The present invention relates to a prefabricated infilled panel-frame structure capable of accommodating seismic-loading and seismic energy dissipation, and a construction method thereof, including a frame body, a prefabricated infilled panel group, a panel connector, and a disc spring assembly. During an earthquake, the present invention slides to dissipate energy only after the maximum starting sliding force is exceeded, thus providing the structure with a relatively high lateral stiffness prior to sliding. After an earthquake, the disc spring assembly of the present invention may provide a certain restoring force due to being compressed so as to reduce the residual displacement. Further, the present invention achieves the bidirectional deformation cooperation of the prefabricated infilled panel under earthquakes, so that the infilled panel may still achieve the function of seismic energy dissipation under the coupling action of in-plane and out-of-plane loads.
E04H 9/02 - Bâtiments, groupes de bâtiments ou abris conçus pour résister à des situations extérieures anormales, p.ex. à des bombardements, à des séismes ou à des climats extrêmes, ou pour se protéger de ces situations résistant aux séismes ou à l'effondrement du sol
2.
ANTI-SEISMIC AND SHOCK-ABSORBING COOPERATIVE PREFABRICATED INFILL WALLBOARD-FRAME STRUCTURE AND CONSTRUCTION METHOD
An anti-seismic and shock-absorbing cooperative prefabricated infill wallboard-frame structure and a construction method, which relate to the field of building shock absorption. The structure comprises a frame main body, a prefabricated infill wallboard group, wallboard group clamping members (9), disc spring assemblies (10) and U-shaped connectors (12), wherein the prefabricated infill wallboard group is arranged in the frame main body; the wallboard group clamping members (9) are arranged between left and right sides of the top of the prefabricated infill wallboard group and the frame main body; the disc spring assemblies (10) are arranged between left and right sides of a lower portion of the prefabricated infill wallboard group and the frame main body; the prefabricated infill wallboard group comprises a plurality of vertical sub-wallboards; and each vertical sub-wallboard comprises a main board, a shock-absorbing layer (8) and an auxiliary board. The lateral resistance capability and the post-earthquake recoverability of the structure are improved.
E04B 2/56 - Murs avec ossature d'encadrement ou potelets; Murs comportant des pièces allongées supportant la charge
E04B 1/98 - Protection contre d'autres agents indésirables ou dangers contre les destructions mécaniques, p.ex. par les raids aériens
E04C 2/284 - Eléments de construction de relativement faible épaisseur pour la construction de parties de bâtiments, p.ex. matériaux en feuilles, dalles ou panneaux caractérisés par des matériaux spécifiés composés de matériaux couverts par plusieurs des groupes , , ou de matériaux couverts par un de ces groupes avec un matériau non spécifié dans l'un de ces groupes au moins un des matériaux étant isolant
E04C 2/30 - Eléments de construction de relativement faible épaisseur pour la construction de parties de bâtiments, p.ex. matériaux en feuilles, dalles ou panneaux caractérisés par la forme ou la structure
E04G 21/00 - Préparation, transport ou travail sur place des matériaux ou des éléments de construction; Autres dispositifs ou mesures concernant les travaux de construction
E04B 1/61 - Assemblages pour les constructions du bâtiment en général d'éléments de construction en forme de plaques en contact mutuel
3.
ANTI-SEISMIC TOUGHNESS PREFABRICATED CONCRETE FRAME STRUCTURE AND CONSTRUCTION METHOD THEREFOR
The present invention provides an anti-seismic toughness prefabricated concrete frame structure and a construction method therefor. The frame structure comprises precast solid columns, precast composite beams, T-shaped shear connectors having notches, and anti-buckling energy-dissipation connecting plates, wherein the precast composite beams are connected to the precast solid columns and each comprise a precast composite middle beam and precast composite cantilever beams arranged at two sides of each of the precast composite middle beams; tops of the precast composite cantilever beams and the precast composite middle beams are connected by the T-shaped shear connectors having notches, and the notches in the T-shaped shear connectors having notches are located at a neutral bending moment point of the frame structure under the action of a vertical load; and side surfaces of the precast composite cantilever beams and the precast composite middle beams are connected by means of the anti-buckling energy-dissipation connecting plates. The present invention uses an energy consumption mechanism of suspension rotation, and has the advantages of simple and easy construction and mounting, a weak floor effect, controllable member damage, a sufficient energy dissipation capability, efficient post-earthquake repair, remarkable economic benefits, etc.
E04B 1/19 - Structures à ossature tridimensionnelle
E04B 1/58 - Assemblages pour les constructions du bâtiment en général d'éléments de construction en forme de barre
E04C 5/16 - Pièces auxiliaires pour armatures, p.ex. pièces de séparation, étriers
E04C 3/20 - Poutrelles; Solives, fermes ou structures analogues à des fermes, p.ex. préfabriquées; Linteaux; Traverses en béton ou autre matériau analogue à la pierre, p.ex. avec armatures ou tirants
E04C 3/34 - Colonnes; Piliers; Arcs-boutants en béton ou autre matériau analogue à la pierre, avec ou sans éléments de coffrage permanents, avec ou sans armature interne ou externe, p.ex. recouvrements métalliques
E04B 1/98 - Protection contre d'autres agents indésirables ou dangers contre les destructions mécaniques, p.ex. par les raids aériens
E04H 9/02 - Bâtiments, groupes de bâtiments ou abris conçus pour résister à des situations extérieures anormales, p.ex. à des bombardements, à des séismes ou à des climats extrêmes, ou pour se protéger de ces situations résistant aux séismes ou à l'effondrement du sol
E04G 21/14 - Transport ou assemblage des éléments de construction
4.
PRESSURIZATION AND OXYGEN SUPPLEMENTATION MODULAR RESIDENTIAL COMPLEX IN HIGH-ALTITUDE AREA, AND METHOD FOR USING SAME
CHINA CONSTRUCTION THIRD ENGINEERING BUREAU GROUP CO., LTD. (Chine)
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LIMITED (Chine)
Inventeur(s)
Zhang, Kun
Abrégé
The present invention relates to a pressurization and oxygen supplementation modular residential complex in a high-altitude area. The complex uses a modular design and comprises module units, i.e., several standard compartments, a connecting node compartment, a connecting walkway compartment, a transition compartment, an equipment compartment, a sewage collecting compartment and a large-span space, wherein each module unit can be subjected to free assembly and any functional expansion in a plane direction and a vertical direction; the standard compartments are used for meeting a plurality of functional scenario requirements; the connecting node compartment and the connecting walkway compartment are used for spatial communication and personnel traffic between the standard compartments, between the standard compartment and the transition compartment and between the standard compartment and the large-span space; the transition compartment is used for indoor and outdoor pressure transition and personnel in-out of the complex; an intelligent pressurization and oxygen supplementation system is arranged in the equipment compartment; the sewage collecting compartment is used for collecting and treating sewage in the complex; and the large-span space is used for multicrowd large meetings, large gatherings and sports. The present invention meets the design requirements of a larger spatial scale, a higher pressurization capability, more residential functions, and lower cost operation.
