A system for processing compounds having constituent materials of different mechanical characteristics to extract their constituent materials. The system includes (a) a grinder configured to grind a bulk compound material into an initial mixture of tiny particles; (b) a preimpact separator configured to separate the particles into two groups based on their respective mechanical properties, one group being a preimpact mixture comprising the compound particles; (c) a kinetic impactor configured to impact, via an acoustic shockwave, the compound particles of the preimpact mixture, thereby creating a postimpact mixture comprising (i) subparticles of 1st-constituent-material and (ii) reduced-compound particles comprising a 2nd constituent material; and (d) a postimpact separator configured to separate the reduced compound particles from the postimpact mixture based on a mechanical property.
B02C 19/00 - Autres dispositifs ou procédés de désagrégation
B02C 23/14 - Séparation ou triage de matériaux, associé au broyage ou à la désagrégation au moyen de plusieurs séparateurs
B02C 23/12 - Séparation ou triage de matériaux, associé au broyage ou à la désagrégation au moyen d'un séparateur situé dans le passage de décharge de la zone de broyage ou de désagrégation avec retour des matériaux hors dimension à la zone de broyage ou de désagrégation
B02C 23/08 - Séparation ou triage de matériaux, associé au broyage ou à la désagrégation
B03B 9/00 - Disposition générale d'un atelier de séparation, p.ex. schéma opératoire
B03B 9/06 - Disposition générale d'un atelier de séparation, p.ex. schéma opératoire spécialement adapté aux ordures
B03B 1/00 - Traitement pour faciliter la séparation, en altérant les propriétés physiques du matériau à traiter
B07B 15/00 - Combinaisons d'appareils à séparer les solides par voie sèche, applicables aux matériaux en vrac, p.ex. aux objets manipulés en vrac
2.
SUPPORT SYSTEM HAVING SHAPED PILE-ANCHOR FOUNDATIONS AND A METHOD OF FORMING SAME
Foundation systems and methods using in-situ shaped pile-anchors that are particularly adapted for use in aquatic environments. The shaped pile-anchor of the invented foundation includes a concrete filled tubular metal casing, the bottom end of which is positioned at a predetermined depth in the ground (e.g., aquatic-floor soil) and the top end of which protrudes above the water or soil surface. Concrete fills the inside the metal casing, substantially all the way to the top end of the casing, forming an upper portion of a concrete column. The lower portion of the concrete column extends down below the bottom end of the metal casing and further into the ground. The lower portion is shaped to have a cross-section greater than the cross-section of the upper portion, which equals to the inner diameter of the tubular metal casing. A platform is coupled to one of more of the shaped pile-anchors to support a structure above.
E02D 5/42 - Pieux en béton ou analogue coulés en place par utilisation de tubages ou autres coffrages utilisant la pression d'un liquide ou d'un gaz pour tasser le béton
E02D 5/34 - Pieux en béton ou analogue coulés en place
E02D 5/38 - Pieux en béton ou analogue coulés en place par utilisation de tubages ou autres coffrages
E02D 5/40 - Pieux en béton ou analogue coulés en place par utilisation de tubages ou autres coffrages en pleine eau
E02D 5/44 - Pieux en béton ou analogue coulés en place par utilisation de tubages ou autres coffrages ayant une base élargie ou des élargissements au bas du pieu
E02D 27/42 - Fondations pour poteaux, mâts ou cheminées