SIMPLE DISPERSING METHOD FOR BASALT FIBERS IN CONCRETE
Numéro d'application |
CN2022129168 |
Numéro de publication |
2023/103655 |
Statut |
Délivré - en vigueur |
Date de dépôt |
2022-11-02 |
Date de publication |
2023-06-15 |
Propriétaire |
- NO.7 ENGINEERING COMPANY OF CHINA RAILWAY NO.8 ENGINEERING GROUP CO., LTD (Chine)
- CHINA RAILWAY NO.8 ENGINEERING GROUP CO., LTD (Chine)
|
Inventeur(s) |
- Zhang, An
- Chen, Hao
- Chen, Jianshen
- Wang, Changyong
- Zou, Jun
- Zhu, Jiang
- Wang, Jiang
- Jiang, Jing
- Sun, Jiangming
- Shi, Ke
- Zhang, Jiajun
- Lei, Can
- Gao, Zhi
- Cen, Jian
- Deng, Ruli
- Lei, Chunmei
- Yang, Debing
- Zhang, Liang
- Fang, Xiang
- Dou, Weijun
|
Abrégé
The present invention relates to the technical field of concrete engineering. Specifically disclosed is a simple dispersing method for basalt fibers in concrete. The method specifically comprises the following steps: step S1: removing impurities, and changing the two ends of a basalt fiber from a cluster shape into a split shape; step S2: drying the basalt fibers, which have been subjected to impurity removal, to a constant weight, and cooling same to room temperature; step S3: placing the basalt fibers obtained in step S2 in a stirring pot for stirring, such that the two ends of a basalt fiber are provided with static electricity; and step S4: subjecting the basalt fibers having static electricity at two ends to a centrifugal treatment, such that the basalt fibers are dispersed. According to the present invention, when the basalt fibers are dispersed, chemical reagents are no longer used to change the potential energy of the fibers, such that the influence of the chemical reagents on human health during the dispersing process is effectively avoided; in addition, the chemical pollution caused by the chemical reagents is also avoided.
|
2.
|
RAPID MASONRY MORTAR DISTRIBUTION APPARATUS
Numéro d'application |
CN2020094804 |
Numéro de publication |
2021/139083 |
Statut |
Délivré - en vigueur |
Date de dépôt |
2020-06-08 |
Date de publication |
2021-07-15 |
Propriétaire |
- CONSTRUCTION COMPANY OF CHINA RAILWAY NO. 8 ENGINEERING GROUP CO., LTD. (Chine)
- CHINA RAILWAY NO. 8 ENGINEERING GROUP CO., LTD. (Chine)
|
Inventeur(s) |
- Wang, Siwei
- Peng, Ge
- Xiong, Jinlong
- Lai, Jiabing
- Xu, Tao
- Deng, Liping
- Ran, Hua
- Zheng, Xuejun
- Chen, Yu
- Li, Xianzheng
- Xiong, Chao
- Xu, Zhongbo
- Chen, Shanghong
- Li, Jingbo
|
Abrégé
A rapid masonry mortar distribution apparatus, comprising a main frame body (11) and a walking structure (12), wherein the main frame body (11) comprises two side walls (13) which are vertically provided and spaced from each other, and a bottom wall (14) and a top wall (15) that are respectively connected between the two side walls (13); slurry scraping sheets (32) capable of vertically rotating are respectively connected to inner side surfaces of the two side walls (13); each of the slurry scraping sheets (32) is elastically pressed towards a symmetrical surface direction of the two side walls (13) by means of an elastic piece (16); the bottom wall (14) is a triangle of which the thickness is gradually reduced from back to front, the front end of the triangle is a tip end (17), and a lower surface (18) of the bottom wall (14) is a horizontal plane in a horizontal direction, and an upper surface (19) is an inclined plane; the top wall (15) comprises a front wall section (20) and a rear wall section (21); a mortar supply channel (22) is formed between the rear wall section (21) and the upper surface (19) of the bottom wall (14); and the front wall section (20) and the two side walls (13) are enclosed together to form a mortar falling chamber (23) having a downward opening. The mortar distribution apparatus completes mortar supplying, falling and scraping and thickness control in one step, and has high efficiency of mortar distribution.