E04H 14/00 - Bâtiments pour combinaison d'emplois différents non couverts par un seul des groupes de la présente sous-classe, p.ex. pour double emploi; Bâtiments du type où l'on peut pénétrer en voiture
E04B 1/76 - Isolation thermique ou acoustique, absorption ou réflexion de la chaleur ou du son; Autres méthodes de construction procurant des conditions thermiques ou acoustiques favorables, p.ex. par accumulation de chaleur à l'intérieur des murs spécifiquement relatives à la chaleur uniquement
E04B 1/94 - Protection contre d'autres agents indésirables ou dangers contre le feu
E04B 1/342 - Structures couvrant une vaste surface dégagée, qu'elles soient ou non ouvertes sur le côté, p.ex. hangars, halls
F03D 9/00 - Adaptations des mécanismes moteurs à vent pour une utilisation particulière; Combinaisons des mécanismes moteurs à vent avec les appareils qu’ils entrainent; Mécanismes moteurs à vent spécialement adaptés à l’installation dans des endroits particuliers
F03D 9/11 - Combinaisons des mécanismes moteurs à vent avec un appareil emmagasinant de l’énergie emmagasinant de l’énergie électrique
F04B 41/02 - Installations ou systèmes de pompage spécialement adaptés aux fluides compressibles comportant des réservoirs
G01D 21/02 - Mesure de plusieurs variables par des moyens non couverts par une seule autre sous-classe
H02J 3/32 - Dispositions pour l'équilibrage de charge dans un réseau par emmagasinage d'énergie utilisant des batteries avec moyens de conversion
H02J 3/38 - Dispositions pour l’alimentation en parallèle d’un seul réseau, par plusieurs générateurs, convertisseurs ou transformateurs
H02J 9/06 - Circuits pour alimentation de puissance de secours ou de réserve, p.ex. pour éclairage de secours dans lesquels le système de distribution est déconnecté de la source normale et connecté à une source de réserve avec commutation automatique
G08B 17/10 - Déclenchement par la présence de fumée ou de gaz
G08B 7/06 - Systèmes de signalisation selon plus d'un des groupes ; Systèmes d'appel de personnes selon plus d'un des groupes utilisant une transmission électrique
37 - Services de construction; extraction minière; installation et réparation
Produits et services
Construction engineering services [construction
supervision]; building construction supervision;
construction project management services [construction
supervision]; construction information; construction
consultancy; repair information; installation of doors and
windows; warehouse construction and repair; demolition of
buildings; scaffolding; laying of cable; plastering;
construction of steel structures; harbour construction;
factory construction; pipeline construction and maintenance;
concrete raising services; construction; renovation and
restoration of buildings; rental of construction machines
and apparatus; rental of construction equipment; building
construction service; building damp-proofing; damp-proofing
[building]; building insulating; building reinforcing;
building construction; building caulking services; building
maintenance and repair; repair of buildings; rental of
cranes [construction equipment]; pier breakwater building;
riveting; asphalting; road paving; tile laying, bricklaying
or block laying; bricklaying; rental of cleaning machines;
furnace installation and repair; grouting services;
underwater dredging; underwater repair; rental of
bulldozers; rental of excavators; pumicing; masonry; mining
extraction; quarrying services; well drilling; drilling of
wells; application of slip-resistant safety floor sealers;
installation and repair of door frames; window cleaning;
cleaning of buildings [interior]; cleaning of buildings
[exterior surface]; chimney sweeping; painting, interior and
exterior; upholstering; upholstery repair; wallpaper
hanging; wallpapering; installation and repair of window
blinds; painting services; painting or repair of signs;
plastering and painting of building interiors; heating
equipment installation and repair; boiler cleaning and
repair; heating equipment installation and repair; burner
maintenance and repair; office machines and equipment
installation, maintenance and repair; information on the
maintenance of measuring and test equipment; repair or
maintenance of measuring and testing machines and
instruments; kitchen equipment installation; electric
appliance installation and repair; irrigation devices
installation and repair; repair or maintenance of chemical
processing machines and apparatus; machinery installation,
maintenance and repair; repair or maintenance of integrated
circuits manufacturing machines and systems; installation,
maintenance and repair of computer hardware; repair or
maintenance of construction machines and apparatus;
installation, maintenance and repair of apparatus for
processing metals; air conditioning apparatus installation
and repair; freezing equipment installation and repair;
interference suppression in electrical apparatus; repair or
maintenance of gas water heaters; installation and
maintenance of sanitary apparatus; rebuilding machines that
have been worn or partially destroyed; maintenance and
repair of medical instruments, apparatus and equipment;
installation and maintenance of bathing apparatus;
installation and repair of lighting apparatus; automobile
reconditioning services; vehicle service stations
[refuelling and maintenance]; gasoline refueling services
for motor vehicles; maintenance and repair of land vehicles;
motor vehicle maintenance and repair; vehicle maintenance;
vehicle battery charging; anti-rust treatment for vehicles;
vehicle lubrication [greasing]; vehicle washing; vehicle
polishing; information and consultancy services relating to
vehicle repair; airplane maintenance and repair;
shipbuilding; film projector repair and maintenance;
photographic apparatus repair; clock and watch repair; safe
maintenance and repair; strong-room maintenance and repair;
repair of security locks; rustproofing; re-tinning;
retreading of tires [tyres]; vulcanization of tyres
[repair]; rubber tyre repair; furniture maintenance;
furniture restoration; carpentry services; textile
laundering; renovation of clothing; maintenance and repair
of clothing; dry cleaning; leather care, cleaning and
repair; fur care, cleaning and repair; washing of linen;
cleaning of clothing; clothing repair; linen ironing;
pressing of clothing; vermin exterminating, other than for
agriculture, aquaculture, horticulture and forestry;
disinfecting; shoes polishing services; cleaning of storage
tanks; telephone installation and repair; elevator
installation and repair; burglar alarm installation and
repair; septic tank cleaning; fire alarm installation and
repair; restoration of musical instruments; knife
sharpening; rental of drainage pumps; pump repair;
artificial snow-making services; repair of hand tools;
repair and restoration of books; repair of binoculars;
repair of toys or dolls; repair of power lines; rental of
dish washing machines; suitcase repair; restoration of works
of art; repair of game machines and apparatus; swimming-pool
maintenance; installation and maintenance of entertainment
or sports apparatus; umbrella repair; jewelry repair.
