a mobile edge computing device, to obtain a query result; executing a shunting operation corresponding to the query result on the first power service data packet, so as to send the first power service data packet to a target service terminal. The present application uses an FPGA module to analyze power service data packets sent by a base station to a mobile edge computing platform, to screen out a power service data packet that can be processed by a mobile edge computing device, so that shunting of the power service data packets is implemented, transmission delay is reduced, and service demands are satisfied; in addition, power service customization is implemented, improving the efficiency of power grid services.
NORTH CHINA ELECTRIC POWER RESEARCH INSTITUTE CO., LTD (China)
STATE GRID JIBEI ELECTRIC POWER CO. LTD CHENGDE POWER SUPPLY COMPANY (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Liang, Weichen
Liu, Bo
Zhang, Wanming
Ding, Jiachao
Fu, Lina
Wang, Yajuan
Zhao, Zhiyu
Li, Xuan
Abstract
A distribution network current protection sensitivity analysis method and apparatus. The method comprises: acquiring, according to distribution network parameters, a first short-circuit current and a system short-circuit capacity when no distributed power supply is connected to a power system (S101); determining a fault short circuit ratio according to a relative relationship between a grid connection position of a distributed power supply in the power system, and a current measurement point position and a fault position (S102); when the distributed power supply uses an optimal positive sequence voltage support policy, calculating the phase of an output current of the distributed power supply according to a phase voltage of the power system, positive and negative sequence short-circuit impedance, line impedance, the magnitude of the output current of the distributed power supply, line impedance between buses, and a line impedance angle (S103); according to the first short-circuit current, the fault short circuit ratio, and the phase of the output current of the distributed power supply, determining a second short-circuit current when the distributed power supply is connected to the power system (S104); and performing evaluation of current protection sensitivity according to a current protection setting value and the second short-circuit current (S105). By means of the distribution network current protection sensitivity analysis method and apparatus, the magnitude of a short-circuit current can be calculated without an iterative calculation using a computer, thereby achieving the evaluation of current protection sensitivity.
H02H 3/00 - Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition, with or without subsequent reconnection
H02H 3/08 - Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition, with or without subsequent reconnection responsive to excess current
73.
METHOD AND APPARATUS FOR CONSTRUCTING DIGITAL TWIN HYBRID MODEL OF MAIN DEVICE OF POWER SYSTEM
Disclosed in the present invention are a method and apparatus for constructing a digital twin hybrid model of a main device of a power system. The method comprises: performing information coding on an operation state and fault association knowledge graph of a main device of a power system to generate a density vector; embedding the density vector into a first layer of a ConvGRU neural network for performing initial training of a data-driven model to obtain a data-driven initial model; optimizing a convolutional base and a classifier of the data-driven initial model by means of historical collected data to obtain an optimized data-driven model; and enabling the data-driven model and a mechanism model of the main device of the power system to cooperatively operate in parallel, and performing gradient descent of a loss function of the neural network by means of a solver, so as to construct a digital twin hybrid model of the main device of the power system.
G06F 30/27 - Design optimisation, verification or simulation using machine learning, e.g. artificial intelligence, neural networks, support vector machines [SVM] or training a model
74.
POWER DISTRIBUTION NETWORK SIMULATION METHOD, SYSTEM AND DEVICE, AND COMPUTER-READABLE STORAGE MEDIUM
Disclosed in embodiments of the present invention are a power distribution network simulation method, system and device, and a computer-readable storage medium. The method comprises: according to a model difference and an interaction effect between a cyber system and a physical system in a power distribution network and the scale and accuracy of multi-scenario simulation verification, performing multi-level and multi-scale platform architecture modeling to obtain a simulation platform architecture; on the simulation platform architecture, according to coupling characteristics between the physical system and the cyber system in the power distribution network, performing fusion modeling on cyber-physical simulation systems under time-varying information and non-deterministic conditions to obtain a power distribution network cyber-physical system; on the basis of the simulation platform architecture, in a concurrent fault scenario of the physical system, a communication network and the cyber system, performing real-time simulation on the power distribution network cyber-physical system to determine a fault simulation result of the power distribution network; and on the basis of the simulation platform architecture, performing reliability simulation evaluation on the power distribution network cyber-physical system by using a reliability evaluation index to determine a reliability simulation result of the power distribution network.
H02J 13/00 - Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the networkCircuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
H02J 3/00 - Circuit arrangements for ac mains or ac distribution networks
75.