Classes IPC ?
- E04G 21/20 - Outils ou appareils pour appliquer le mortier
|
3.
|
Hydraulic end die of tunnel secondary lining trolley and construction method therefor
Numéro d'application |
16982038 |
Numéro de brevet |
11098585 |
Statut |
Délivré - en vigueur |
Date de dépôt |
2019-03-21 |
Date de la première publication |
2021-04-15 |
Date d'octroi |
2021-08-24 |
Propriétaire |
- NO. 3 ENGINEERING COMPANY OF CHINA RAILWAY NO 8 ENGINEERING GROUP CO., LTD. (Chine)
- CHINA RAILWAY NO. 8 ENGINEERING GROUP CO., LTD. (Chine)
|
Inventeur(s) |
- Mu, Jianlin
- Feng, Luwei
- Zeng, Bochuan
- Hu, Jian
- Li, Lianfang
- Feng, Deli
- Lan, Yong
- Zhou, Zifa
- Song, Hongbo
- Zeng, Xiangjun
- Wang, Shangbang
|
Abrégé
A hydraulic end die of a tunnel secondary lining trolley, comprises a trolley side die-end die assembly (6) and a trolley top die-end die assembly (10). The trolley side die-end die assembly is fixed at an outer ring of a trolley side die assembly (2) by means of a trolley side die-end die fixing device (3); the trolley top die-end die assembly is fixed at an outer ring of a trolley top die assembly (11) by means of a trolley top die-end die fixing device (8); and the trolley side die-end die assembly and the trolley top die-end die assembly are connected to a hydraulic control system by means of a trolley side die-end die hydraulic telescopic device (4) and a trolley top die-end die hydraulic telescopic device (9) respectively. Further disclosed is a construction method for a hydraulic end die of a tunnel secondary lining trolley. The hydraulic end die of the tunnel secondary lining trolley and the construction method therefor can conveniently and quickly mount and dismount the trolley end dies while accelerating the construction progress of tunnel secondary lining construction, thus reducing construction costs and improving labor productivity.
Classes IPC ?
- E21D 11/10 - Revêtement avec des matériaux de construction avec du béton coulé en placeCoffrage ou autre équipement adapté à cet effet
- E21D 11/38 - Imperméabilisation à l'eauCalorifugeageImperméabilisation acoustiqueIsolation électrique
|
4.
|
HYDRAULIC END DIE OF TUNNEL SECONDARY LINING TROLLEY AND CONSTRUCTION METHOD THEREFOR
Numéro d'application |
CN2019079038 |
Numéro de publication |
2019/184791 |
Statut |
Délivré - en vigueur |
Date de dépôt |
2019-03-21 |
Date de publication |
2019-10-03 |
Propriétaire |
- NO.3 ENGINEERING COMPANY OF CHINA RAILWAY NO.8 ENGINEERING GROUP CO., LTD. (Chine)
- CHINA RAILWAY NO.8 ENGINEERING GROUP CO., LTD. (Chine)
|
Inventeur(s) |
- Mu, Jianlin
- Feng, Luwei
- Zeng, Bochuan
- Hu, Jian
- Li, Lianfang
- Feng, Deli
- Lan, Yong
- Zhou, Zifa
- Song, Hongbo
- Zeng, Xiangjun
- Wang, Shangbang
|
Abrégé
A hydraulic end die of a tunnel secondary lining trolley, comprising a trolley side-die end die assembly (6) and a trolley top-die end die assembly (10). The trolley side-die end die assembly is fixed at an outer ring of a trolley side die assembly (2) by means of a trolley side-die end die fixing device (3); the trolley top-die end die assembly is fixed at an outer ring of a trolley top die assembly (11) by means of a trolley top-die end die fixing device (8); and the trolley side-die end die assembly and the trolley top-die end die assembly are connected to a hydraulic control system by means of a trolley side-die end die hydraulic telescopic device (4) and a trolley top-die end die hydraulic telescopic device (9) respectively. Further disclosed is a construction method for a hydraulic end die of a tunnel secondary lining trolley. The hydraulic end die of the tunnel secondary lining trolley and the construction method therefor may conveniently and quickly install and disassemble the trolley end dies while accelerating the construction progress of the tunnel secondary lining construction, thus reducing construction costs and improving labor productivity.