37 - Services de construction; extraction minière; installation et réparation
42 - Services scientifiques, technologiques et industriels, recherche et conception
Produits et services
Advertising; online advertising on a computer network;
business management and organization consultancy; market
research; administrative assistance in responding to calls
for tenders; organization of exhibitions for commercial or
advertising purposes; marketing; procurement services for
others [purchasing goods and services for other businesses];
sales promotion for others; systemization of information
into computer databases. Construction engineering services [construction
supervision]; building construction supervision;
construction information; construction consultancy; repair
information; installation of doors and windows; installation
of water pipes; warehouse construction and repair;
demolition of buildings; scaffolding; plastering; roofing
services; furnace installation and repair; factory
construction; pipeline construction and maintenance;
construction; rental of construction equipment;
damp-proofing [building]; building insulating; rental of
cranes [construction equipment]; pier breakwater building;
riveting; asphalting; road paving; bricklaying; rental of
cleaning machines; rental of road sweeping machines;
building of fair stalls and shops; underwater construction;
underwater repair; rental of bulldozers; rental of
excavators; pumicing; sanding; masonry; window cleaning;
cleaning of buildings [interior]; cleaning of buildings
[exterior surface]; street cleaning; chimney sweeping;
painting, interior and exterior; upholstering; upholstery
repair; wallpapering; painting services; painting or repair
of signs; boiler cleaning and repair; heating equipment
installation and repair; burner maintenance and repair;
machinery installation, maintenance and repair; motor
vehicle maintenance and repair; elevator installation and
repair. Urban planning; engineering drawing; research and
development of new products for others; geological surveys;
material testing; technical project studies in the field of
construction; architectural services; architectural
consultancy; design of interior decor; consultancy in the
design and development of computer hardware.
7.
METHOD AND SYSTEM FOR TRACING FULL-LIFE-CYCLE QUALITY OF PREFABRICATED PART BASED ON BLOCKCHAIN
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LIMITED (Chine)
Inventeur(s)
Zeng, Tao
Guo, Haishan
Liu, Kang
Cao, Yuzhong
Yang, Xiaojie
Qi, Hu
Li, Liming
Abrégé
The present disclosure discloses a method and system for tracing a full-life-cycle quality of a prefabricated part based on a blockchain, wherein the method includes: step S1: establishing a prefabricated-part-quality tracing standard in which tracing information is able to be intercommunicated; step S2: gathering and storing tracing information of quality events of the prefabricated part at nodes during a full life cycle; step S3: performing blockchain distributed bookkeeping to the tracing information of the quality events of the prefabricated part at the nodes during the full life cycle; and step S4: realizing quality tracing of the prefabricated part at the nodes during the full life cycle based on a uniform tracing interface and a safe access policy. The present disclosure can effectively solve the problems in the standard, efficiency, reliance, safety and supervision of the quality tracing of prefabricated parts in the industrialization of novel constructions.
H04L 9/06 - Dispositions pour les communications secrètes ou protégées; Protocoles réseaux de sécurité l'appareil de chiffrement utilisant des registres à décalage ou des mémoires pour le codage par blocs, p.ex. système DES
G06K 7/14 - Méthodes ou dispositions pour la lecture de supports d'enregistrement par radiation corpusculaire utilisant la lumière sans sélection des longueurs d'onde, p.ex. lecture de la lumière blanche réfléchie
H04W 4/80 - Services utilisant la communication de courte portée, p.ex. la communication en champ proche, l'identification par radiofréquence ou la communication à faible consommation d’énergie
8.
Large-angle sloping roof steel structure and construction method thereof
CHINA CONSTRUCTION FIRST DIVISION GROUP CONSTRUCTION & DEVELOPMENT CO., LTD. (Chine)
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LIMITED (Chine)
China construction first group corporation limited (Chine)
Inventeur(s)
Zhou, Yuqi
Xue, Gang
Li, Honghai
Liao, Ganglin
Liu, Qiang
Lin, Zuojiang
Zhang, Yiqing
Song, Yu
Wang, Hongyuan
Zhou, Le
Abrégé
A large-angle sloping roof steel structure connected to a main body structure, including: an intermediate platform, inclined main supporting steel columns circumferentially connected at four corners of the intermediate platform, constructing steel columns and wind-proof surrounding beam connected between top ends of the inclined main supporting steel columns, where roof purlin are connected between the adjacent inclined main supporting steel columns at intervals. The invention provides a top-down inverted construction method for a large-angle sloping roof with a steel structure as the main structural form. By using the method, the operation safety of an inclined main stressed vertical member during the installation process can be ensured, and the investment of supporting measures is reduced by preferentially installing the intermediate platform, thus effectively ensuring the installation progress, quality and safety of the sloping roof steel structure. The present invention can be widely applied to sloping roof construction.
THE THIRD CONSTRUCTION CO., LTD OF CHINA CONSTRUCTION THIRD ENGNEERING BUREAU (Chine)
CHINA CONSTRUCTION THIRD ENGINEERING BUREAU GROUP CO., LTD (Chine)
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION (Chine)
Inventeur(s)
Liu, Xiaoqing
Lu, Huayong
Ding, Weixiang
Wang, Wei
Qian, Shiqing
Li, Jin
Xu, Guowei
Zhang, Buyue
Xu, Liai
Zhang, Zhihua
Chen, Dong
Liu, Hanwen
Liu, Heng
Wang, Lei
Li, Di
Zhu, Leilei
Wang, Jun
Zhao, Yanhua
Deng, Huiwen
Wang, Haonan
Wen, Shilong
Tian, Xisheng
Abrégé
A construction building equipment includes hanging pedestals, sleeve frames, hydraulic cylinders, upper reversing boxes, lower reversing boxes and track columns. The multiple hanging pedestals are fixed on an outer side of a shear wall of an external wall. The sleeve frames and the track columns are clamped on the hanging pedestals. The sleeve frames are clamped on outer sides of the track columns. The lower reversing boxes are fixed at upper ends of the sleeve frames. The hydraulic cylinders are connected with the upper reversing boxes and the lower reversing boxes. Side surfaces of the track columns are provided with pane holes for cooperative climbing of the upper reversing boxes and the lower reversing boxes. Upper ends of the track columns are fixedly connected with a top platform. Hangers and formworks are suspended on the top platform through booms.
China Constuction Science & Technology Group Co., Ltd (Chine)
CHINA STATE COSTRUCTION ENGINEERING CORPORATION LIMITED (Chine)
Inventeur(s)
Zeng, Tao
Guo, Haishan
Liu, Kang
Cao, Yuzhong
Qi, Hu
Li, Liming
Abrégé
The present disclosure discloses a method and system for tracing a quality of sleeve grouting based on a blockchain and a gathering terminal, wherein the method includes: step S1: establishing a unified standard of quality tracing and a standard of a method of gathering data; step S2: by using a gathering terminal, based on a grouting event, gathering in batch relevant tracing information, and forming the data fingerprint of the event, to ensure the integrity and non-repudiation of the on-chain data; step S3: performing blockchain distributed bookkeeping to the tracing information of sleeve grouting and a result of casual inspection; and step S4: realizing quality tracing of sleeve grouting based on a unified tracing interface and a safe access policy. The present disclosure can effectively solve one of the bottlenecks that restrict the scale development of the industry in the industrialization of novel constructions.