POWER GRID DISTRIBUTION NETWORK FRAME TOPOLOGY CONSTRUCTION METHOD BASED ON POWER DISTRIBUTION AND UTILIZATION HOLOGRAPHIC DATA MODEL
STATE GRID SMART GRID RESEARCH INSTITUTE CO., LTD. (China)
STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER COMPANY (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Yang, Pei
Xu, Min
Wang, Gang
Qiao, Junfeng
Huang, Xingde
Shen, Xiaofeng
Zhou, Aihua
Abstract
The embodiments of the present application relates to a power grid distribution network frame topology construction method based on a power distribution and utilization holographic data model, comprising: acquiring graphic data of a plurality of power grid devices in a power grid PMS system, converting the graphic data into topological data, and writing the topological data into a graph database; on the basis of the graph database, identifying among the plurality of power grid devices a transformer substation node and a plurality of tower nodes that have a connection relationship with the transformer substation node; determining a sag-related parameter on the basis of the distance between each two adjacent towers among the plurality of tower nodes, and constructing a sag line segment function on the basis of the sag-related parameter; and, on the basis of the sag line segment function, drawing an overhead line curve between each two adjacent towers, so as to obtain a power grid distribution network frame topological graph. Therefore, the method constructs a unified topological model by using the graph database and a three-dimensional technology, and calculates and visualizes the three-dimensional topological line sags, thereby improving the operation and maintenance management level.
G06F 30/18 - Network design, e.g. design based on topological or interconnect aspects of utility systems, piping, heating ventilation air conditioning [HVAC] or cabling
H02J 3/00 - Circuit arrangements for ac mains or ac distribution networks
The present application belongs to the technical field of identification and locating of defects of transformer devices. Disclosed are a method and system for identifying and locating a three-dimensional defect of a transformer substation. The method of the present application comprises: collecting multi-source inspection data and point cloud data of a transformer substation, and recording a spatial position and posture of an inspection and collection device; on the basis of the point cloud data, performing fine locating on the inspection and acquisition device in a pre-built real-view three-dimensional model of the transformer substation; generating inspection data with extensible timing; generating component-level data; determining change data of transformer substation parameters in the component-level data, and performing defect diagnosis on a transformer substation component device on the basis of the change data, so as to identify the defect type of the transformer substation device component and locate a defect space of the transformer substation device component. By means of the present application, rapid diagnosis and locating of a typical external thermal defect and a typical insulation defect of a transformer substation device can be realized.
STATE GRID SMART GRID RESEARCH INSTITUTE CO., LTD. (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Zhao, Guoliang
Deng, Zhanfeng
Xu, Yunfei
Lu, Zhengang
Li, Weiguo
Qiao, Guangyao
Zhou, Ding
Abstract
Disclosed in embodiments of the present disclosure is an alternating current power transmission system, comprising: a converter. The converter comprises a plurality of converter valve groups, one end of each converter valve group is connected to a first alternating current system, each bridge arm of the other end of each converter valve group is connected to a winding at one side of a first transformer in series, and a winding at the other side of the first transformer is connected to a second alternating current system. According to the present disclosure, a winding at one side of a transformer is connected to each bridge arm of a converter, so that the winding can be used for simultaneously inhibiting an interphase circulating current and improving the utilization rate of an IGBT switching device in the converter, the reactance of the bridge arms of the converter is omitted while the normal work of a converter valve is ensured, and thus the impedance of the system can be reduced, and the transmission capability of the system is improved.
H02M 5/04 - Conversion of AC power input into AC power output, e.g. for change of voltage, for change of frequency, for change of number of phases without intermediate conversion into DC by static converters
H02M 5/10 - Conversion of AC power input into AC power output, e.g. for change of voltage, for change of frequency, for change of number of phases without intermediate conversion into DC by static converters using transformers
H02M 5/293 - Conversion of AC power input into AC power output, e.g. for change of voltage, for change of frequency, for change of number of phases without intermediate conversion into DC by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal using semiconductor devices only
78.
