Fairplay Towage Polska Spółka z ograniczoną odpowiedzialnością Sp.k.

Poland

Back to Profile

1-2 of 2 for Fairplay Towage Polska Spółka z ograniczoną odpowiedzialnością Sp.k. Sort by
Query
Aggregations
Jurisdiction
        World 1
        Canada 1
IPC Class
B60D 1/18 - Tow ropes, chains, or the like 2
B63B 21/66 - Equipment specially adapted for towing underwater objects or vessels, e.g. fairings for tow-cables 2
B63B 35/28 - Barges or lighters 2
E02B 17/02 - Artificial islands mounted on piles or like supports, e.g. platforms on raisable legsConstruction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto 2
F03D 13/25 - Arrangements for mounting or supporting wind motorsMasts or towers for wind motors specially adapted for offshore installation 2
See more
Status
Pending 1
Registered / In Force 1
Found results for  patents

1.

TRANSPORT CAP OF A SEA FOUNDATION PILE, INSTALLATION CRADLE OF THE TRANSPORT CAP OF A SEA FOUNDATION PILE, METHOD OF INSTALLING A TRANSPORT CAP INSIDE A FOUNDATION PILE, TOWING SET OF SEA FOUNDATION PILES, METHOD OF SEA TOWAGE FOUNDATION PILES AND PREPARATION OF A FOUNDATION PILE FOR INSTALLATION IN THE SEABED

      
Application Number PL2022000012
Publication Number 2022/182258
Status In Force
Filing Date 2022-02-24
Publication Date 2022-09-01
Owner FAIRPLAY TOWAGE POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ SP.K. (Poland)
Inventor
  • Wiater, Morosław
  • Ryż, Arkadiusz

Abstract

The pile plug (1) has independent buoyancy, high displacement and a rigid structure of the skeleton (2) and a flexible sheath (3) at least on the side surface of the plug body, while the flexible sheath constitutes an airtight container equipped with pneumatic valves (4). The sheathing material (3) of the plug (1) can be made of a material with a high friction coefficient in relation to the pile material selected from the group: natural rubber, synthetic rubber, polyurethane. Inside the cap (1) there is a pile venting pipe (14) closed with a pile venting valve (15), which connects the space inside the pile with the surroundings. Preferably, the cap (1) has a ballast load (16) internally for positioning the plug with respect to the pile and for balancing the cap horizontally and also preventing unfavourable rotation of the pile.

IPC Classes  ?

  • B63B 21/66 - Equipment specially adapted for towing underwater objects or vessels, e.g. fairings for tow-cables
  • B63B 35/28 - Barges or lighters
  • B60D 1/18 - Tow ropes, chains, or the like
  • F16L 55/134 - Means for stopping flow in pipes or hoses by introducing into the pipe a member expandable in situ introduced axially into the pipe or hose the closure device being a plug fixed by radially deforming the packing by means of an inflatable packing
  • E02D 27/12 - Pile foundations
  • E02B 17/02 - Artificial islands mounted on piles or like supports, e.g. platforms on raisable legsConstruction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
  • F03D 13/25 - Arrangements for mounting or supporting wind motorsMasts or towers for wind motors specially adapted for offshore installation
  • F16L 1/16 - Laying or reclaiming pipes on or under water on the bottom

2.

TRANSPORT CAP OF A SEA FOUNDATION PILE, INSTALLATION CRADLE OF THE TRANSPORT CAP OF A SEA FOUNDATION PILE, METHOD OF INSTALLING A TRANSPORT CAP INSIDE A FOUNDATION PILE, TOWING SETOF SEA FOUNDATION PILES, METHOD OF SEA TOWAGE FOUNDATION PILES AND PREPARATION OF A FOUNDATION PILE FOR INSTALLATION IN THE SEABED

      
Document Number 03209553
Status Pending
Filing Date 2022-02-24
Open to Public Date 2022-09-01
Owner FAIRPLAY TOWAGE POLSKA SPOLKA Z OGRANICZONA ODPOWIEDZIALNOSCIA SP.K. (Poland)
Inventor
  • Wiater, Miroslaw
  • Ryz, Arkadiusz

Abstract

The pile plug (1) has independent buoyancy, high displacement and a rigid structure of the skeleton (2) and a flexible sheath (3) at least on the side surface of the plug body, while the flexible sheath constitutes an airtight container equipped with pneumatic valves (4). The sheathing material (3) of the plug (1) can be made of a material with a high friction coefficient in relation to the pile material selected from the group: natural rubber, synthetic rubber, polyurethane. Inside the cap (1) there is a pile venting pipe (14) closed with a pile venting valve (15), which connects the space inside the pile with the surroundings. Preferably, the cap (1) has a ballast load (16) internally for positioning the plug with respect to the pile and for balancing the cap horizontally and also preventing unfavourable rotation of the pile.

IPC Classes  ?

  • B60D 1/18 - Tow ropes, chains, or the like
  • B63B 21/66 - Equipment specially adapted for towing underwater objects or vessels, e.g. fairings for tow-cables
  • B63B 35/28 - Barges or lighters
  • E02B 17/02 - Artificial islands mounted on piles or like supports, e.g. platforms on raisable legsConstruction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
  • F03D 13/25 - Arrangements for mounting or supporting wind motorsMasts or towers for wind motors specially adapted for offshore installation
  • F16L 1/16 - Laying or reclaiming pipes on or under water on the bottom
  • F16L 55/134 - Means for stopping flow in pipes or hoses by introducing into the pipe a member expandable in situ introduced axially into the pipe or hose the closure device being a plug fixed by radially deforming the packing by means of an inflatable packing