G06Q 10/06 - Ressources, gestion de tâches, des ressources humaines ou de projets; Planification d’entreprise ou d’organisation; Modélisation d’entreprise ou d’organisation
H04L 9/06 - Dispositions pour les communications secrètes ou protégées; Protocoles réseaux de sécurité l'appareil de chiffrement utilisant des registres à décalage ou des mémoires pour le codage par blocs, p.ex. système DES
H04L 9/32 - Dispositions pour les communications secrètes ou protégées; Protocoles réseaux de sécurité comprenant des moyens pour vérifier l'identité ou l'autorisation d'un utilisateur du système
G06T 17/00 - Modélisation tridimensionnelle [3D] pour infographie
37 - Services de construction; extraction minière; installation et réparation
Produits et services
Building construction supervision; providing construction
information; construction; factory construction; warehouse
construction and repair; masonry; demolition of buildings;
building insulating; damp-proofing of buildings;
bricklaying; road paving; asphalting; pipeline construction
and maintenance; pumicing; harbour construction; pier
breakwater building; underwater repair; scaffolding; rental
of construction equipment; rental of bulldozers; rental of
excavators; rental of cleaning machines; drilling of wells;
installation and maintenance of entertainment or sports
apparatus; mining extraction; quarrying services;
upholstering; upholstery repair; paper hanging; painting,
interior and exterior; painting or repair of signs; cleaning
of buildings [exterior surface]; cleaning of buildings
[interior]; window cleaning; installation of heating
systems; boiler cleaning and repair; irrigation devices
installation and repair; electric appliance installation and
repair; installation and repair of air-conditioning
apparatus; installation and repair of freezing apparatus;
office machines and equipment installation, maintenance and
repair; kitchen equipment installation; machinery
installation, maintenance and repair; installation,
maintenance and repair of computer hardware; interference
suppression in electrical apparatus; installation and
maintenance of medical devices; installation and maintenance
of sanitary apparatus; installation and maintenance of
illuminating apparatus; vehicle service stations [refuelling
and maintenance]; strong-room maintenance and repair;
rustproofing; re-tinning; furniture restoration; furniture
maintenance; pump repair; elevator installation and repair;
telephone installation and repair; burglar alarm
installation and repair; fire alarm installation and repair.
37 - Services de construction; extraction minière; installation et réparation
Produits et services
Building construction supervision; providing construction information; construction of government, educational, commercial, industrial, residential and public buildings, hotels, laboratories, sports arenas, medical institutions, roadways and bridges; factory construction; warehouse construction and repair; masonry; demolition of buildings; installation of building insulation; damp-proofing of buildings; bricklaying; road paving; asphalting; pipeline construction and maintenance; pumicing; harbour construction; pier breakwater building; underwater repair; scaffolding erection; rental of construction equipment; rental of bulldozers; rental of excavators; rental of cleaning machines; drilling of wells; installation and maintenance of seats, stages, playing surfaces, running machines, torso rotation machines, horizontal bars, parallel bars, rowing machines, and kin-riding machines at entertainment and sports venues; mining extraction; quarrying services; upholstering; upholstery repair; paper hanging; painting, interior and exterior; painting and repair of signs; cleaning of exterior building surfaces; cleaning of interior building surfaces; window cleaning; installation of heating systems; boiler cleaning and repair; irrigation devices installation and repair; electric appliance installation and repair; installation and repair of air-conditioning apparatus; installation and repair of freezing apparatus; office machines and equipment installation, maintenance and repair; kitchen equipment installation; machinery installation, maintenance and repair; installation, maintenance and repair of computer hardware; interference suppression in electrical apparatus; installation and maintenance of medical devices; installation and maintenance of hand basins, spigots and flush toilets; installation and maintenance of lights at sports and entertainment venues and public buildings; vehicle service stations for refueling and maintenance; strong-room maintenance and repair; rustproofing; re-tinning; furniture restoration; furniture maintenance; pump repair; elevator installation and repair; telephone installation and repair; burglar alarm installation and repair; fire alarm installation and repair
13.
Prestressed assembled concrete frame-joint connecting structure and constructing method thereof
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LIMITED (Chine)
China State Construction Academy Corporation Limited (Chine)
Inventeur(s)
Guo, Haishan
Qi, Hu
Liu, Kang
Wang, Dongyan
Li, Liming
Tian, Lida
Geng, Jiao
Li, Ming
Zhang, Haitao
Li, Tong
Yang, Xiaojie
Fan, Xin
Hou, Xueying
Zeng, Tao
Jiang, Lihong
Abrégé
The present disclosure relates to the technical field of assembled concrete frame structures, and discloses a prestressed assembled concrete frame-joint connecting structure and constructing method thereof. The present disclosure includes a prefabricated concrete column, a prefabricated concrete superposed beam, a composite slab, a post-tensioned prestressing tendon that connects the prefabricated concrete column and the prefabricated concrete superposed beam, a bending-resistant energy consuming steel bar and a shearing-resistant high-strength steel bar.
E04B 1/21 - Liaisons spécialement adaptées aux dites pièces porteuses
E04B 1/22 - Structures comportant des éléments porteurs allongés, p.ex. colonnes, poutres, ossatures les pièces porteuses étant en béton, p.ex. en béton armé, ou en un autre matériau pierreux les pièces étant précontraintes
E04C 3/26 - Poutrelles; Solives, fermes ou structures analogues à des fermes, p.ex. préfabriquées; Linteaux; Traverses en béton ou autre matériau analogue à la pierre, p.ex. avec armatures ou tirants précontraint
E04H 9/02 - Bâtiments, groupes de bâtiments ou abris conçus pour résister à des situations extérieures anormales, p.ex. à des bombardements, à des séismes ou à des climats extrêmes, ou pour se protéger de ces situations résistant aux séismes ou à l'effondrement du sol
E04B 1/58 - Assemblages pour les constructions du bâtiment en général d'éléments de construction en forme de barre
E04G 21/12 - Montage d'éléments d'armature; Application de la précontrainte
14.
Steel-plate-encased precast concrete column foot joint and construction method therefor
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LIMITED (Chine)
Inventeur(s)
Guo, Haishan
Li, Liming
Qi, Hu
Fan, Xin
Wang, Dongyan
Geng, Jiao
Tian, Lida
Liu, Kang
Li, Ming
Li, Tong
Xie, Yonglan
Abrégé
The column-base joint includes a prefabricated-reinforced-concrete column and a reinforced-concrete foundation, and further includes a coating-steel-plate sleeve that is integrally prefabricated with the concrete column and encloses an exterior of a column base. A gap is between a bottom end of the coating-steel-plate sleeve and an upper surface of the foundation. An outside of the gap is provided with a plugging material. The joint further includes an annular rib plate all of whose edges are horizontally and seamlessly connected to an inner wall of the coating-steel-plate sleeve and whose middle portion is provided with a rib-plate opening. The annular rib plate is provided with a sleeve opening that matches with the grouting sleeve device.
E04B 1/21 - Liaisons spécialement adaptées aux dites pièces porteuses
E04C 3/34 - Colonnes; Piliers; Arcs-boutants en béton ou autre matériau analogue à la pierre, avec ou sans éléments de coffrage permanents, avec ou sans armature interne ou externe, p.ex. recouvrements métalliques
E04H 9/02 - Bâtiments, groupes de bâtiments ou abris conçus pour résister à des situations extérieures anormales, p.ex. à des bombardements, à des séismes ou à des climats extrêmes, ou pour se protéger de ces situations résistant aux séismes ou à l'effondrement du sol
15.