VOLTAGE REFERENCE GENERATION CIRCUIT, AND CHIP AND ELECTRONIC DEVICE
BEIJING SMARTCHIP MICROELECTRONICS TECHNOLOGY COMPANY LIMITED (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Zhao, Dongyan
Li, Mingjie
Wang, Yubo
Li, Zhenguo
Yuan, Yidong
Hu, Yi
Zhao, Tianting
Hou, Jiali
Wang, Yabin
Su, Meng
Liu, Yu
Chang, Naichao
Abstract
The present disclosure relates to the technical field of integrated circuits, and particularly relates to a voltage reference generation circuit, and a chip and an electronic device. The voltage reference generation circuit comprises: a reference voltage generation circuit, which is used for generating a first reference voltage; and a voltage stabilization circuit, which comprises a voltage conversion circuit, a source-current voltage stabilization branch and a sink-current voltage stabilization branch, wherein the voltage conversion circuit is used for converting the first reference voltage into a voltage reference, converting the voltage reference into a first control voltage when the voltage reference generation circuit receives an external source current, and converting the voltage reference into a second control voltage when the voltage reference generation circuit receives an external sink current, the source-current voltage stabilization branch receives the first control voltage, and the sink-current voltage stabilization branch receives the second control voltage, so as to perform voltage stabilization on the voltage reference, thereby improving the reliability of the circuit.
G05F 1/56 - Regulating voltage or current wherein the variable actually regulated by the final control device is DC using semiconductor devices in series with the load as final control devices
79.
RISK EVALUATION METHOD AND SYSTEM FOR WINDAGE YAW FLASHOVER, DEVICE, AND READABLE STORAGE MEDIUM
STATE GRID ELECTRIC POWER RESEARCH INSTITUTE IN SHANDONG PROVINCE POWER COMPANY (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Zhou, Chao
Liu, Hui
Qin, Jiafeng
Sun, Xiaobin
Jia, Ran
Li, Dandan
Geng, Bo
Zhang, Yang
Liu, Rong
Shen, Hao
Liu, Chuanbin
Yu, Chuanwei
Yang, Jie
Cai, Yingming
Chen, Xingyan
Gao, Chengcheng
Wei, Likun
Abstract
A risk evaluation method for a windage yaw flashover, comprising: determining an influence factor of a windage yaw flashover of a power transmission line, and setting a risk evaluation index according to the influence factor (S101); generating standard cloud of the risk evaluation index according to an accident occurrence probability and consequence level of the risk evaluation index (S103); scoring the influence factor according to the risk evaluation index, and generating risk cloud of the risk evaluation index according to a scoring result (S105); and performing two-dimensional proximity calculation on the risk cloud and the standard cloud to obtain two-dimensional proximity between the risk cloud and the standard cloud, and determining risk level of the windage yaw flashover of the power transmission line according to the two-dimensional proximity (S107).
STATE GRID ECONOMIC AND TECHNOLOGICAL RESEARCH INSTITUTE CO., LTD (China)
NR ELECTRIC CO., LTD. (China)
XJ GROUP CORPORATION (China)
NARI TECHNOLOGY CO., LTD. (China)
BEIJING SGITG ACCENTURE INFORMATION TECHNOLOGY CENTER CO., LTD. (China)
HUAWEI TECHNOLOGY CO., LTD (China)
Inventor
Jin, Wei
Wang, Qing
Guo, Xianshan
Lyu, Jun
Liu, Siyuan
Zhang, Xiang
Wang, Yanguo
Zhang, Zhanguo
Wang, Haifeng
Tong, Chong
Li, Ming
Cheng, Wei
Zhao, Ning
Chen, Zhou
Hou, Xiaojun
Zhao, Hanqing
Abstract
A monitoring system based on a digital converter station includes a first monitoring terminal deployed at a first-level monitoring side, a second monitoring terminal deployed at a second-level monitoring side, and a third monitoring terminal deployed at a third-level monitoring side; the monitoring terminal at each level includes a communication module, a human-machine interaction module, a device status monitoring module, a device alarm management module, a video fusion processing module, and a data transmission adjustment and control module.
G06V 10/80 - Fusion, i.e. combining data from various sources at the sensor level, preprocessing level, feature extraction level or classification level
G06V 20/52 - Surveillance or monitoring of activities, e.g. for recognising suspicious objects
The present application discloses a dispatching and control cloud data processing method, device and system. The method includes the following operations: pilot node device acquires a global scheduling task, decomposes the global scheduling task to obtain scheduling tasks, issues the scheduling tasks to collaborative node device, acquires data collection ranges and data processing rules of the collaborative node devices, and delivers them to the collaborative node devices; the collaborative node devices receive and execute the scheduling tasks issued by the pilot node device; receives the data collection ranges and the data processing rules issued by the pilot node device, acquires, based on the scheduling tasks, collected data in the data collection ranges, processes the acquired collected data according to the data processing rules to obtain the processed data, uploads the processed data to the pilot node device; the pilot node device receives the processed data uploaded by the collaborative node devices.
ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID HUNAN ELECTRIC POWER COMPANY (China)
STATE GRID HUNAN ELECTRIC POWER COMPANY LIMITED (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Hao, Luxi
Wang, Ding
Shen, Yangwu
Hu, Yuhan
Guo, Hu
Ye, Jianxing
Ceng, Xiandong
Zhu, Lipeng
Li, Jiayong
Shen, Feifan
He, Lifu
Wang, Xiaoyuan
Abstract
A wind power forecasting error determination method, comprising: on the basis of historical data of a wind farm, acquiring data required by wind power forecasting error decoupling; in view of an actual wind farm forecasting process, dividing wind power forecasting into three operations, i.e., numerical weather prediction, a wind-electricity conversion model and prediction result correction; calculating an error caused by the prediction result correction; fitting the wind-electricity conversion model, fitting the output of the wind-electricity conversion model under real meteorological conditions, comparing the output with the output of the wind-electricity conversion model under numerical weather prediction conditions, and calculating the change in an error of the wind-electricity conversion model under different meteorological conditions; integrating a plurality of operations, and establishing a wind power error decoupling equation; and solving the equation, and calculating an error proportion.
G06Q 10/04 - Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
BEIJING SMARTCHIP MICROELECTRONICS TECHNOLOGY COMPANY LIMITED (China)
STATE GRID JIANGSU ELECTRIC POWER CO., LTD. (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Zhou, Chao
Zhao, Dongyan
Li, Dejian
Yang, Lixin
Niu, Bin
Dai, Shenglin
Abstract
The embodiments of the present invention belong to the technical field of communications. Provided are a data flow control method and apparatus based on single-bus information transmission, and a communication system. The data flow control method is based on a data receiving end, and comprises: detecting the state of a data buffer area of a data receiving end, wherein the state comprises the data buffer area being idle and the data buffer area being saturated; when the state of the data buffer area changes, sending an initialization signal to a data sending end; and when an initialization response signal from the data sending end is not received for more than a preset time, repeatedly sending the initialization signal; and in response to the initialization response signal from the data sending end, sequentially sending to the data sending end a write data preparation signal and the state of the data buffer area, wherein the initialization signal, the write data preparation signal and the state of the data buffer area are sent by means of a single flow control bus. By means of the embodiments of the present invention, the transmission of communication states between bus devices can be realized, and thus the loss of communication data can be effectively prevented.
A method for quantifying and assessing a scheduling risk considering source load fluctuation and rescheduling, and an apparatus for quantifying and assessing a scheduling risk considering source load fluctuation and rescheduling are provided. The method includes establishing a scene set considering a new energy disturbance; establishing and solving a rescheduling optimization model considering the new energy disturbance in each scene based on a preset scheduling plan according to the scene set, so as to obtain a solving result of the rescheduling optimization model; and calculating a risk quantifying and assessing result corresponding to the preset scheduling plan according to the solving result of the rescheduling optimization model.
BEIJING SMARTCHIP MICROELECTRONICS TECHNOLOGY COMPANY LIMITED (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Zhao, Dongyan
Zhang, Jiguang
Xie, Yong
Chi, Yingying
Zheng, Zhe
Wang, Lianzhong
Liu, Rui
Liu, Guojing
Cui, Wenpeng
Zhou, Xiaolu
Liu, Xiaoqun
Jia, Xiaoguang
Chen, Fei
Li, Yanbo
Zhao, Wenxian
Yu, Xiuli
Abstract
Disclosed in the present invention are a data sending method and apparatus, a data receiving method and apparatus, an electronic device, a chip, and a storage medium. The method comprises: after receiving a first express message and when a second express message is being sent by means of an express service interface indicated by a second interface identifier, sending a first steal control signal on the basis of first tuple information of the first express message; and according to the first steal control signal, controlling the second express message to pause sending by means of the express service interface indicated by the second interface identifier, and controlling the first express message to start sending by means of an express service interface indicated by a first interface identifier. A plurality of express service interfaces and a steal control signal carrying a steal indication and an interface identifier are designed for different levels of time delay and jitter requirements, a frame structure does not need to be changed, and the frame structure is consistent with a frame structure defined by standards, such that the probability of an opposite end not being able to receive a data stream is reduced, and the universality is improved.
