Résultats pour
brevets
1.
|
Automated pipeline construction modelling
| Numéro d'application |
16615381 |
| Numéro de brevet |
11543080 |
| Statut |
Délivré - en vigueur |
| Date de dépôt |
2018-05-23 |
| Date de la première publication |
2020-05-21 |
| Date d'octroi |
2023-01-03 |
| Propriétaire |
LUX MODUS LTD. (Canada)
|
| Inventeur(s) |
- Hlady, Joseph
- Glanzer, Matthew
- Fugate, Lance
- Ghouaiel, Nehla
- Legesse, Rachel
- Akhlaghi Esfahany, Siamak
|
Abrégé
Methods and systems for modelling pipeline construction, include or implement steps of (a) obtaining ranging data of a pipeline construction location including a pipe; (b) processing the ranging data to produce a spatially organized point cloud; and (c) processing the point cloud to identify at least one geometric feature comprising a point or a two-dimensional feature representative of a pipe centreline, and associating the at least one geometric feature with the pipeline construction location. The ranging data may be data obtained from a lidar device. The pipeline construction may be underground construction, where pipe is laid in a ditch. Relevant information, such as depth-of-cover may be calculated from identified geometric features. Relevant information may be determined in real-time or near-real-time and displayed, communicated or recorded as desired.
Classes IPC ?
- G01S 17/42 - Mesure simultanée de la distance et d'autres coordonnées
- G01S 17/89 - Systèmes lidar, spécialement adaptés pour des applications spécifiques pour la cartographie ou l'imagerie
- G01S 19/42 - Détermination de position
- F17D 5/00 - Protection ou surveillance des installations
- G01S 7/481 - Caractéristiques de structure, p. ex. agencements d'éléments optiques
|
2.
|
AUTOMATED PIPELINE CONSTRUCTION MODELLING
| Numéro d'application |
CA2018050603 |
| Numéro de publication |
2018/213927 |
| Statut |
Délivré - en vigueur |
| Date de dépôt |
2018-05-23 |
| Date de publication |
2018-11-29 |
| Propriétaire |
LUX MODUS LTD. (Canada)
|
| Inventeur(s) |
- Hlady, Joseph
- Glanzer, Matthew
- Fugate, Lance
- Ghouaiel, Nehla
- Legesse, Rachel
- Akhlaghi Esfahany, Siamak
|
Abrégé
Methods and systems for modelling pipeline construction, include or implement steps of (a) obtaining ranging data of a pipeline construction location including a pipe; (b) processing the ranging data to produce a spatially organized point cloud; and (c) processing the point cloud to identify at least one geometric feature comprising a point or a two-dimensional feature representative of a pipe centreline, and associating the at least one geometric feature with the pipeline construction location. The ranging data may be data obtained from a lidar device. The pipeline construction may be underground construction, where pipe is laid in a ditch. Relevant information, such as depth-of-cover may be calculated from identified geometric features. Relevant information may be determined in real-time or near-real-time and displayed, communicated or recorded as desired.
Classes IPC ?
- G01C 7/00 - Tracé de profils
- F17D 5/00 - Protection ou surveillance des installations
- G01C 7/04 - Tracé de profils des surfaces du terrain mettant en jeu un véhicule qui se déplace le long du profil à tracer
- G01C 17/08 - Suspension des éléments magnétiques par flottage
|
3.
|
AUTOMATED PIPELINE CONSTRUCTION MODELLING
| Numéro de document |
03064611 |
| Statut |
En instance |
| Date de dépôt |
2018-05-23 |
| Date de disponibilité au public |
2018-11-29 |
| Propriétaire |
LUX MODUS LTD. (Canada)
|
| Inventeur(s) |
- Hlady, Joseph
- Glanzer, Matthew
- Fugate, Lance
- Ghouaiel, Nehla
- Legesse, Rachel
- Akhlaghi Esfahany, Siamak
|
Abrégé
Methods and systems for modelling pipeline construction, include or implement steps of (a) obtaining ranging data of a pipeline construction location including a pipe; (b) processing the ranging data to produce a spatially organized point cloud; and (c) processing the point cloud to identify at least one geometric feature comprising a point or a two-dimensional feature representative of a pipe centreline, and associating the at least one geometric feature with the pipeline construction location. The ranging data may be data obtained from a lidar device. The pipeline construction may be underground construction, where pipe is laid in a ditch. Relevant information, such as depth-of-cover may be calculated from identified geometric features. Relevant information may be determined in real-time or near-real-time and displayed, communicated or recorded as desired.
Classes IPC ?
- F17D 5/00 - Protection ou surveillance des installations
- G01C 7/00 - Tracé de profils
- G01C 7/04 - Tracé de profils des surfaces du terrain mettant en jeu un véhicule qui se déplace le long du profil à tracer
- G01C 17/08 - Suspension des éléments magnétiques par flottage
|
|