Precast column base joint and construction method therefor
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LIMITED (Chine)
Inventeur(s)
Guo, Haishan
Qi, Hu
Liu, Kang
Li, Liming
Fan, Xin
Tian, Lida
Geng, Jiao
Wang, Dongyan
Abrégé
The joint has a prefabricated-reinforced-concrete column, a reinforced-concrete foundation, a column anchoring longitudinal bar, a grouting sleeve and a foundation anchoring steel bar. The foundation anchoring steel bar and the column anchoring longitudinal bar are connected by a seam filling material filling the grouting sleeve. A splicing seam between the reinforced-concrete foundation and the prefabricated-reinforced-concrete column is filled with the seam filling material. The foundation anchoring steel bar includes a vertical portion and a horizontal portion. The vertical portion includes an upper-portion anchoring section protruding out of an upper surface of the reinforced-concrete foundation, a middle-portion non-adhesive section buried within the foundation and a lower-portion anchoring section. An exterior of the middle-portion non-adhesive section is provided with an isolating sheath for isolating the middle-portion non-adhesive section and the concrete adhesion.
E04C 5/16 - Pièces auxiliaires pour armatures, p.ex. pièces de séparation, étriers
E04C 3/34 - Colonnes; Piliers; Arcs-boutants en béton ou autre matériau analogue à la pierre, avec ou sans éléments de coffrage permanents, avec ou sans armature interne ou externe, p.ex. recouvrements métalliques
E04H 9/02 - Bâtiments, groupes de bâtiments ou abris conçus pour résister à des situations extérieures anormales, p.ex. à des bombardements, à des séismes ou à des climats extrêmes, ou pour se protéger de ces situations résistant aux séismes ou à l'effondrement du sol
E04B 1/41 - Dispositifs d'assemblage spécialement adaptés pour être noyés dans du béton armé ou de la maçonnerie
E02D 27/42 - Fondations pour poteaux, mâts ou cheminées
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LIMITED (Chine)
Inventeur(s)
Zeng, Tao
Guo, Haishan
Liu, Kang
Cao, Yuzhong
Qi, Hu
Li, Liming
Abrégé
Disclosed are a blockchain-based sleeve grouting quality tracing method and system, and a collection terminal. The method comprises: step S1: establishing a unified quality tracing standard and a data collection method; step S2: collecting related traced information in batches based on a grouting event via the collection terminal, and forming a data fingerprint for the event to ensure the integrity and non-repudiation of uplink data; step S3: performing blockchain distributed accounting on the sleeve grouting traced information and a sampling result; and step S4: realizing sleeve grouting quality tracing based on a unified tracing interface and a security access policy. The system comprises a tracing standard module (1), a traced information collection terminal (2), a quality tracing BIM module (3), a traced information blockchain accounting module (4) and a query and tracing module (5). The method can effectively solve the problem of one of the bottlenecks restricting industrial scale development during new construction industrialization: the standard, method, tool, efficiency, security, supervision, etc. of sleeve grouting quality tracing.
G06Q 10/06 - Ressources, gestion de tâches, des ressources humaines ou de projets; Planification d’entreprise ou d’organisation; Modélisation d’entreprise ou d’organisation
17.
BLOCKCHAIN-BASED METHOD AND SYSTEM FOR TRACING QUALITY ACROSS WHOLE LIFE CYCLE OF PREFABRICATED COMPONENT
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LIMITED (Chine)
Inventeur(s)
Zeng, Tao
Guo, Haishan
Liu, Kang
Cao, Yuzhong
Yang, Xiaojie
Qi, Hu
Li, Liming
Abrégé
A blockchain-based method and system for tracing quality across the whole life cycle of a prefabricated component, wherein the method comprises: establishing a quality tracing standard for a prefabricated component the tracing information of which may be interconnected and internetworked (S1); acquiring and storing tracing information of a quality event at each node across the whole life cycle of the prefabricated component (S2); performing blockchain distributed accounting for the tracing information of the quality event at each node across the whole life cycle of the prefabricated component (S3); implementing quality tracing for each node across the whole life cycle of the prefabricated component on the basis of a uniform tracing interface and a security access policy (S4). The system comprises a uniform tracing standard module (1), a tracing information Internet of Things acquisition module (2), a tracing information blockchain accounting module (3), and a uniform querying/tracing module (4). The method may effectively solve the problems of standards, efficiency, trust, security and supervision for tracing the quality of a prefabricated component in a new building industrialization process.
G06Q 10/06 - Ressources, gestion de tâches, des ressources humaines ou de projets; Planification d’entreprise ou d’organisation; Modélisation d’entreprise ou d’organisation
HYDROPHOBIC SELF-CLEANING ANTI-STOKES FLUORESCENCE AND RADIATION REFRIGERATION COATING WITH SURFACE TEMPERATURE LOWER THAN ATMOSPHERIC TEMPERATURE DAY AND NIGHT AND PREPARATION METHOD THEREFOR
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LIMITED (Chine)
CHINA STATE CONSTRUCTION ACADEMY CORPERATION LIMITED (Chine)
CHINA ACADEMY OF BUILDING RESEARCH (Chine)
Inventeur(s)
Zhang, Weidong
Xue, Xiao
Yang, Zhuo
Li, Yanwen
Zhang, Tao
Feng, Ya
Zhong, Huizhi
Tian, Chunyu
Zhang, Hongqiang
Zhang, Ziying
Zhang, Rongpu
Qin, Jie
Abrégé
Disclosed are a hydrophobic self-cleaning anti-Stokes fluorescence and radiation refrigeration coating with the surface temperature being lower than the atmospheric temperature day and night and a preparation method therefor, the coating comprising 35-50 parts by weight of a hydrophobic styrene-acrylic emulsion, 10-20 parts by weight of a luminous pigment, 3-10 parts by weight of a stearate, 1-6 parts by weight of a talcum powder, 20-30 parts by weight of titanium dioxide, 3-5 parts by weight of auxiliaries, and 5-15 parts by weight of water. The method for preparing the coating comprises first mixing the components other than a thickening agent and a film-forming auxiliary, stirring and dispersing same at a high speed, then adding the thickening agent and the film-forming auxiliary, and uniformly dispersing same to obtain the coating.
C09D 7/00 - Caractéristiques de compositions de revêtement non prévues dans le groupe ; Procédés pour l’incorporation d’ingrédients dans des compositions de revêtement
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LIMITED (Chine)
Inventeur(s)
Yue, Yuliang
Qi, Yuesong
Yuan, Dongli
Sun, Pengcheng
Zhou, Hui
Abrégé
A cross-season cold and heat storage system comprises an ice source heat pump (2), an ice making unit (7), a cross-season energy storage tank (8), an energy releasing exchanger (11), an air conditioner pump (12), and a cooling heat storage pump (3). A condenser (21) in the ice source heat pump (2) sequentially communicates with the cooling heat storage pump (3) and a cooling tower (1) via a circulation pipeline, and also sequentially communicates with the cooling heat storage pump (3) and the cross-season energy storage tank (8) via the circulation pipeline, and also sequentially communicates with the air conditioner pump (12) and an air conditioner cold/hot terminal (13) via the circulation pipeline, thereby forming a circulation loop for heating the air conditioner cold/hot terminal (13) in winter. The system realizes cross-season cold and heat storage. Water is made into ice in winter for use in summer cooling, and in addition, heat discharged during cooling in summer is stored for winter heating, greatly reducing operational costs.