FUJIAN NETPOWER TECHNOLOGY DEVELOPMENT CO., LTD. (China)
STATE GRID CORPORATION OF CHINA (China)
STATE GRID INFORMATION &TELECOMMUNICATION GROUP CO., LTD. (China)
Inventor
Zhan, Chao
Tan, Afeng
Jin, Zili
Ye, Han
Chen, Qinglei
Abstract
A smart terminal hardware interface test system, and a test method thereof. The system comprises: a smart terminal under test, said smart terminal comprising a core MCU board (1) and an interface group under test (2); and further comprises a test apparatus, the test apparatus comprising a module interface group (3), a module interface switching control module (4), a module communication test module (5), a voltage measurement module (6), a current measurement module (7), a load control module (8) and an MCU main control module (9). The module interface switching control module (4) is electrically connected to the module interface group (3), the module communication test module (5), the voltage measurement module (6), the current measurement module (7) and the MCU main control module (9). The voltage measurement module (6), the current measurement module (7) and the load control module (8) are all electrically connected to the MCU main control module (9). The current measurement module (7) is further electrically connected to the load control module (8). The present invention has the characteristics of improving test efficiency, lowering proficiency requirements of testers, and reducing costs.
G01R 35/04 - Testing or calibrating of apparatus covered by the other groups of this subclass of instruments for measuring time integral of power or current
GLOBAL ENERGY INTERCONNECTION RESEARCH INSTITUTE CO., LTD. (China)
STATE GRID CORPORATION OF CHINA (China)
State Grid Shanghai Electric Power Co. Ltd. (China)
Inventor
Deng, Zhanfeng
Zhao, Guoliang
Ge, Jun
Qiao, Guangyao
Mo, Xiaolin
Liang, Dong
Zhou, Zhe
Abstract
A high-frequency transformer includes: an iron core, primary windings and secondary windings, wherein the iron core is of an integrated equilateral triangle structure, the primary windings and the secondary windings are uniformly wound around three sides of the iron core, and the primary windings and/or the secondary windings are symmetrically distributed on the three sides.
NORTH CHINA ELECTRIC POWER RESEARCH INSTITUTE CO., LTD (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Liu, Lei
Yang, Zhenyong
Kang, Jingqiu
Gao, Mingshuai
Xing, Zhiwei
You, Mo
Chen, Zhenshan
Ma, Ning
Li, Zhan
Lai, Liankun
Shang, Yong
Gao, Aiguo
Shi, Chunhong
Abstract
1212122(x), and input the processed unit-side frequency signal into the frequency modulation control loop, so as to realize low-frequency oscillation suppression.
STATE GRID INFORMATION & TELECOMMUNICATION GROUP CO., LTD. (China)
STATE GRID JIANGSU ELECTRIC POWER CO., LTD. INFORMATION & TELECOMMUNICATION BRANCH (China)
STATE GRID INFORMATION & TELECOMMUNICATION BRANCH (China)
CHINA ACADEMY OF INFORMATION COMMUNICATIONS TECHNOLOGY (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Ou, Qinghai
Zhang, Ningchi
Wang, Yanru
Wang, Dayang
Jiang, Song
Zhang, Jie
Liu, Hui
Ma, Wenjie
Hou, Yue
She, Rui
Shu, Yi
Cai, Hao
Niu, Jianing
Chen, Zhiyu
Zhao, Junfeng
Li, Fang
Abstract
Provided in the present disclosure are a FlexE-based power communication service resource allocation method and apparatus, belonging to the technical field of communications. The method comprises: on the basis of an actual physical network, constructing an undirected graph model, the points in the undirected graph model representing physical nodes, and the sides in the undirected graph model representing physical links; and, on the basis of the undirected graph model, solving an optimization problem with the aim of minimizing the allocation of physical network resources while satisfying a slice service requirement, so as to obtain the latest use condition of the physical network resources and network topology mapping of a current network slice request. For FlexE network slice requests for different service requirements, the FlexE-based power communication service resource allocation method and apparatus provided by the present disclosure can reasonably map the slice requests to actual physical networks while meeting the slice service requirements such as the time delay bandwidth, thereby optimizing the allocation of physical network resources to the maximum extent, reducing the slice cost for tenants, and increasing the income of network providers.