Classes IPC ?
- E21D 11/10 - Revêtement avec des matériaux de construction avec du béton coulé en placeCoffrage ou autre équipement adapté à cet effet
- E21D 11/38 - Imperméabilisation à l'eauCalorifugeageImperméabilisation acoustiqueIsolation électrique
|
5.
|
FINE REGULATION METHOD FOR RAIL BOARD OF PLATE TYPE NON-BALLAST RAIL
Numéro d'application |
CN2010079299 |
Numéro de publication |
2011/079674 |
Statut |
Délivré - en vigueur |
Date de dépôt |
2010-11-30 |
Date de publication |
2011-07-07 |
Propriétaire |
CHINA RAILWAY NO. 8 ENGINEERING GROUP CO., LTD. (Chine)
|
Inventeur(s) |
- Zhao, Zhi
- Xie, Lugao
- Qin, Ruiqian
- Wang, Zhiyong
- Bai, Kunhua
- Gong, Sikun
- Zhao, Daiqiang
- Mei, Hong
- Wan, Yi
- Du, Jianwu
- Song, Depei
|
Abrégé
A fine regulation method for a rail board of a plate type ballastless rail comprises the following steps. A total station instrument sets stations freely according to a control net of foundation piles Quick adjusting frames (1) are set on positions of three pairs of bolt holes (3) on front, middle and back of the rail board. The total station instrument measures coordinates of six small high precision prisms (2) on the quick adjusting frames (1 ), and transmits measured data to a working computer by a wireless module. A returned measured data is compared with a theoretical design value pre-input in the working computer. A deviation is calculated between an actual position and a design position by using a fine regulation measuring software for the rail board. A position of the rail board is regulated according to a regulation quantity displayed on the computer.
Classes IPC ?
- E01B 35/00 - Applications des appareils ou dispositifs de mesure à la construction des voies
|
6.
|
CONSTRUCTION METHOD FOR DOUBLE-BLOCK BALLASTLESS TRACK BED ON BRIDGE
Numéro d'application |
CN2010079300 |
Numéro de publication |
2011/079675 |
Statut |
Délivré - en vigueur |
Date de dépôt |
2010-11-30 |
Date de publication |
2011-07-07 |
Propriétaire |
CHINA RAILWAY NO.8 ENGINEERING GROUP CO., LTD. (Chine)
|
Inventeur(s) |
- Zhao, Zhi
- Xie, Lugao
- Qin, Ruiqian
- Wang, Zhiyong
- Bai, Kunhua
- Gong, Sikun
- Zhao, Daiqiang
- Mei, Hong
- Wan, Yi
- Du, Jianwu
- Song, Depei
|
Abrégé
A construction method for a double-block ballastless track bed on bridge includes the following steps: firstly, ensuring that the settlement of bridge meets the requirements of construction; secondly, cleaning up the surface of the bridge; thirdly, constructing a fender wall, an expansion joint and a waterproof layer; fourthly, laying a protective layer (1) and an embedding shear cam (5); fifthly, laying a separate layer (2); sixthly, assembling the track panels; seventhly, arranging a surface reinforced layer(3); eighthly, delicately regulating the panel tracks; ninthly, pouring concrete to form a track slab. The method can maintain the spatial position of the double-block track panels system during the whole construction and improves the precision of track-laying.