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LIMITED (Chine)
Inventeur(s)
Yue, Yuliang
Qi, Yuesong
Yuan, Dongli
Sun, Pengcheng
Zhou, Hui
Abrégé
The present invention discloses a trans-seasonal cold-storage heat-storage system, comprising an ice-source heat pump, an ice-making machine set, a trans-seasonal energy-storage tank, an exergonic heat exchanger, an air conditioning pump and a cooling heat-storage pump, wherein the condenser in the ice-source heat pump communicates sequentially with the cooling heat-storage pump and the cooling tower via a circulation pipeline, the condenser in the ice-source heat pump further communicates sequentially with the cooling heat-storage pump and the trans-seasonal energy-storage tank via a circulation pipeline, the condenser in the ice-source heat pump further communicates sequentially with the air conditioning pump and the air conditioning cold and heat terminal via a circulation pipeline, to form a circulation loop for supplying heat to the air conditioning cold and heat terminal in winter.
F28D 1/06 - Appareils échangeurs de chaleur comportant des ensembles de canalisations fixes pour une seule des sources de potentiel calorifique, les deux sources étant en contact chacune avec un côté de la paroi de la canalisation, dans lesquels l'autre source d avec canalisations d'échange de chaleur faisant partie du réservoir contenant la masse du fluide ou lui étant fixées
F28D 20/02 - Appareils ou ensembles fonctionnels d'accumulation de chaleur en général; Appareils échangeurs de chaleur de régénération non couverts par les groupes ou utilisant la chaleur latente
F28D 1/02 - Appareils échangeurs de chaleur comportant des ensembles de canalisations fixes pour une seule des sources de potentiel calorifique, les deux sources étant en contact chacune avec un côté de la paroi de la canalisation, dans lesquels l'autre source d avec des canalisations d'échange de chaleur immergées dans la masse du fluide
F28D 1/047 - Appareils échangeurs de chaleur comportant des ensembles de canalisations fixes pour une seule des sources de potentiel calorifique, les deux sources étant en contact chacune avec un côté de la paroi de la canalisation, dans lesquels l'autre source d avec des canalisations d'échange de chaleur immergées dans la masse du fluide avec canalisations tubulaires les canalisations étant courbées, p.ex. en serpentin ou en zigzag
F25B 25/00 - Machines, installations ou systèmes utilisant une combinaison des principes de fonctionnement compris dans plusieurs des groupes
F28D 20/00 - Appareils ou ensembles fonctionnels d'accumulation de chaleur en général; Appareils échangeurs de chaleur de régénération non couverts par les groupes ou
F24F 5/00 - Systèmes ou appareils de conditionnement d'air non couverts par ou
F25B 5/00 - Machines, installations ou systèmes à compression, avec plusieurs circuits d'évaporateurs, p.ex. pour faire varier la puissance frigorifique
21.
FULLY-ASSEMBLED PRESTRESS CONCRETE FRAME ANTI-SEISMIC ENERGY DISSIPATION MEMBER SYSTEM AND CONSTRUCTION METHOD
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LIMITED (Chine)
Inventeur(s)
Guo, Haishan
Li, Liming
Liu, Kang
Wang, Dongyan
Qi, Hu
Tian, Lida
Geng, Jiao
Fan, Xin
Li, Ming
Li, Tong
Xie, Yonglan
Abrégé
A fully-assembled prestress concrete frame anti-seismic energy dissipation member system, comprising a foundation (1), frame columns (2), overlapping main beams (4), anti-seismic energy dissipation members and overlapping floor slabs (5). The frame columns (2) are formed by splicing frame column units; the length of each frame column unit is two to four times greater than the storey height of the energy dissipation member system, and each frame column unit continuously penetrates at the position of a beam-column node; the splicing position of two adjacent frame column units is located 1m-1.5m above a top portion of an overlapping main beam (4) of a corresponding floor, and a column foot energy dissipation device is disposed at a root portion of a frame column (2). A construction method for a fully-assembled prestress concrete frame anti-seismic energy dissipation member system. The present invention solves the technical problems in existing assembled structural systems wherein wet operation quantity is high, construction is complex, and post-seismic reparation costs for a column foot are high, while costs are high and manufacturing is complex in disposing energy dissipation steel ribs within a beam.
E04H 9/02 - Bâtiments, groupes de bâtiments ou abris conçus pour résister à des situations extérieures anormales, p.ex. à des bombardements, à des séismes ou à des climats extrêmes, ou pour se protéger de ces situations résistant aux séismes ou à l'effondrement du sol
E04B 1/98 - Protection contre d'autres agents indésirables ou dangers contre les destructions mécaniques, p.ex. par les raids aériens
22.
MIXED-CONNECTION POST-TENSIONED PRESTRESSED ASSEMBLY CONCRETE FRAME ARCHITECTURE AND CONSTRUCTION METHOD THEREFOR
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LIMITED (Chine)
Inventeur(s)
Guo, Haishan
Li, Liming
Liu, Kang
Wang, Dongyan
Qi, Hu
Tian, Lida
Geng, Jiao
Fan, Xin
Li, Ming
Li, Tong
Xie, Yonglan
Abrégé
A mixed-connection post-tensioned prestressed assembly concrete frame architecture and a construction method therefor. Said frame architecture comprises a foundation (1), frame columns (2), frame beams (3) and floor plates (4); connection steel bars (5) are embedded in the designated positions, inside the foundation (1), corresponding to the frame columns (2); each connection steel bar (5) is in an L shape and comprises a vertical edge and a transverse edge connected to one side of the bottom end of the vertical edge; the lower portion of the vertical edge and the transverse edge of each connection steel bar (5) are embedded in the foundation (1), and the portion, embedded in the foundation (1), of the connection steel bar (5) comprises a connection steel bar bonding section (5.1) and a connection steel bar non-bonding section (5.2); the connection steel bar non-bonding section (5.2) is located on the position of the vertical edge where is on the lower side of the top surface of the foundation (1) and on the end close to the foundation (1), and the length of the connection steel bar non-bonding section (5.2) is 3-20 times the diameter of the connection steel bar (5); and the connection steel bar bonding section (5.1) is located on the position of the vertical edge where is on the lower side of the top surface of the foundation (1) and on the end close to the transverse edge, and is located on the transverse edge of the connection steel bar (5). The structural system and the construction method therefor solve the technical problems in an existing structural system such as, the transporting lifting being difficult, the structural robust performance being low, the wet working quantity being large, and the repairing cost of column feet after earthquakes being high.