STATE GRID HEBEI ELECTRIC POWER COMPANY ELECTRIC POWER RESEARCH INSTITUTE (China)
STATE GRID CORPORATION OF CHINA (China)
STATE GRID HEBEI ENERGY TECHNOLOGY SERVICE CO., LTD (China)
Inventor
Li, Tiecheng
Fan, Hui
Luo, Peng
Ren, Jiangbo
Wang, Xianzhi
Guo, Shaofei
Liu, Qingquan
Chen, Tianying
Abstract
The present invention provides a calculation method and apparatus for the schedulable potential of active loads, a terminal, and a storage medium. The method comprises: respectively establishing behavior characteristic mathematical models of different active loads on the basis of the behavior characteristics of the active loads in a power distribution network, the active loads being distributed active loads; and aggregating the behavior characteristic mathematical models of the different active loads by using a Minkowski summation mode, so as to obtain active load schedulable potential data that uses an intelligent building as a unit. According to an aggregation method based on a Minkowski sum, the present invention can aggregate original distributed active loads into active load schedulable potential data that uses an intelligent building as a unit, so that the behavior characteristics of the active loads can be retained, the aggregation accuracy is improved, the calculation mode is more objective, and the data characteristics are more comprehensive.
STATE GRID ECONOMIC AND TECHNOLOGICAL RESEARCH INSTITUTE CO., LTD (China)
NR ELECTRIC CO., LTD. (China)
XJ GROUP CORPORATION (China)
NARI TECHNOLOGY CO., LTD. (China)
BEIJING SGITG ACCENTURE INFORMATION TECHNOLOGY CENTER CO., LTD. (China)
HUAWEI TECHNOLOGY CO., LTD. (China)
Inventor
Jin, Wei
Wang, Qing
Guo, Xianshan
Lyu, Jun
Liu, Siyuan
Zhang, Xiang
Wang, Yanguo
Zhang, Zhanguo
Wang, Haifeng
Tong, Chong
Li, Ming
Cheng, Wei
Zhao, Ning
Chen, Zhou
Hou, Xiaojun
Zhao, Hanqing
Abstract
The present application discloses a monitoring system and method based on a digital converter station. The monitoring system comprises a first monitoring terminal deployed at a first-level monitoring side, a second monitoring terminal deployed at a second-level monitoring side, and a third monitoring terminal deployed at a third-level monitoring side. The monitoring terminal at each level comprises a communication module, a human-computer interaction module, a device state monitoring module, a device alarm management module, a video fusion processing module, and a data transmission regulation and control module. The video fusion processing modules are respectively deployed at the monitoring terminals at all levels, so that the monitoring terminals at all levels can locally respond to monitoring retrieval requests of users at all levels; a station end does not need to completely respond to the monitoring retrieval requests of the users at all the levels, a user can directly view a video fusion picture from the local and does not need to retrieve the video fusion picture from a remote end, and therefore, when network bandwidth resources are limited, network delay can be effectively reduced, the real-time performance of video picture display is improved, and the use effect of a video fusion application and user experience are improved.
A load decoupling loading apparatus for a wind turbine generator set, the apparatus comprising a plurality of actuators, a first loading bearing (201), a rotating shaft (202) and a second loading bearing (203), wherein the rotating shaft (202) is horizontally arranged with respect to the ground; the first loading bearing (201) and the second loading bearing (203) are respectively connected to two ends of the rotating shaft (202) in a sleeved manner, the end of the first loading bearing (201) that is away from the rotating shaft (202) is connected to an external electric motor, and the end of the second loading bearing (203) that is away from the rotating shaft (202) is connected to an external test prototype; the plurality of actuators are respectively connected to the first loading bearing (201) and the second loading bearing (203), and the actuators provide a five-degree-of-freedom load for the test prototype by means of the first loading bearing (201) and the second loading bearing (203); and the electric motor provides a torque load for the test prototype. The control over a plurality of actuators in the loading apparatus is implemented according to a five-degree-of-freedom load, thereby enhancing the loading control accuracy of a transmission chain of a wind turbine generator set and improving the experimental precision of the wind turbine generator set. Further provided are a load decoupling loading system for a wind turbine generator set, a load decoupling loading method for a wind turbine generator set, a simulation control system for a load decoupling loading method for a wind generator set, and a computer device and a computer-readable storage medium.
Provided in the embodiments of the present disclosure are a microgrid system, a control method therefor, an electronic device, a storage medium and a program product. The microgrid system comprises: an energy router, a distributed-energy-source power supply system and an electric load group. The energy router comprises an alternating-current bus, a power supply interface group, a load switch group, a communication system and an energy management system. The distributed-energy-source power supply system is electrically connected to the alternating-current bus by means of the power supply interface group. The electric load group is electrically connected to the alternating-current bus by means of the load switch group. The communication system is configured to perform, according to the current operating situation of the microgrid system and a preset energy management policy, communication between the energy router and the distributed-energy-source power supply system as well as the electric load group. The energy management system is configured to control, according to the current operating situation of the microgrid system and the preset energy management policy, the connection mode of the distributed-energy-source power supply system, so as to allow the microgrid system to enter a target power supply mode.
