China Railway Engineering Consulting Group Co., Ltd.

Chine

Retour au propriétaire

1-3 de 3 pour China Railway Engineering Consulting Group Co., Ltd. Trier par
Recheche Texte
Affiner par
Date
2022 1
2021 2
Classe IPC
E01B 25/08 - Voies pour monorails, le centre de gravité du véhicule étant au-dessus du rail porteur 1
E01B 25/10 - MonorailsRails auxiliaires d'équilibrageSupports ou connexions pour ces rails 1
E01D 1/00 - Ponts en général 1
E01D 19/00 - Détails des ponts 1
E01D 21/00 - Procédés ou appareils spécialement adaptés pour ériger ou assembler des ponts 1
Voir plus
Résultats pour  brevets

1.

PIER TOP SWIVEL METHOD FOR CONTINUOUS STEEL TRUSS

      
Numéro d'application CN2021130364
Numéro de publication 2022/151827
Statut Délivré - en vigueur
Date de dépôt 2021-11-12
Date de publication 2022-07-21
Propriétaire CHINA RAILWAY ENGINEERING CONSULTING GROUP CO., LTD. (Chine)
Inventeur(s)
  • Xu, Shengqiao
  • Peng, Lanping
  • Gao, Jingqing
  • Li, Yanming
  • Yang, Yongming
  • Gao, Ce
  • Jin, Zhengkai
  • Li, Xianting

Abrégé

A pier top swivel method for a continuous steel truss, comprising: performing cantilever assembly on a continuous steel truss on a pier top of a swivel pier (1) until a maximum cantilever state; swiveling the continuous steel truss to a preset position of a bridge; temporarily locking the continuous steel truss using a temporary support (7); installing a mid-span closure segment and a side-span post-assembly segment of the continuous steel truss; and installing a permanent support (10) below the continuous steel truss. According to the method, the temporary support (7) is provided on the pier top, supporting feet (9) and reinforcing cross struts (4, 51, 52) cooperate to disperse and reduce the concentrated stress condition of the steel truss, the problems that local rods of the steel truss are subjected to large stress and a joint structure is difficult to design are solved, thereby ensuring the pier top swivel of a continuous steel truss.

Classes IPC  ?

  • E01D 21/00 - Procédés ou appareils spécialement adaptés pour ériger ou assembler des ponts
  • E01D 21/08 - Procédés ou appareils spécialement adaptés pour ériger ou assembler des ponts par un mouvement de rotation du pont ou de sections du pont
  • E01D 1/00 - Ponts en général
  • E01D 19/00 - Détails des ponts

2.

CONSTRUCTION METHOD FOR REPLACEMENT OF GIRDER STRUCTURE OF BRIDGE

      
Numéro d'application CN2021099319
Numéro de publication 2021/254236
Statut Délivré - en vigueur
Date de dépôt 2021-06-10
Date de publication 2021-12-23
Propriétaire CHINA RAILWAY ENGINEERING CONSULTING GROUP CO., LTD (Chine)
Inventeur(s)
  • Guo, Ziyu
  • Xu, Shengqiao
  • Shen, Ping
  • Gao, Jingqing
  • Feng, Qi
  • Yin, Bin
  • Yu, Peng
  • Chen, Jinchang
  • Jiang, Zejun

Abrégé

The present invention relates to the technical field of bridge construction, and in particular to a construction method for the replacement of a girder structure of a bridge. According to the present invention, an old girder serves as both a construction access and a nose girder for a new girder; the demolition of the old girder and the installation of a new girder are carried out throughout the dragging process, thereby reducing the size of the temporary girder storage site; by means of the uninterrupted continuous dragging, the construction period is effectively shortened, and the cost is reduced; and no water-related project is involved, which is conducive to flood discharge and environmental protection. The present invention is applicable to the replacement of girders of existing long and large steel bridges on highways and railways, and can be popularized in reconstruction projects for steel bridges on existing lines.

Classes IPC  ?

  • E01D 22/00 - Procédés ou appareils pour réparer ou renforcer les ponts existants

3.

TOE-SHAPED TRACK BEAM AND STRADDLE-TYPE MONORAIL TRAFFIC SYSTEM

      
Numéro d'application CN2020110520
Numéro de publication 2021/189760
Statut Délivré - en vigueur
Date de dépôt 2020-08-21
Date de publication 2021-09-30
Propriétaire CHINA RAILWAY ENGINEERING CONSULTING GROUP CO., LTD. (Chine)
Inventeur(s)
  • Wu, Nong
  • Lv, Gang
  • Jiang, Xiaorui
  • Chen, Zhiguang
  • Liu, Jianyou
  • Lei, Huifeng
  • Wu, Maikui
  • Li, Wenjing
  • Cao, Yonggang
  • Wang, Sheng
  • Zhou, Jiangtian
  • Chen, Xuefeng
  • Ma, Fudong
  • Zhao, Qiaolan
  • Song, Yueguang
  • Zhong, Chonghai
  • Zhang, Xuan

Abrégé

Disclosed are a toe-shaped track beam and a straddle-type monorail traffic system. The toe-shaped track beam comprises: beam bodies, which are sequentially connected end to end; first flange plates, which are connected to one side of the bottoms of the beam bodies; second flange plates, which are connected to the other side of the bottoms of the beam bodies; and connecting positions, which are arranged on the first flange plates and/or the second flange plates and are used for being connected to a rail pillow block. According to the present invention, structures such as supports and anchor boxes do not need to be arranged in a tunnel, such that the cross section of the tunnel can be significantly reduced, the construction cost is reduced, all loads can be prevented from being intensively enacted on the bottom of the tunnel, and the force applied to the bottom of the tunnel is effectively and uniformly dispersed.

Classes IPC  ?

  • E01B 25/08 - Voies pour monorails, le centre de gravité du véhicule étant au-dessus du rail porteur
  • E01B 25/10 - MonorailsRails auxiliaires d'équilibrageSupports ou connexions pour ces rails