E04B 1/19 - Structures à ossature tridimensionnelle
E04G 21/00 - Préparation, transport ou travail sur place des matériaux ou des éléments de construction; Autres dispositifs ou mesures concernant les travaux de construction
E04B 1/58 - Assemblages pour les constructions du bâtiment en général d'éléments de construction en forme de barre
E04B 1/98 - Protection contre d'autres agents indésirables ou dangers contre les destructions mécaniques, p.ex. par les raids aériens
23.
POST-TENSIONED PRESTRESSED ASSEMBLY-STYLE SYSTEM OF CONCRETE FRAMEWORK AND SHOCK-RESISTANT AND ENERGY-DISSIPATING COMPONENTS, AND CONSTRUCTION METHOD
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LIMITED (Chine)
Inventeur(s)
Guo, Haishan
Li, Liming
Liu, Kang
Wang, Dongyan
Qi, Hu
Tian, Lida
Geng, Jiao
Fan, Xin
Li, Ming
Li, Tong
Xie, Yonglan
Abrégé
A post-tensioned prestressed assembly-style system of a concrete framework and shock-resistant and energy-dissipating components, and a construction method. The system of concrete framework and shock-resistant and energy-dissipating components comprises a foundation (1), framework columns (2), stacked main beams (4), shock-resistant and energy-dissipating components, and stacked floor slabs (5). The framework columns (2) are in a layered distribution, concrete connecting layers (10) are cast between vertically adjacent layers of framework columns (2). The stacked main beams (4) comprise precast concrete main beams (4.1) and main beam concrete stacked layers (4.2). The stacked floor slabs (5) comprise precast hollow slabs (5.1) and floor concrete stacked layers (5.2) cast in place on top of the precast hollow slabs (5.1). Prestressed steel wire bundles (7) are post-tensioned prestressed steel wire bundles, comprising prestressed steel wire bundle bonded sections (7.1) and prestressed steel wire bundle non-bonded sections (7.2). The prestressed steel wire bundle bonded sections (7.1) are provided at the mid-span part of each precast concrete main beam (4.1) and are 2 m to 3 m in length. The system solves the technical problem of great difficulty in transport and lifting, low structural robustness performance, a large amount of wet work, high post-shock repair costs for column feet, and high costs and complex production for providing energy-dissipating reinforcing bars within beams of an existing structural system.
E04B 1/22 - Structures comportant des éléments porteurs allongés, p.ex. colonnes, poutres, ossatures les pièces porteuses étant en béton, p.ex. en béton armé, ou en un autre matériau pierreux les pièces étant précontraintes
24.
NODE CONNECTION STRUCTURE FOR PRESTRESSED PREFABRICATED CONCRETE FRAME AND CONSTRUCTION METHOD THEREOF
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LIMITED (Chine)
CHINA STATE CONSTRUCTION ACADEMY CORPORATION LIMITED (Chine)
Inventeur(s)
Guo, Haishan
Qi, Hu
Liu, Kang
Wang, Dongyan
Li, Liming
Tian, Lida
Geng, Jiao
Li, Ming
Zhang, Haitao
Li, Tong
Yang, Xiaojie
Fan, Xin
Hou, Xueying
Zeng, Tao
Jiang, Lihong
Abrégé
A node connection structure for a prestressed prefabricated concrete frame comprises a precast concrete column (1), a precast composite concrete beam (2), a composite floor (3), a temporary support (4) provided under a node, a bundle of post-tensioned steel bars (5), a bending-resistant energy-dissipating steel bar (6), and a shear-reinforced high-strength steel bar (7). The precast concrete column (1) and the precast composite concrete beam (2) are connected by means of the bundle of post-tensioned steel bars (5), the bending-resistant energy-dissipating steel bar (6), and the shear-reinforced high-strength steel bar (7). A post-cast layer (22) of the precast composite concrete beam (2) and a post-cast layer (32) of the composite floor (3) are formed integrally by casting. A high-strength gap-filling bonding material (8) is filled in a gap between the precast composite concrete beam (2) and the precast concrete column (1). The bending-resistant energy-dissipating steel bar (6) and the shear-reinforced high-strength steel bar (7) are arranged inside the post-cast layer (22) at an upper portion of the precast composite concrete beam (2). The bending-resistant energy-dissipating bar (6) is positioned above the shear-reinforced high-strength steel bar (7). Also provided is a construction method of the node connection structure for a prestressed prefabricated concrete frame. The node connection structure can be constructed very efficiently and has good shock and progressive collapse resistance, such that reconstruction can be performed efficiently after occurrence of an earthquake.
E04B 1/21 - Liaisons spécialement adaptées aux dites pièces porteuses
E04B 1/22 - Structures comportant des éléments porteurs allongés, p.ex. colonnes, poutres, ossatures les pièces porteuses étant en béton, p.ex. en béton armé, ou en un autre matériau pierreux les pièces étant précontraintes
E04B 1/38 - Assemblages pour les constructions du bâtiment en général
E04B 1/58 - Assemblages pour les constructions du bâtiment en général d'éléments de construction en forme de barre
E04G 21/12 - Montage d'éléments d'armature; Application de la précontrainte
25.
STEEL-PLATE-ENCASED PRECAST CONCRETE COLUMN FOOT JOINT AND CONSTRUCTION METHOD THEREFOR
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LIMITED (Chine)
Inventeur(s)
Guo, Haishan
Li, Liming
Qi, Hu
Fan, Xin
Wang, Dongyan
Geng, Jiao
Tian, Lida
Liu, Kang
Li, Ming
Li, Tong
Xie, Yonglan
Abrégé
A steel-plate-encased precast concrete column foot joint, comprising a prefabricated reinforced concrete column (2), a reinforced concrete foundation (1), and a steel-plate-encased cylinder (7) that is prefabricated integrally with the prefabricated reinforced concrete column (2) and encloses the exterior of a column foo; a gap is reserved between the bottom of the steel-plate-encased cylinder (7) and the upper surface of the reinforced concrete foundation (1); a plugging material (3) is additionally provided on the outer side of the gap. The column foot joint further comprises annular rib plate (8) with peripheral edges being in horizontal seamless connection with the inner wall of the steel-plate-encased cylinder (7) and the middle being provided with a rib plate hole (81); sleeve holes (82) adapted to grout sleeve devices (6) are formed in the annular rib plate (8); the steel-plate-encased cylinder (7), the annular rib plate (8), the plugging material (3), and the upper surface of the reinforced concrete foundation (1) form a closed joint cavity; the joint cavity is filled with a grouting material (13). Also disclosed is a construction method for a steel-plate-encased prefabricated concrete column foot joint.
E02D 27/42 - Fondations pour poteaux, mâts ou cheminées
E04C 3/34 - Colonnes; Piliers; Arcs-boutants en béton ou autre matériau analogue à la pierre, avec ou sans éléments de coffrage permanents, avec ou sans armature interne ou externe, p.ex. recouvrements métalliques
26.