A method and apparatus for predicting the service life of a CMOS device, an electronic device, and a medium. The method for predicting the service life of a CMOS device comprises: acquiring a time series sample data set of an electrical parameter of a CMOS device under an accelerated stress test, the time series sample data set comprising time series sample data of a degradation amount of the electrical parameter characterizing the service life of the CMOS device (S101); obtaining a training set on the basis of the time series sample data set (S102); training a time series model by using the training set to obtain a service life prediction model (S103); and predicting failure time of the CMOS device by using the service life prediction model (S104). The method reduces the time cost of determining the service life of a CMOS device by performing a complete accelerated stress test on the CMOS device in the prior art, improves the product quality inspection efficiency, shortens the production period of CMOS devices, and solves the problem of low production efficiency of CMOS devices.
STATE GRID HEBEI ELECTRIC POWER COMPANY ELECTRIC POWER RESEARCH INSTITUTE (China)
STATE GRID CORPORATION OF CHINA (China)
STATE GRID HEBEI ENERGY TECHNOLOGY SERVICE CO., LTD. (China)
Inventor
Meng, Liang
Fan, Hui
Hu, Xuekai
Li, Tiecheng
Meng, Zhengji
Su, Can
Zhou, Wen
Wang, Lei
Abstract
An inverter impedance measurement method and apparatus, a terminal device and a storage medium, which relate to the technical field of impedance measurement. The method comprises: acquiring a disturbance voltage frequency domain signal and a response current frequency domain signal when a disturbance voltage of a first disturbance frequency is injected to an inverter, and acquiring a disturbance voltage frequency domain signal and a response current frequency domain signal when a disturbance voltage of a second disturbance frequency is injected to the inverter (101); determining a first disturbance voltage signal, a first response current signal, a second disturbance voltage signal and a second response current signal according to the disturbance voltage frequency domain signals and the response current frequency domain signals (102); determining a first impedance of the first disturbance frequency and a second impedance of the second disturbance frequency according to the disturbance voltage signals and the response current signals (103); and determining the impedance of a preset frequency according to the first impedance and the second impedance (104). The precision of inverter impedance measurement can be improved, and the accuracy of subsequent dynamic characteristic analysis of the inverter can thus be improved.
STATE GRID SMART GRID RESEARCH INSTITUTE CO., LTD. (China)
STATE GRID FUJIAN ELECTRIC POWER RESEARCH INSTITUTE (China)
STATE GRID CORPORATION OF CHINA (China)
Inventor
Yang, Jie
Wang, Sichao
Yang, Yuexi
Li, Chunpeng
Han, Congda
Zhang, Hanbin
Huang, Junwei
Lin, Guodong
Abstract
A transient stress suppression method and apparatus for a grid forming type converter. The method comprises: on the basis of a direct-current voltage deviation and an alternating-current voltage deviation of a grid forming type converter, respectively generating a phase instruction and a voltage amplitude instruction; and, on the basis of the phase instruction and the amplitude instruction, generating a sine pulse width modulation signal used for controlling the grid forming type converter. The technical solution can ensure system stability of grid forming type converters, and can effectively cope with the problems of direct-current voltage limit exceeding and system instantaneous over-currents possibly occurring during transient response processes.
The embodiments of the present application relate to an aqueous high-thermal-conductivity anticorrosive paint, which comprises a component A and a component B, wherein the component A comprises a film-forming substance, deionized water, a dispersing agent, a defoaming agent, a multi-effect cosolvent, a composite thickener and a high-thermal-conductivity additive; and the component B comprises at least one aqueous curing agent and a cosolvent B, the high-thermal-conductivity additive being a carbon-based thermally conductive material. Further disclosed in the present application is a production method for the high-thermal-conductivity anticorrosive paint, which is used for producing the aqueous high-thermal-conductivity anticorrosive paint. In the present application, a high-thermal-conductivity additive is added to a water-soluble film-forming substance, so as to improve the thermal conductivity of an anticorrosive paint; a plurality of cosolvents are added to the water-soluble film-forming substance, such that a good film-forming effect that the high-thermal-conductivity additive is uniformly distributed in a paint film is realized, thereby achieving good thermal conductivity.