Classes IPC ?
- E01D 19/12 - Caillebotis ou planchéiage des pontsFixation des traverses de rails ou de voies sur les ponts
- E01B 29/06 - Transport, pose, enlèvement, ou remplacement des traverses
|
7.
|
CONSTRUCTION METHOD FOR SUPPORTING LAYER OF DOUBLE-BLOCK BALLASTLESS TRACK
Numéro d'application |
CN2010079301 |
Numéro de publication |
2011/079676 |
Statut |
Délivré - en vigueur |
Date de dépôt |
2010-11-30 |
Date de publication |
2011-07-07 |
Propriétaire |
CHINA RAILWAY NO. 8 ENGINEERING GROUP CO., LTD. (Chine)
|
Inventeur(s) |
- Zhao, Zhi
- Xie, Lugao
- Qin, Ruiqian
- Wang, Zhiyong
- Bai, Kunhua
- Gong, Sikun
- Zhao, Daiqiang
- Mei, Hong
- Wan, Yi
- Du, Jianwu
- Song, Depei
|
Abrégé
A construction method for a supporting layer of a double-block ballastless track comprises the following steps first, measuring and laying off datum lines, second, preparing mixture, third, producing and transporting mixture, forth, paving the mixture to form the supporting layer, fifth, checking appearance quality, sixth, manually deburring the supporting layer, seventh, cutting joints and curing the supporting layer, eighth, testing and evaluating the supporting layer.
Classes IPC ?
- E01B 1/00 - BallastAutres moyens pour supporter les traverses ou la voieAssèchement du ballast
- E01C 21/00 - Appareils ou procédés pour la stabilisation de la surface pour la construction des routes ou à des fins analogues, p. ex. en mélangeant des agrégats d'emprunt à un liant
- E01C 19/10 - Appareils ou installations pour mélanger ou enduire à l'avance des agrégats ou produits de remplissage avec des liants non hydrauliques, p. ex. avec du bitume, des résinesAppareils pour remélanger à nouveau les mélanges non hydrauliques avant de les mettre en place ou pour reconditionner les compositions non hydrauliques récupérées
- E01C 19/18 - Dispositifs pour répartir les matériaux d'empierrement mélangés à des liants, p. ex. au ciment, au bitume, sans effet de consolidation ou d'aplanissement
|
8.
|
CONSTRUCTION METHOD FOR DOUBLE-BLOCK BALLASTLESS TRACK BED ON SUBGRADE
Numéro d'application |
CN2010079302 |
Numéro de publication |
2011/079677 |
Statut |
Délivré - en vigueur |
Date de dépôt |
2010-11-30 |
Date de publication |
2011-07-07 |
Propriétaire |
CHINA RAILWAY NO. 8 ENGINEERING GROUP CO., LTD. (Chine)
|
Inventeur(s) |
- Zhao, Zhi
- Xie, Lugao
- Qin, Ruiqian
- Wang, Zhiyong
- Bai, Kunhua
- Gong, Sikun
- Zhao, Daiqiang
- Mei, Hong
- Wan, Yi
- Du, Jianwu
- Song, Depei
|
Abrégé
A construction method for a double-block ballastless track bed on subgrade includes the following steps: firstly, ensuring the settlement of subgrade meets the requirements of construction; secondly, cleaning up the surface of the subgrade; thirdly, laying a hydraulic concrete bearing layer (1); fourthly, hacking on the surface of the hydraulic concrete bearing layer (1); fifthly, assembling track panels; sixthly, arranging a surface reinforced layer (2); seventhly, delicately regulating the track panels; eighthly, pouring concrete to form a track slab. The method can maintain the spatial position of the double-block track panels system during the whole construction and improves the precision of track-laying.
Classes IPC ?
- E01B 1/00 - BallastAutres moyens pour supporter les traverses ou la voieAssèchement du ballast
- E01B 29/06 - Transport, pose, enlèvement, ou remplacement des traverses
|
|