PRECAST COLUMN BASE JOINT AND CONSTRUCTION METHOD THEREFOR
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LIMITED (Chine)
CHINA STATE CONSTRUCTION ACADEMY CORPORATION LIMITED (Chine)
Inventeur(s)
Guo, Haishan
Qi, Hu
Liu, Kang
Li, Liming
Fan, Xin
Tian, Lida
Geng, Jiao
Wang, Dongyan
Abrégé
A precast column base joint, comprising an upper prefabricated reinforced concrete column (1), a lower reinforced concrete foundation (2), column anchoring longitudinal ribs (3), grouting sleeves (4), and foundation anchoring reinforcing bars (6) that are correspondingly combined in a vertical direction. The foundation anchoring reinforcing bars (6) and the column anchoring longitudinal ribs (3) are connected by means of a seam filling material (7) with which the grouting sleeves (4) are filled; the seam between the reinforced concrete foundation (2) and the prefabricated reinforced concrete column (1) is also filled with the seam filling material (7); each of the foundation anchoring reinforcing bars (6) comprises a vertical part (8) and a horizontal part (9); the vertical part (8) is divided into an upper anchoring section (81) extending out of the upper surface of the reinforced concrete foundation (2), and a central unbonded section (82) and a lower anchoring section (83) embedded in the reinforced concrete foundation (2); an isolation sleeve (10) used for isolating the central unbonded section (82) from concrete is provided on the central unbonded section (82); the top surface of the isolation sleeve (10) is flush with the upper surface of the reinforced concrete foundation (2). Also provided is a construction method for a precast column base joint.
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LIMITED (Chine)
CHINA CONSTRUCTION FIRST BUILDING (GROUP) CORPORATION LIMITED (Chine)
Inventeur(s)
Lin, Bing
Fu, Tao
Chen, Wei
Hu, Zhongqi
Guo, Jing
Abrégé
A non-closed tower crane climbing frame device, comprising two C-shaped beams (1) arranged symmetrically. The C-shaped openings of the two C-shaped beams (1) are arranged oppositely and independent of each other; each C-shaped beam (1) consists of a primary beam (2) in the middle and two secondary beams (3) at the ends; the secondary beams (3) are perpendicularly fixed at the ends of the inner side of the primary beam (2), and are fastened by means of haunch plates (4); a connecting base (5) parallel to or coaxial with the secondary beam (3) and used for fixing to a support structure (8) is provided at each of the ends of the sides of the primary beams (2) away from each other; both the primary beams (2) and the secondary beams (3) are provided with propping devices (6) fastened to a main limb of a tower body (7) of the tower crane. The non-closed tower crane climbing frame device omits redundant restrictive linkage rods, reduces the installation, removal, and transportation workloads of a climbing frame, and saves the materials.
B66C 23/62 - Caractéristiques de structure ou détails
B66C 23/28 - Installations comportant essentiellement un palonnier, une flèche ou une structure triangulaire agissant comme bras de levier, montées de façon à permettre des mouvements de translation ou d'orientation dans des plans verticaux ou horizontaux, ou bie spécialement adaptées pour être utilisées dans des emplacements particuliers ou à des usages particuliers faites, p.ex. de pièces détachées, pour permettre un assemblage ou démontage rapides, pour travailler à des niveaux de plus en plus élevés, pour être transportées par route ou par rail faites pour travailler à des niveaux de plus en plus élevés
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LIMITED (Chine)
CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION CORP. LTD. (Chine)
Inventeur(s)
Lin, Bing
Cong, Jun
Zhang, Donghua
Hu, Zhongqi
Shi, Jingbin
Ma, Chunyuan
Qu, Long
Abrégé
A tower crane climbing frame device with a cable, comprising two parallel C-shaped beams (1). The C-shaped openings of the two C-shaped beams (1) are arranged oppositely and independent of each other; each C-shaped beam (1) consists of a primary beam (2) in the middle and two secondary beams (3) at the ends, and the secondary beams (3) are perpendicularly fixed at the ends of the inner side of the primary beam (2); a connecting member (4) is connected between two secondary beams of the same C-shaped beam (1); a connecting base (5) parallel to or coaxial with the secondary beam (3) and used for fixing to a support structure (9) is provided at each of the ends of the sides of the primary beams (2) away from each other; both the primary beams (2) and the secondary beams (3) are provided with propping devices (6) fastened to a main limb of a tower crane tower body (8). According to the tower crane climbing frame device with a cable, there is no linkage rod between the secondary beams on the same axis of two C-shaped beams, redundant restrictive linkage rods are omitted, the installation and removal, and transportation workload of a climbing frame is reduced, and materials are saved.
B66C 23/62 - Caractéristiques de structure ou détails
B66C 23/28 - Installations comportant essentiellement un palonnier, une flèche ou une structure triangulaire agissant comme bras de levier, montées de façon à permettre des mouvements de translation ou d'orientation dans des plans verticaux ou horizontaux, ou bie spécialement adaptées pour être utilisées dans des emplacements particuliers ou à des usages particuliers faites, p.ex. de pièces détachées, pour permettre un assemblage ou démontage rapides, pour travailler à des niveaux de plus en plus élevés, pour être transportées par route ou par rail faites pour travailler à des niveaux de plus en plus élevés
29.
TOWER CRANE CLIMBING FRAME AND STRUCTURAL SUPPORT BEAM INTEGRATED MECHANICAL DEVICE AND USING METHOD THEREOF
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LIMITED (Chine)
CHINA CONSTRUCTION FIRST BUILDING (GROUP) CORPORATION LIMITED (Chine)
Inventeur(s)
Lin, Bing
Cong, Jun
Hu, Zhongqi
Fu, Tao
Chen, Wei
Abrégé
A tower crane climbing frame and structural support beam integrated mechanical device and a using method thereof. The mechanical device comprises primary beams (1), secondary beams (2), linkage rods (3), propping devices (4), and climbing grip cushion blocks (5). There are two primary beams (1); both the primary beams (1) and the secondary beams (2) are provided with the propping devices (4) for fastening to a main limb of a tower crane tower body; the secondary beams (2) are perpendicularly connected to the inner sides of the primary beams (1) at the external ends of the propping devices (4) of the primary beams (1); two ends of the linkage rods (3) are connected to the secondary beams (2); the climbing grip cushion blocks (5) are located at the upper edges of the primary beams (1). The device is easy to install and remove, saves materials, eliminates adverse impacts caused by an unreasonable force transfer structure, improves structural safety, and is applicable to tower crane attachment modes such as internal climbing and external hanging.
B66C 23/62 - Caractéristiques de structure ou détails
B66C 23/28 - Installations comportant essentiellement un palonnier, une flèche ou une structure triangulaire agissant comme bras de levier, montées de façon à permettre des mouvements de translation ou d'orientation dans des plans verticaux ou horizontaux, ou bie spécialement adaptées pour être utilisées dans des emplacements particuliers ou à des usages particuliers faites, p.ex. de pièces détachées, pour permettre un assemblage ou démontage rapides, pour travailler à des niveaux de plus en plus élevés, pour être transportées par route ou par rail faites pour travailler à des niveaux de plus en plus élevés