The present disclosure relates to the field of power semiconductors, and particularly discloses a super-junction semiconductor device and a manufacturing method therefor. The manufacturing method comprises: etching a first predetermined region of a wafer by means of a deep trench etching process to obtain at least one Ai deep trench, and filling the Ai deep trench with a first epitaxial layer having a doping concentration of NAi to form an i-th-layer epitaxial pillar of a first conductive type; etching a second predetermined region of the wafer by means of the deep trench etching process to obtain at least one Di deep trench, and filling the Di deep trench with a second epitaxial layer having a doping concentration of NDi to form an i-th-layer epitaxial pillar of a second conductive type; and repeating the steps above to manufacture a super-junction structure in the wafer. The technical solution solves the void problem caused by the conventional single epitaxial filling of deep trenches. The method is mainly used for manufacturing a super-junction semiconductor device.
STATE GRID HEBEI ELECTRIC POWER COMPANY ELECTRIC POWER RESEARCH INSTITUTE (China)
STATE GRID CORPORATION OF CHINA (China)
STATE GRID HEBEI ENERGY TECHNOLOGY SERVICE CO., LTD (China)
Inventor
Fan, Hui
Liang, Jifeng
Zeng, Siming
Li, Xiaojun
Li, Tiecheng
Luo, Peng
Zhao, Yuhao
Zhang, Rui
Abstract
The present disclosure belongs to the technical field of optimization scheduling of power distribution networks. Provided are a consistency algorithm-based cloud-edge collaboration regulation and control method and system for a power distribution area group. The method comprises: a leader of each area group sending, to a cloud server, a group power deviation and regulation and control cost information of the corresponding area group; for each area group, the leader of the current area group receiving regulation and control amount information sent by the cloud server; according to the regulation and control amount information, calculating the current cost micro-increment rate of each area in the current area group, and determining a regulation and control power corresponding to the current cost micro-increment rate; and in response to the regulation and control power meeting a preset constraint condition, determining the regulation and control power of the area in the current area group according to the current cost micro-increment rate. In this way, a power grid environment change can be adapted, and the reliability and real-time performance of scheduling of a power distribution network are improved.
H02J 13/00 - Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the networkCircuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
H02J 3/00 - Circuit arrangements for ac mains or ac distribution networks
H02J 3/48 - Controlling the sharing of the in-phase component
100.
CONFIGURATION OPTIMIZATION METHOD FOR MICROGRID DISTRIBUTED PHOTOVOLTAIC POWER GENERATION SYSTEM AND TERMINAL DEVICE
STATE GRID HEBEI ELECTRIC POWER COMPANY ELECTRIC POWER RESEARCH INSTITUTE (China)
STATE GRID CORPORATION OF CHINA (China)
STATE GRID HEBEI ENERGY TECHNOLOGY SERVICE CO., LTD. (China)
Inventor
Hu, Xuekai
Fan, Hui
Meng, Zhengji
Meng, Liang
Li, Tiecheng
Zhang, Bo
Zhou, Wen
Abstract
The present application is suitable for the technical field of photovoltaic inverter planning and design, and provides a configuration optimization method for a microgrid distributed photovoltaic power generation system and a terminal device. The method comprises: acquiring photovoltaic power generation data of a preset fixed number of years of a region where a photovoltaic power generation system is located; on the basis of the capacity ratio and power limit value data of each individual in a differential evolution algorithm population, acquiring the output power and net increased power generation capacity of a photovoltaic inverter in the photovoltaic power generation system; on the basis of the photovoltaic power generation data and the output power of the photovoltaic inverter, calculating the junction temperature of an IGBT by using an XGBoost machine learning algorithm, and estimating the service life of the IGBT; calculating a fitness value of each individual on the basis of the service life of the IGBT and the net increased power generation capacity, and then outputting an optimal capacity ratio and power limit value of the photovoltaic power generation system by using a differential evolution algorithm. The method of the present application can reduce the time consumed for calculating the junction temperature of the IGBT, simplify the reliability evaluation process of the photovoltaic inverter, and determine the optimal capacity ratio and power limit value of the photovoltaic power generation system while the service life of the IGBT and the net increased power generation capacity are taken into account.
G06F 30/27 - Design optimisation, verification or simulation using machine learning, e.g. artificial intelligence, neural networks, support vector machines [SVM] or training a model